Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
20151013tcpp LPP Pump Station and GST Location
Lower Pressure Plane Pump StationPARTIALLYBURIEDPARTIALLYBURIEDGROUNDSTORAGETANKSOctober 13, 2015 Presentation Agenda•Site Options Reviewp•Buried GST Schematic•Existing Buried Tanks–Abilene TX 5.0 MG GST–Belton TX 3.0 MG GST–Bryan TX 3.0 MG GSTy–Frisco TX 10.0 MG GST–Geneva NY 3.0 MG GSTI iti lPhOPCC•Initial Phase OPCCs•Q&A Alternate Sites Review Buried GST SchematicDome HeightHeight of Exposed Wall Buried GST SchematicOption 2 Site = Approximate Maximum of 15’Option 3 Site = Approximate Maximum of 30’ Abilene TX 5.0 MG GST Belton TX 3.0 MG GST Bryan TX 3.0 MG GST•Brick Pilasters•Concrete CorniceSh•EIFSArches (Exterior Insulated Finish System) •Decorative Fencing Frisco TX 10.0 MG GST Geneva NY 3.0 MG GST Initial Phase Conceptual OPCCsOption 2Option 3•Construction:$26M•Construction:$27 3M•Construction: $26M•PS Property: $1.1M (8 ac. @ $143K/ac)•Engineering & Surveying: $3.2M•Total: $30.3M•Construction: $27.3M•PS Property: $1.6M (8 ac. @ $201K/ac)•Engineering & Surveying: $3.2M•Total: $32.1MCosts are based on high level concepts for comparison purposes in 2015 dollars. Pipeline easement costs are not included. Q&A