2021-55 - O - Adopting Fiscal Year 2021-2022 Annual Budget - 10.12.21TOWN OF PROSPER, TEXAS ORDINANCE NO. 2021-55 AN ORDINANCE OF THE TOWN COUNCIL OF THE TOWN OF PROSPER, TEXAS, ADOPTING THE FISCAL YEAR 2021-2022 ANNUAL BUDGET AND CAPITAL IMPROVEMENT PROGRAM FOR THE FISCAL YEAR BEGINNING OCTOBER 1, 2021, AND ENDING SEPTEMBER 30, 2022, FOR THE TOWN OF PROSPER, TEXAS; PROVIDING A SEVERABILITY CLAUSE; PROVIDING FOR A REPEALER CLAUSE; AND PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, the Annual Budget for the Town of Prosper, Texas, was prepared by the Town Manager and presented to the Town Council on August 10, 2021, in accordance with the Town Charter of the Town of Prosper, Texas; and WHEREAS, the proposed annual budget document was posted on the Town's Internet website and also made available for public review; and WHEREAS, a Notice of a Public Hearing concerning the proposed Annual Town Budget was published as required by state law and said Public Hearing thereon was held by the Town Council on August 24, 2021; and WHEREAS, following the Public Hearing, and upon careful review of the proposed Fiscal Year 2021-2022 Annual Budget, it is deemed to be in the best financial interests of the citizens of the Town of Prosper, Texas, that the Town Council approve said budget as presented by the Town Manager; and WHEREAS, in conjunction with the adoption of the Annual Town Budget, the Town also wishes to adopt its recommended Fiscal Year 2021-2022 Capital Improvement Program which includes budgeted revenues and expenditures for Fiscal Year 2021-2022 and planned revenues and expenditures for future years, as more fully described in said Capital Improvement Program. NOW, THEREFORE, BE IT ORDAINED BY THE TOWN COUNCIL OF THE TOWN OF PROSPER, TEXAS, THAT: SECTION 1 The above findings are hereby found to be true and correct and are incorporated herein in their entirety. SECTION 2 The official budget for the Town of Prosper, Texas, for the fiscal year beginning October 1, 2021, and ending September 30, 2022, is hereby adopted by the Town Council of the Town of Prosper, Texas, and the Town Secretary is directed to keep and maintain a copy of such official budget on file in the office of the Town Secretary and, upon request, make same available to the citizens and the general public. SECTION 3 The sums specified in Exhibit A are hereby appropriated from the respective funds for the payment of expenditures on behalf of the Town government as established in the approved budget document. SECTION 4 The Town Council hereby adopts the Fiscal Year 2021-2022 Capital Improvement Program, which is attached hereto as Exhibit B and fully incorporated by reference. SECTION 5 Should any part, portion, section, or part of a section of this Ordinance be declared invalid, or inoperative, or void for any reason by a court of competent jurisdiction, such decision, opinion, or judgment shall in no way affect the remaining provisions, parts, sections, or parts of sections of this Ordinance, which provisions shall be, remain, and continue to be in full force and effect. SECTION 6 All ordinances and appropriations for which provisions have heretofore been made are hereby expressly repealed if in conflict with the provisions of this Ordinance. SECTION 7 In accordance with state law and the Town's Code of Ordinances, proper Notice of Public Hearing was provided for said Ordinance to be considered and passed, and this Ordinance shall take effect and be in full force and effect from and after its final passage. SECTION 8 Specific authority is hereby given to the Town Manager to transfer appropriations budgeted from one account classification or activity to another within any individual department or activity. DULY PASSED AND APPROVED BY THE TOWN COUNCIL OF THE TOWN OF PROSPER, TEXAS, BY A VOTE OF jj,�) TO SON THIS THE 14TH DAY OF SEPTEMBER, 2021. APPROVED: t< Ray Smith, Mayor Town Secretary APPROVED AS TO FORM AND LEGALITY: - �� hJ'1QJ1 Terrence S. Welch, Town Attorney Ordinance No. 2021-55, Page 2 NM n O M N N N I- 1-o LO w m w O O In 0 O �_ CD � Lpa 0M N It M M LO N c) I.- 1-f I� CON M M In O CO M d' M m N M O r- M w O V- CD Cl) co N M t M O ti O Ln M- O Ln n Ow a N O 00 rl lO 1- LO N N CV - I-ci - N CO N C10 C7) CD Ln N Il N M C6 N N M O ti P- N LO n O LO N 0) O CA Q LO Il- w I- m w M O CO Nr CO `.V M r- - K Li CO LD M CO tt O I- � CD C'7 C�7 I� In CD M .- O O CO LO LO M CO O O N N N N _ .1 - CD � C 6 Q Z_ tL 69 H9 64 60 EA E» 64 Cf> to v% 69 Hi 63 CA en CA CH CF) CA w U/ N O O N O O O O L L L �. � r- 00 LO CD O O cc O O r- LO O CD I- V Cn 00 00 O CO O 00 Lu CM 00 N C7 O O� LO O O M N M CD N CO z N v- v�, v0 F Q - — cM M u V> 69 (f> CAL E,9 69 49 M M n LO LO N CO N I1- r-I�t O 00 00 O M O O LO M WI-t N M J p CD N* O M LO CD M r--It O N Cb O O O CO M N f` y) O N M OO I" M CA In �' CD M 00 N V M Cl at O O In M .- O CO M Q � ! 00 00 � LO CY) Mg N N IT CD N Ln Ln LO N P _ N OCD Z CO Cl) I-- N O O a) O O O LO PI -CO Ln CD O M O CO 'ITLO _ O CO CO O O V "I cq O r- rl- CO N CO C' - O O co LO LO CM co O O O Cn N. CD I'- LO It N I'- CM M I- Ln O N N N N - V 00 CD O QZ M CM N H 69 E,9 EA Cf! t4 69 E13 L~ O 00 M w M O O O O w I.- w N w Ln O Ln : LO w O LO N m M Ln N M O CO O Ln M N O O CD M CD 00 O co p t N LO N I� cl N CA N I�" N � � O O� O LO �'I N LO 00 ti O 7 N ,I-O LO 0 O w� O CD cM ti M M Ln O O M M Mr.- 04 m O V* Nr- It O CO CD O OO O I-- N N M M LO CD ;r M N n Q N LO LO P, N N O ti CD ti CD Ln Ln CD I� ' V OD V Ln CO Cl) IT PI- CDC N CO CD O Cl) U) Cl) M N M CD N f` N - -- M M M Ld CD Z N W aGq 6ri Q9 Gq 60:> it � N (U • V O Z O N r LL Li > rn N U) N u u O CO_) N U) C (0 C O N L to [L' O O CU"O E'c m-7O �+ - U) 0) na`) in vd� a,� c a) a E o a) c U V) c o E a� E> 'v� E °� a ° a O .� 7 0 0 C 0) N O Of y v QaU- w Z) Qj Lj J c N CV Q Q 0 w U CL t Ln Q wON Ln N _ u z o > �> m asLL O O R J U O O ~Ln ¢ v o v J i Cu 7 p u C j 0 0 m U) O LU LL a Q a o a g v n rC= j r L_ C7 y a`, Q. V J W O w wC3 In u o z w O O O Z 3 Z w Li- Z Q '"-° C w w R .t:: Lu > O > V 3 = H p ^ t Cl Z N a. O p w '^ NCN O O a Z w w u j 'CS w o2i J a 0 O C7 Z ` Qj Z w w ¢ O Q V)Lu Z •� .O 3 u ~ 0 U Lu > Q N O E E z O Z Lwi 0 Z a' a G N N v O H J x c v c, LU w w u u Q H L)J h w Q w CC Of a w 0 ir¢ n C H F u u a N U, > x � o Li m m a Lri U? O N O Summary of Capital Improvement Program - 2021-09-14 ADOPTED EXHIBIT B General Fund Projects 01 Funding Sources Unissued Debtc e u e a Street Projects Total Other Issued Debt Unissued Debt Unissued Debt Issued x Prior Years 2021.2022 2022.2023 2023.2024 2024.2025 2025.2026 2026.2031 Cost Sources Authorized GO CO 2020-2021 2021.2022 2022.2023 2023.2024 2024.2025 2025.2026 2026.2031 k -10 1512-ST First Street (DNT- Coleman): (Design) 2,786,567 2,786,567 2,439,915 AD 346,652 02 1512-ST First Street (DNT - Coleman): (Land/Esmt) 1,225,000 1,225,000 1,225,000 D 02 1512-ST First Street (DNT - Coleman): (Construction) 13,300,000 13,300,000 1,000,000 A 12,300,000 6,000,000 6,300,000 1709-ST Prosper Trail (Coif - Custer) - 4 lanes: (Design) 810,000 810,000 810,000 A 2008-ST Prosper Trail (Coit - Custer) - 2 lanes: (Construction) 6,422,068 6,422,068 1,372,068 aK 5,050,000 � : 2014-ST First Street (Colt - Custer) - 4 lanes: (Design) 1,085,000 1,085,000 1,085,000 07 2014-ST First Street (Coil - Custer) - 4 lanes: (Land/Esmt) 800,000 1,600,000 2,400,000 600,000 A 1,800,000 800.000 1,000.000 07 2014-ST First Street (Coit - Custer) - 4 lanes: (Construction) 18,600,000 18,600,000 1,280,000 A 17,320,000 17,320,000 i 2010-ST Fishtrap (Teel - Gee Road): (Design) 400,000 400,000 400,000 c i., 2010-ST Fishtrap (Teel - Gee Road): (Construction) 2011-ST Gee Road (Fishtrap - Windsong Retail): (Design) 250,000 6,025,000 6,025,000 250,000 250,000 c 6,025,000 6,025,000 12 2011-ST Gee Road (Fishtrap - Windsong Retail): (Land/Esmt) 30,000 30,000 30,000 30,000 12 2011-ST Gee Road (Fishtrap- Windsong Retail): (Construction) 3,520,000 3,520,000 3,520,000 3,520,000 2012-ST Fishtrap (Elem - DNT) - 4 lanes: (Design) 1,057,380 1,057,380 405,580 A o,K 651,800 us 15 2012-ST Fishtrap (Elem - DNT) - 4 lanes: (Land/Esmt) 1,700,000 1,700,000 1,700,000 1,700 000 15 2012-ST Fishtrap (Elem - DNT) - 4 lanes: (Construction) 17,300,000 700,000 18,000,000 18,000,000 17,300,000 700,000 1933-ST Fishtrap Segment 2 (PISD Reimbursement) 1,063,033 1,063,033 1,063,033 1,063,033 1710-ST Coit Road (First - Frontier) - 4 lanes: (Design) 1710-ST Coit Road (First - Frontier) - 4 lanes: (Land/Esmt) 1,289,900 800,000 1,289,900 800,000 1,289,900 Ax 800,000 800,000 19 19 1710-ST Coit Road (First - Frontier) - 4 lanes: (Construction) 19,850,000 19,850,000 19,850,000 19,850,000 2013-ST Teel (US 380 Intersection Improvements): (Design) 100,000 100,000 100,000 A,K 22 2013-ST Teel (US 380 Intersection Improvements): (Land/Esmt) 510,000 510,000 510,000 510,000 22 2013-ST Teel (US 380 Intersection Improvements): (Construction) 670,000 670,000 670,000 670,000 211 B-ST Preston Road / First Street Dual Left Turns (Design) 100.000 100,000 100,000 B,z 211E-ST Preston Road / First Street Dual Left Turns (Construction) 800,000 800,000 800,000 B.z 2121-ST Preston Road/ Prosper Trail Dual Left Turns (Design) 100,000 T 100,000 100,000 z 2121-ST Preston Road/ Prosper Trail Dual Left Turns (Construction) 800,000 800,000 800,000 A 1307-ST Frontier Parkway (DNT - Preston Road) 33,565.000 33,565,000 28.099,597 A,x 140,403 5,325,000 5,325.000 1805-ST FM 2478 (US 380 - FM 1461) 57,391,869 57,391,669 57,391,869 A•K•% 1934-ST DNT Overpass at US380 80,970,000 9,030,000 90,000,000 85,970.000 AJ,x 4,030,000 4,030.000 _ 2017-ST Fishtrap, Segment 4 (Middle - Elem) - 4 lanes: (Construction) 2,944,190 2,944,190 114,524 K 1,329,666 1,500,000 1,500,000 1936-ST US 380 (US 377 - Denton County Line)_ 178,105,000 _ 178,105,000 178,105,000 o,x 193E-ST FM 1461 (SH 289 - CR 165) 175,000 175,000 175,000_ 45,1.90,870 45,715,870 45,715,870 A.x _ _ 2140-ST Craig Street (Preston - Fifth): (Design) _ _ 300,666 300,000 300,000 _ _ _ 300,000 35 2140-ST Craig Street (Preston - Fifth): (Land/Esmt) _ _ 150,000 150,000 150,000 150.000 35 2140-ST Craig Street (Preston - Fifth): (Construction) 2,250,000 2,250,000 2,250,000 _ - _ 2.250,000 :. _ 2141-ST Coleman (Gorgeous - Prosper Trail) - 4 lanes: (Design) 450,000 450,000 450,000 o 38 2141-ST Coleman (Gorgeous - Prosper Trail) - 4 lanes: (Land/Esmt) 250,000 250,000 250,000 n 38 J _ _ 2141-ST Coleman (Gorgeous - Prosper Trail) - 4 lanes: (Construction) 4,800.000 4,800,000 4,800,000 4,800,000 2142-ST Coleman (Prosper Trail - Propser HS) - 2 SB lanes: (Design) _ 360,006 300,000 300,000 A 41 2142-ST Coleman (Prosper Trail - Propser HS) - 2 SB lanes: (Land/Esmt) 375,000 375,000 375,000 0 41 2142-ST Coleman (Prosper Trail - Propser HS) - 2 SB lanes: (Construction) 2,625,000 2,625,000 2,625,000 2,625,000 1937-ST DNT Main Lane (US 380 - FM 428): (Design) 35,000,000 35,000,000 x 1937-ST DNT Main Lane (US 380 - FM 428): (Construction) 315,000,000 315,000,000 _35.0_0_0.000 315,000.000 x 2143-ST Legacy (Prairie - Fishtrap) - 4 lanes: (Design) 2143-ST Legacy (Prairie - Fishtrap) - 4 lanes: (Land/Esmt) T 850,000 575.000 850,000 575,000 850,000 c 575,000 575,000 46 46 _ 2143-ST Legacy (Prairie - Fishtrap) - 4 lanes: (Construction) �_ 6,8DO,OOD 6,800,000 6,800,000 6,800.000 Parvin (FM 1385 - Legacy): (Design) _ _ , 800,000 850,000 _1,750,000 1,750.000 800,000 950,000 48 Parvin (FM 1385 - Legacy): (Land/Esmt) 2,000.000 2,000,000 2,000,000 2,000.000 49 Parvin (FM 1385 - Legacy): (Construction) 13,551I,ODD 13,550,000 13,550,000 13,550,000 Teel (US 380 - Fishtrap) - 2 NB lanes: (Design) 900,000 900,000 900,000 900,000 52 Teel (US 380 - Fishtrap) - 2 NB lanes: (Land/Esmt) 2,000.000 2,000,000 2.000.000 2.000.000 52 Teel (US 380 - Fishtrap) - 2 NB lanes: (Construction) 4,300,000 4,300,000 4,300,000 4,300,000__ Prosper Trail (Coif - Custer) - 2 WB lanes: (Design) 200,000 200,000 200,000 200.000 55 Prosper Trail (Colt - Custer) - 2 WB lanes: (Land/Esmt) 300,000 300,000 300,000 300,000 55 ProsperTrail(Coil- Custer)- 2 WB lanes: (Construction) Legacy (Fishtrap - Prosper Trail) - 2 SB lanes: (Design) 12,550,ODG 450.000 12,550,000 450,000 12.550,000 450,000 12,550.000 450,000 58 Legacy (Fishtrap - Prosper Trail) - 2 SB lanes: (Land/Esmt) 5o,on 50,000 50,000 50,000 58 Legacy (Fishtrap - Prosper Trail) - 2 SB lanes: (Construction) 6,000,000 6,000,000 6.000,000 6,000,000 Remaining Proposition 3: GO Bond Funds 4,450,000 4,450,000 4,450.000 4,450,000 Subtotal 387.151,974 71,963,033 25,705,000 360.190,870 900,0o0 D 83,730,00D 929,640.877 760,594,323 8,603,521 148,525,000 11,918,033 26,625,000 37,258,033 11,630,000 6,300,000 900,000 0 83,730,000 +. 7.778,847 37,100,000 800,000 0 900,000 0 1,600,000 48,178,847 -� - 60,231,258 30,578,033 14,900,000 315,000,000 0 0 72,725,000 493,434,291 316,641,869 175,000 9,205,000 45,190,870 0 0 4.450,000 375,662.739 r LandlEasements ^ 2.500,000 4,110,000 800,000 0 0 0 4.955,000 12,365.000 CO Bond Debt 6,825,000 1,063,033 4,030,000 0 0 0 0 GO Bond Debt 19,B00,000 30,195,000 7,600,000 6,300,000 900,000 0 83,730,000 Ordinance No. 2021-55, Page 4 a Traffic Projects K i Traffic Signal - Fishtrap & Windsong Parkway: (Design) Traffic Signal - Fishtrap & Windsong Parkway: (Construction) Traffic Signal - FM 2478 (Custer Rd) & First Street: (TxDOT) Traffic Signal - First Street & La Cima: (Design) Traffic Signal - First Street & La Cima: (Construction) 2101-TR Traffic Signal - Fishtrap & Artesia Boulevard: (Design) 2101-TR Traffic Signal - Fishtrap & Artesia Boulevard: (Construction) Traffic Signal - First Street & Coleman: (Design) Traffic Signal - First Street & Coleman: (Construction) Traffic Signal - Fishtrap & Legacy Drive: (Design) Traffic Signal - Fishtrap & Legacy Drive: (Construction) Traffic Signal - Richland _Blvd & Walmart/Pandera (Design) Traffic Signal - Richland Blvd & Walmart/Pandera (Construction) y ] Remaining Proposition 3: GO Bond Funds „ Subtotal r- �-ITJ 1 Land/Easements Prior Years 0 0 0 0 0 2021.2022 0 0 0 0 0 2022.2023 50,000 425,000 500,000 50,000 400,000 1,425,000 100,000 825,000 500,000 0 Summary 2023.2024 0 0 0 0 0 of Capital Improvement General 2024.2025 2025.2026 0 0 0 0 0 0 0 0 0 0 Program Fund 2026.2031 50,000 425,000 50,000 425,000 65,000 460,000 65,000 460,000 475,000 2,475,000 230,000 1,770,000 475,000 0 - 2021-09-14 Projects Total cost 50,000 425,000 500,000 50,000 400,000 50,000 425,000 50,000 425,000 65,000 460.000 65,000 460,000 475,000 31900,000 330,000 2,595,000 975,000 0 ADOPTED Other Sources 500,000 50,000 400,000 65,000 460,000 1,475,000 x A A A A Issued Debt Authorized 50,000 425,000 475,000 EXHIBIT B Funding Sources Unissued Debt Schedule Unissued Debt Unissued Debt Issued GO CO 2020.2021 2021.2022 2022-2023 2023.2024 2024.2025 50,000 425,000 65.000 460,000 475,000 1,475,000 01 0 r 0 0 0 0 CO Bond Debt 0 0 0 0 0 GO Bond Debt 0 0 0 0 0 Funding Sources Unissued Debi Schedule 02 a 2025.2026 2026.2031 x 50.000 425,000 65,000 460,000 L; 475,000 0 1 1.475.000 0 0 0 1,475,000 3 a Park Projects Total Other Issued Debt Unissued Debt Unissued Debt Issued a N k N K Prior Years 2021.2022 2022-2023 2023.2024 2024.2025 2025.2026 2026.2031 Cost Sources Authorized GO CO 2020.2021 2021-2022 2022.2023 2023.2024 2024.2025 2025.2026 2026.2031 Neighborhood Park Tanners Mill Park: (Construction) 468,000 468,000 468,000 c $ Star Trail Park #2 (7.5 Acres / No Lights): (Construction) 535,000 535,000 535,000 c Star Trail Park #3 (7.5 Acres/ No Lights): (Construction) 535.000 535,000 535,000 c �'• Windsonq Ranch Park #2 (7.5 Acres / No Lights): (Design) 30,000 30,000 30,000 c 2144-PK Windsong Ranch Park #2 (7.5 Acres / No Lights): (Construction) 230,000 230,000 230,000 c Lakewood Preserve (22 Acres / Lights): Construction) 1802-PK Hays Park (2 Acres / No Lights): (Design ) 967,500 85,000 967,500 85,000 967,500 85,000 c G 1801PK Hays Park (2 Acres / No Lights): (Construction) 375,000 375,000 375,000 D 2015-PK Pecan Grove Phase 2 (21.5 Acres / No Lights) (basketball, pavilion, 67,500 67,500 500 D 67,000 parking, security lighting): (Design) 2145-PK Pecan Grove Phase 2 (21.5 Acres I No Lights) (basketball, pavilion, 575.000 575,000 575,000 G parking, security lighting): (Construction) 2146-PK Prairie Park (6.7 Acres / No Lights) 300,000 300,000 600,000 600,000 c 2107-PK Lakewood Preserve, Phase 2 (22 Acres/Lights): (Construction) 2,100,000 1,745,000 3,845,000 1,745.000 D z 2,100,OOD 2,100,000 2108-PK Tanner's Mill, Park, Phase 2: (Design) 100,000 100,000 100,000 100,000 2108-PK Tanners Mill, Park, Phase 2: (Construction) 930,000 930,000 930,000 930,000 Windsong Park #3: (Design) 200,000 200,000 200,000 200.000 Windsong Park #3: (Construction) 930,000 930,000 930,000 930.000 Town Hall Open Space: (Design) 200,000 200,000 200,000 200,000 Town Hall Open Space: (Construction) 1,810,000 1,810,000 1,810,000 1,810,000 r Un-named Neighborhood Park: (Design) 200,000 200,000 200,000 200,000 On -named Neighborhood Park: (Construction) 930,000 930,000 930.000 930.000 i x Trails 1801-PK Whitley Place H&B Trail Extension: (Design) 70,000 70,000 70,000 c 1910-PK Hike and Bike Master Plan: (Design) 68,000 68,000 68,000 D Star Trail H&B Trail Phases 1, 2, 3, and 4: (Construction) 200,000 200,000 200,000 c 1926-PK Whitley Place H&B Trail (OH Easement): (Design) 10,000 10,000 10,000 1926-PK Whitley Place H&B Trail (OH Easement): (Construction) 270,000 270,000 270000 1801-PK Whitley Place H&B Trail Extension: (Construction) 680,000 680,000 500,000 c 180:000 Windsong H&B Trail Ph 3C,5,6A, 6B, 7, 8, and 9: (Design= 40,000 40,000 40,000 c g 2147-PK Windsong H&B Trail Ph 3C,5,6A, 6B, 7, 8, and 9: instruction) 1,351,572 435,000 495,000 2,281,572 2,281,572 c Various Hike and Bike Trails 1,000,000 1'000,000 1,000.000 _ _ _ _ _ _ _ 1,0_00,000 i 2119-PK Westside Waterline Trail Connection 800,000 800,000 8D0,000 800,000 2120-PK Gee Rd. Trail Connection 700,000 700,000 700.ODD 700,000 Prosper Center Park Trail Connection 900,000 900,000 900,000 900,000 Community Park 2122-PK Sexton Park, Phase 1: (Design) 1,200,060 f 1,200,000 1,200,000 1,200,000 Sexton Park, Phase 1: (Construction) _ 5,375_,_000 _ 7.125,000 12,500,000 12,500.000 5,375,000 7,125.000 Un-named Community Park: (Design) _ _ 550,000 550,000 550,000 550,000 Un-named Community Park: (Construction) _ _ _ _ 4.950,000 4,950,000 4,950,000 4.950.000 Medians } 1816-PK Additional Turf Irrigation SH 289 68,000 _ _ _ _ _ 68,000 68,000 D ]! 1813-PK SH 289/US 380 Green Ribbon Landscape Irrigation 821,250 821,250 821,250 Bo • � 2019-PK Coleman Street Median Landscaping (Talon -Victory): (Design) 30,000 30,000 30,000 A 2018-PK Street Median Landscaping (Talon - Victory): (Construction) 454,025 454,025 454.025 _Coleman 2149-PK Coleman Street Median Landscaping (Victory - Preston) (Design) 25,000 25,000 25,000 D 2146-PK Coleman Street Median Landscaping (Victory - Preston)(Construclion) 625,000 625,000 625,000 D 2149-PK Prosper Trail (DNT - 700' East) Median Landscaping (Design) 25,000 25,000 25,000 D 2149-PK Prosper Trail (DNT - 700' East) Median Landscaping (Construction) 250,000 250,000 250,000 D 2150-PK US 380 Green Ribbon Lndscp- Irrigation (Lovers - Mahard): (Design) 90,000 90,000 90,000 D,o 2150-PK US 380 Green Ribbon Lndscp-Irrigation (Lovers - Mahard): (Constr.) 1,100,000 1,100,000 1,100,000 D,D Subtotal 9,090,847 7,130,000 800,000 7,505,000 7,125,000 0 11,670,000 43.320.847 12.793.847 527,000 30,000,000 0 2,200,000 2,830,000 800,000 5,375,000 7,125,000 0 11,670,000 500,500 1,340,000 0 0 0 0 1,150,000 2,990,500 CO Bond Debt 0 0 0 0 0 0 0 MM =:P NL.=nd/Ea....n1. 8,590.347 5,090,000 0 i,505,000 7,125,000 0 8,620,000 36,930,347 GO Bond Debt 2,200,000 2,830,000 800,000 5,375,000 7,125,000 0 11,670,000 0 700,000 800.000 0 0 0 1,900.000 3,400,000 0 0 0 0 0 0 0 0 Ordinance No. 2021-55, Page 5 Summary of Capital Improvement Program - 2021-09-14 ADOPTED EXHIBIT B General Fund Prniects 03 Funding Sources Unissued Debi Schedule C Facility Projects Total Other Issued Debt Unissued Debt Unissued Debt Issued a k Prior Years 2021.2022 2022.2023 2023.2024 2024.2025 2025.2026 2026.2031 cost Sources Authorized GO CO 2020-2021 2021-2022 2022.2023 2023.2024 2024.2025 2025.2026 2026.2031 x 2102-FC Radio Tower for Communications 500,000 MIND 500,D00 50010D0 A. 2109-FC Public Safety Complex, Phase 2 (Central FS & Admin) (Design) 1.555.615 1,555,615 1.555.615 1.605.000 2111-FC Public Safety Complex, Phase 2 (Central FS & Admin) (bevel Costs) 670,DD0 670,000 670.000 820,000 2112-FC Public Safety Complex, Phase 2 (Central FS & Admin) (Construction) 14,500,6W 14,500,000 14.500,606 14,306,000 2113-FC Public Safety Complex, Phase 2 (Central F_ S & Admin) (FF&E) 1.274,385 1,274,385 1,274.385 1.275,ODO - Fire Station #4 (Design) 600,000 600,000 6DO,OOD 600.000 Fire Station #4_(ConstrucUon) 5,400,000 5,400,000 5.400,ODD 5R00,000 08 2105-EQ Quint Engine - Fire Station #3 1,350.000 1,350,000 1,350,000 n 08 09 2106-EQ Ambulance - Fire Station #3 460,000 460,000 460,OOD o 09 10 Fire Engine - Fire Station #4 1,100,000 1,100,000 1,100,000 0 10 2t23-FO Park$ & Public Works Needs Assessment 80,000 80,060 80,00D e Public Safety Tr4inrng Facility, Place 1 (Design) 600.000 600,000 600.000 600.000 Public Safety Training Facility, Phase 1 tConstruction) 5.400.000 5.400,000 5.4DO.ODO 5.400.01M Subtotal 20,3102000 1,780.000 5.400.000 0 0 0 6,000,000 33,490,000 2.990,000 0 30,000,000 500000 18.500.000 600.000 5,400,000 0 0 0 6,000,000 2,225,615 680,000 0 0 0 0 600,000 3,505,615 15,774,385 0 5,400,000 0 0 0 5.400.000 26.574,385 500,000 0 0 0 0 0 0 500,000 1,810,000 1,100,000 0 0 0 0 0 2,910.000 CO Bond Debt $ 500,000 0 0 0 0 0 0 GO Bond Debt $ 18,000,000 600,000 5,400,000 0 0 0 6,000,000 Grand Total General Fund 416,552,821 00,873.033 33,330.000 367.695,870 9,025,000 0 1 103,975.000 1 1,010.351,724 1 777.853.170 9,605,521 210,000.000 12,416,033 1 47.325.000 1 34,688,033 17,830,000 11,676.000 8.025,000 0 102,875,000 • 10,504,962 39,120,000 900,000 0 900,000 3.580.000 55.004,962 CO Bond Debt $ 7,325,000 1,063,033 4,030,000 0 0 0 0 Vonatmetion 84,595,990 35,668,033 21,125,000 322,505,000 7-1,25,000 88,515,000 559,534,023 GO Bond Debt 40,000,000 33,625,000 13,800,000 11,675,000 8,025,000 0 102,875,000 V_• . 317,141,869 875,000 10,505,000 45,190,870 0 6,825,000 380,537.739 Land/Essemertts 4,310,000 5,210,000 800,000 0 0 4,955,000 15,275,000 Description Codes - Other Sources A Impact Fees D General Fund G Park Development Fund K Escrows B Grant end Intanocal Funds E Water / Wastewater Fund H TIRZ #1 X Non -Cash Contributions C Developer Agrournenta F Stormwater Drainage Fund J TIRZ #2 Z Other Sources (See Detail) Ordinance No. 2021-55, Page 6 EXHIBIT B Summary of Capital Improvement Program - 2021-09-14 ADOPTED 04 Enterprise Fund Projects Funding Sources Unissued BeSt Schedule C CWater Projects Total Other Issued Debt Unissued Debt Unissued Debt Issued a X x >< Prior Years 2021-2022 2022.2023 2023.2024 2024.2025 2025.2026 2026.2031 Cost Sources Authorized GO CO 2020-2021 2021.2022 2022-2023 2023.2024 2024.2025 2025 2026 2026.2031 1902-WA Custer Road Meier Station and WL Relocations: (Design) 359,225 359,225 359,225 e ' 02 02 1902-WA Custer Road Meier Station and WL Relocations: (LandlEasements) 53,244 53,244 53.244 E 1902-WA Custer Road Meter Station and WL Relocalioris: (Construction) 3.454.363 3.464,363 3.454.363 r ] 1501-WA LPP Pump Station and LPP WL Pe 2: has(Dealgn) 1,585.100 1.685,100 277.081 A 1.308,019 ' 1501-WA LPP Pump Station Phase 2: (Construction) 14.002,000 14.062.000 12,000,000 A,e 2,062,000 2,062,000 ,s;,:V/A LPP WL Phase 2A: (Construction) 8.684.00D 9,684,000 8.584.000 8.6111.000 07 1810-WA LPP Water Line Phase 2A Easement Costs 100000 900.Oo0 1.000,000 1.000.000 A 1.400,000 07 ' LPP Future Expansion (2026): (Design) 1.400.W0 1.400,000 1.406.000 LPP Future Expansion (2026j: (Construction) 12.600.000 12,600,000 12.600,000 12,e00.000 1030-WA $roadway (Parviri-Cfaig): (ConatructiW) 150,000 150.000 350,U00 F. Subtotal 5,701,932 23,646,500 0 0 0 0 14.000,000 43,347,932 17,293,913 1 1,308,019 0 24,746,000 01 10,746,000 0 0 0 0 14,000,000 1,944,325 ON 0 0 0 0 1,400,000 3,344,325 S1:r 3,604,363 22,746,000 0 0 0 0 12,600,000 38,950,363 0 0 0 0 0 0 0 I-andlEasements 153,244 900,000 0 0 0 0 0 1,053,244 --gunding ources Unissued Debt Scheaule S CL Wastewater Projects Total Other Issued Debt Unissued Debt Unissued Debt Issued a m >< x Prior Years 2021.2022 2022.2023 2023.2024 2024.2025 2025.2026 2026.2031 cost Sources Authorized GO CO 2020.2021 2021.2022 2022-2023 2023.2024 2024.2025 2025-2026 2026.2031 e 2103-WW Doe Branch Parallel Interceptor:_(Design) 500.000 500,000 500.000 A ' 210.3-WW Doe Branch Parallel Interceptor:(ConstrucU_on) 4,500,000 4,500,080 1,000,000 A 3,500,000 3,500,000 r Doe Branch• Phase 3 WWTP: (Design) 1,450,000 0 1,450,000 1.450.0.00 A ' Doe Branch, Phase 3 WWTP: (Constructim) 13.050,00D 13,050AD 8.000.000 Ae 5.050,000 5.050,000 Subtotal 0 5,000,000 14,500.000 0 0 0 1 0 19.500.000 10,950,000 0 0 8,550,000 0 3,500,0D0 6,050,000 0 0 0 0 r- 0 500,000 1,450.000 0 0 0 1,950,000 0 4.500,000 13,050,000 0 0 0 17,550,000 Design & Construction 0 0 0 0 0 0 0 Land/Easements 0 0 0 0 0 0 0 Funding Sources Unissued Debt Schedule a Drainage Projects Total Other Issued Debt Unissued Debt Unissued Debt Issued Q. x Prior Years 2021-2022 2022.2023 2023-2024 2024.2025 2025-2026 2026-2031 Cost Sources Authorized GO CO 2020-2021 2021-2022 2022.2023 2023 2024 2024 2025 2025 2026 2026.2031 r 2003-DR Frontier Park/Lakes of Prosper Drainage_ (Design) 100.000 100.000 100,0130 r _ _ _ _ _ 2003-DR Frontier Park/Lakes of Prosper Drainage: (Conslruci onL 985.000 905.000 300,000 E85,00" 685,000 Subtotal 100,000 985,000 0 0 0 0 0 1,085,000 400,000 0 0 665,000 0 685,000 D 0 0 0 0 r- 100,000 0 0 0 0 0 100,000 7,rrr1; rr 11t:r 0 985.000 0 0 0 0 985,000 Design & Construction 0 0 0 0 0 0 0 Land/Easements 0 0 0 0 0 0 0 Grand Total Enterprise Funds 5,301,932 29.631.000 14,500,000 0 0 0 1 14.000,000 63,932,932 28,643,913 1.306,019 0 33,981,000 01 14,931,000 5.050.000 0 0 0 1 14,o00 0:0D - 2,044,325 500,000 1,450,000 0 0 0 1,400,000 5,394.325 3,604,363 28,231,000 13.050,000 0 0 0 12,600,000 57,485,363 Design & Construction 0 0 0 0 0 0 0 0 Land/Easaments 153,244 900,000 0 0 0 0 0 1,053,244 Description Codes - Other Sources A Impact Fees D General Fund G Park Development Fund K _ Escrows B Grant and Interlocal Funds F We tat ! Wasiewatar Fund H TIRZ #1 X Non -Cash Contributions 1 C Developer Agreements F Stormwaler Drainagu Fund J TIRZ #2 Z Other Sources (See DaL1rl) Ordinance No. 2021-55, Page 7 Summary of Capital Improvement Program - 2021-09-14 ADOPTED Capital Improvement Program Summary EXHIBIT B Capital Improvement Program Summary Prior Years 2021.2022 2022.2023 2023.2024 2024.2025 2025-2026 2026.2031Sources Other Issued Debt Authorized Funding Sources Unissued Debt Unissued Debt GO CO Issued 2020-2021 2021-2022 2022.2023 2023.2024 2024.2025 2025.2026 2026.2031 General Fund 416,552,821 80.873.033 33.330,000 367.695.870 8.025.000 103.875,000 E1,074284,656 777,853,170 9,605.521 210,000.000 12,418,033 47,325,000 34.688,033 17.830.000 11.675.000 8.025.000 0 102.875.000 Enterprise Funds 5.801.932 29.631.000 14.500.000 0 0 14.000,000 28.643.913 1.308.019 0 33,981,000 0 14.931,000 5,050.000 0 0 0 14.000.000 Grand Total Capital Improvement Program 422,354,753 110,504,033 47,830,000 367,695,870 8,025,000 117.875,000 806,497,083 10,913,540 210,000.000 46,399,033 47,325,000 49,619,033 22,880,000 11,675,000 8,025,000 0 116.875.000 CO Bond Debt 7,325,000 15,994,033 9,080,000 0 0 0 14,000,000 GO Bond Debt 40,000,000 33,625,000 13,800,000 11,675,000 8,025,000 0 102,675,000 Design 12,549,287 39,620,000 2,350,000 0 900,000 4,980,000 60,399,267 88,200,353 63,899,033 34,175,000 322,505,000 7.125.000 101,115,000 617,019,386 V"Qri!g Construction 317,141,869 875,000 10,505,000 45,190,870 0 6,825,000 380,537,739 LandlEassments 4,463,244 6,110,000 800.000 0 0 4,955,000 16,328,244 Ordinance No. 2021-55, Page 8