10.13.20 Town Council Regular Meeting Packet
Page 1 of 4
]
Prosper is a place where everyone matters.
Notice Regarding Public Participation
Governor Greg Abbott has granted a temporary suspension of certain rules to allow for telephone
or videoconference public meetings in an effort to reduce in-person meetings that assemble large
groups of people, due to the COVID-19 public health emergency.
Individuals may attend the Prosper Town Council meeting in person, or access the meeting via
videoconference, or telephone conference call.
Join the Zoom Meeting by clicking on the following link:
https://us02web.zoom.us/j/87189889684
Enter Meeting ID: 87189889684
To request to speak, click on “Participants” at the bottom of the screen, and click “Raise Hand.”
The meeting moderator will acknowledge your request and allow you to speak.
To join the meeting by phone, dial (346) 248-7799
Enter Meeting ID: 87189889684
To request to speak, enter *9, and *6 to mute/unmute yourself. The meeting moderator will
acknowledge your request and allow you to speak. When addressing the Council, please state
your name and address before beginning your comments. Please limit your comments to three
minutes.
If you encounter any problems joining or participating in the meeting, please call our help
line at 972-569-1191 for assistance.
Call to Order/ Roll Call.
Invocation, Pledge of Allegiance and Pledge to the Texas Flag.
Announcements of recent and upcoming events.
CONSENT AGENDA:
Zoning-related Public Hearing items on the Consent Agenda have received a unanimous
recommendation for approval by the Planning & Zoning Commission, and no written opposition
was received prior to the posting of this agenda. Those wishing to speak on a Public Hearing
item on the Consent Agenda should click on “Participants” at the bottom of the screen, and click
“Raise Hand.” The meeting moderator will acknowledge your request and allow you to speak.
1. Consider and act upon the minutes from the September 1, 2020, Town Council Joint
Meeting. (ML)
Agenda
Prosper Town Council Meeting
Council Chambers
Prosper Town Hall
250 W. First Street, Prosper, Texas
Tuesday, October 13, 2020
5:45 PM
Page 1
Page 2 of 4
2. Consider and act upon the minutes from the September 22, 2020, Town Council
Meeting. (ML)
3. Receive the August financial report. (BP)
4. Consider and act upon a resolution expressing official intent to reimburse costs of
Town capital improvement program projects that may be funded with proceeds of
bonds or other obligations, if those costs are paid prior to the issuance of such bonds
or obligations. (BP)
5. Consider and act upon authorizing the Town Manager to accept a grant award from
the Federal Emergency Management Agency (FEMA) through Texas Department of
Emergency Management (TDEM) (SB)
6. Consider and act upon authorizing the Town Manager to execute an Escrow
Agreement between the Prosper Independent School District and the Town of
Prosper, Texas, related to the future construction of improvements on Frontier
Parkway and Fishtrap Road. (HW)
7. Conduct a Public Hearing and consider and act upon an ordinance rezoning 1.4± acres
from Single Family-15 (SF-15) to Downtown Single Family (DTSF), located on the
south side of Third Street, east of Coleman Street. (Z20-0017). (AG)
8. Consider and act upon authorizing the Town Manager to execute an Interlocal
Agreement for Geographic Information System (GIS) services between the Town of
Prosper and the City of Frisco. (AG)
9. Consider and act upon a Site Plan, Landscape Plan, and Façade Plan for an auto
parts retail store (AutoZone), on 1.0± acre, located on the east side of Preston Road,
north of Prosper Trail. The property is zoned Planned Development-68 (PD-68).
(D20-0028). (AG)
10. Consider and act upon authorizing the Town Manager to execute a First Amended
Development Agreement between MQ Prosper Retail LLC and the Town of Prosper,
Texas, related to the Shops at Prosper Trail retail development. (AG)
11. Consider and act upon whether to direct staff to submit a written notice of appeal on
behalf of the Town Council to the Development Services Department, pursuant to
Chapter 4, Section 1.5(C)(7) and 1.6(B)(7) of the Town’s Zoning Ordinance, regarding
action taken by the Planning & Zoning Commission on any Site Plan or Preliminary
Site Plan. (AG)
CITIZEN COMMENTS
The public is invited to address the Council on any topic. However, the Council is unable to
discuss or take action on any topic not listed on this agenda. Please complete a “Public Meeting
Appearance Card” and present it to the Town Secretary prior to the meeting, or request to
address the Council via videoconference or telephone.
REGULAR AGENDA:
Pursuant to Section 551.007 of the Texas Government Code, individuals wishing to address the
Council for items listed as public hearings will be recognized when the public hearing is opened.
For individuals wishing to speak on a non-public hearing item, they may either address the
Council during the Citizen Comments portion of the meeting or when the item is considered by
the Town Council.
Page 2
Page 3 of 4
Items for Individual Consideration:
12. Consider and act upon awarding Bid No. 2021-03-B to Mario Sinacola & Sons
Excavating, Inc., related to construction services for the Cook Lane Phase I project;
and authorizing the Town Manager to execute a construction agreement for
same. (HW)
EXECUTIVE SESSION:
Recess into Closed Session in compliance with Section 551.001 et seq. Texas Government Code,
as authorized by the Texas Open Meetings Act, to deliberate regarding:
Section 551.087 – To discuss and consider economic development incentives.
Section 551.072 – To discuss and consider purchase, exchange, lease or value of real
property for municipal purposes and all matters incident and related thereto.
Section 551.074 – To discuss and consider personnel matters and all matters
incident and related thereto.
Section 551.071 – Consultation with the Town Attorney regarding legal issues
associated with Chapter 255 of the Texas Election Code and all matters incident and
related thereto.
Reconvene in Regular Session and take any action necessary as a result of the Closed
Session.
Possibly direct Town staff to schedule topic(s) for discussion at a future meeting.
Adjourn.
CERTIFICATION
I, the undersigned authority, do hereby certify that this Notice of Meeting was posted at Prosper
Town Hall, located at 250 W. First Street, Prosper, Texas 75078, a place convenient and readily
accessible to the general public at all times, and said Notice was posted by 5:00 p.m., on
Friday, October 9, 2020, and remained so posted at least 72 hours before said meeting was
convened.
_______________________________ _________________________
Melissa Lee, Town Secretary Date Notice Removed
Pursuant to Section 551.071 of the Texas Government Code, the Town Council reserves the right to consult
in closed session with its attorney and to receive legal advice regarding any item listed on this agenda.
Page 3
Page 4 of 4
NOTICE
Pursuant to Town of Prosper Ordinance No. 13-63, all speakers other than Town of Prosper staff are limited
to three (3) minutes per person, per item, which may be extended for an additional two (2) minutes with
approval of a majority vote of the Town Council.
NOTICE OF ASSISTANCE AT PUBLIC MEETINGS: The Prosper Town Council meetings are wheelchair
accessible. For special services or assistance, please contact the Town Secretary’s Office at (972) 569 -
1011 at least 48 hours prior to the meeting time.
Page 4
Page 1 of 4
]
Prosper is a place where everyone matters.
Call to Order/ Roll Call of the Town Council, Planning & Zoning Commission, and Parks &
Recreation Board.
The meeting was called to order at 6:00 p.m.
Council Members Present:
Mayor Ray Smith
Mayor Pro-Tem Curry Vogelsang, Jr.
Deputy Mayor Pro-Tem Jason Dixon
Councilmember Marcus E. Ray
Councilmember Craig Andres
Councilmember Jeff Hodges
Councilmember Meigs Miller
Planning and Zoning Commission Members Present:
Chairman Charles Cotten
Vice-Chairman Brandon Daniel
Secretary Chris Long
Amy Bartley
Chris Kern
Sara Peterson
Michael Pettis
Parks and Recreation Board Members Present:
Chair Rebekah Land
Vice Chair John Metcalf
Secretary Gina Kern
Ty Bledsoe
Matthew Cely
Cameron Reeves
Shannon Crawford
Staff Members Present:
Harlan Jefferson, Town Manager
Melissa Lee, Town Secretary
Robyn Battle, Executive Director of Community Services
Chuck Springer, Executive Director of Administrative Services
Rebecca Zook, Executive Director of Development & Infrastructure Services
John Webb, Development Services Director
Hulon Webb, Engineering Services Director
Minutes
Joint Work Session of the
Prosper Town Council,
Planning & Zoning Commission and
the Parks & Recreation Board
Council Chambers
Prosper Town Hall
250 W. First Street, Prosper, Texas
Tuesday, September 1, 2020
Page 5
Item 1.
Page 2 of 4
Dan Heischman, Assistant Director of Engineering Services – Development
Alex Glushko, Planning Manager
Scott Ingalls, Senior Planner
Evelyn Mendez, Planning Technician
Leigh Johnson, Director of Information Technology
Dudley Raymond, Director of Parks and Recreation
Paul Naughton, Senior Park Planner
Patty Kendzie, Marketing Coordinator Parks and Recreation
Discussion Item.
1. Receive a presentation and discuss a proposed Private Country Club and Single
Family development, located on the north side of First Street, between Coit Road
and Granite Shoal Drive. (AG/DR)
Alex Glushko, Planning Manager, began by providing an overview of the Private
Country Club and Single Family development. The project will be located on the north
side of First Street, between Coit Road and Granite Shoal Drive. The subject property
is currently zoned Planned Development-90 (PD-90) which allows for minimum lot
sizes of 75 feet in width. The proposed request includes approximately 319 lots, with
22% to be 40-ft.-wide alley-served lots. This is not a lot type that currently exists in
Prosper.
Dudley Raymond, Director of Parks and Recreation, discussed the Private Country
Club and Single Family development. The current Parks Master Plan recognizes a
portion of the subject property, located along the eastern side of Town Lake, as a
public park. The proposed request would result in a private recreational area
associated with the country club, as opposed to a Town park, and a realignment of the
proposed hike and bike trail network in the area.
The applicants, Craig and Adam James of James Land & Development, presented
information on the Private Country Club and Single Family development. Craig James
discussed the proposed development, Lakeside, a Private Social Club focused on
family, fitness, food and entertainment. Adam James provided an overview on
Lakeside, with amenities to include a fitness center, a resort style pool, multiple dining
options and child care. Additionally, the proposed development includes tennis and
basketball courts, golf simulators, and fishing. Club location, concept layout and
potential design elements were discussed.
The Parks and Recreation Board had questions on the uses of Town Lake by the
developer. The hike and bike trail and membership to the club was reviewed. The
Planning and Zoning Commission discussed the proposed 40-ft.-wide lots.
Council Member Ray commented on the allotment of the 40-ft.-wide lot sizes and
voiced disapproval for the rear-entry designed homes. Mr. James discussed current
real estate market conditions and what type of homes are in high demand. Council
Member Hodges had questions on parkland dedication and voiced disapproval for the
40-ft.-wide lots. Mr. James discussed the 40 ft. lot density mix required to support club
membership. Council Member Andres voiced disapproval for the 40 ft. lot size and
discussed protection for the residents if the club should fail for financial reasons.
Mayor Pro-Tem Vogelsang voiced concerns over the 40 ft. lot size and rear-entry
Page 6
Item 1.
Page 3 of 4
designed homes. Mayor Smith commented positively on the commitment of the
developer to include the club in phase one and commented positively on the builder
group. Deputy Mayor Pro-Tem Dixon discussed the importance of the details in the
development agreement and maintenance of the lake with split ownership. Council
Member Miller noted the importance of the development agreement speaking to the
quality of home being built.
Courtney Finley (via Zoom, no address provided), a Whitley Place resident, discussed
the fence line separating Whitley Place from the proposed development and what trees
in this area would be removed.
Dennis DeMattei (via Zoom, no address provided), a Whitley Place resident, stated
the importance of not alienating the adjacent neighbors who moved to this area for
large lot sizes.
Ken Seguin (via Zoom), Whitley Place HOA President, commented that no formal
presentation from James Land & Development was provided to them. Additionally, he
noted that any proposed development should be comparable with what is existing at
Whitley Place.
Greg Swartz (via Zoom, no address provided), a Whitley Place resident, discussed the
trees and natural beauty of the land and opposed destroying it.
Adjourn.
The meeting was adjourned at 8:06 p.m. on Tuesday, September 1, 2020.
These minutes approved by the Planning & Zoning Commission on the 6th day of October 2020.
APPROVED:
Chris Long, Secretary
These minutes approved by the Parks & Recreation Board on the 8th day of October 2020.
APPROVED:
Gina Kern, Secretary
These minutes approved by the Town Council on the 13th day of October 2020.
APPROVED:
Page 7
Item 1.
Page 4 of 4
Ray Smith, Mayor
ATTEST:
Melissa Lee, Town Secretary
Page 8
Item 1.
Page 1 of 7
]
Prosper is a place where everyone matters.
Call to Order/ Roll Call.
The meeting was called to order at 5:48 p.m.
Council Members Present:
Mayor Ray Smith
Mayor Pro-Tem Curry Vogelsang, Jr.
Deputy Mayor Pro-Tem Jason Dixon (arrived at 6:12 p.m. via Zoom)
Councilmember Marcus E. Ray
Councilmember Craig Andres
Councilmember Jeff Hodges
Councilmember Meigs Miller
Staff Members Present:
Harlan Jefferson, Town Manager
Terry Welch, Town Attorney
Melissa Lee, Town Secretary
Robyn Battle, Executive Director of Community Services
Chuck Springer, Executive Director of Administrative Services
Betty Pamplin, Finance Director
January Cook, Purchasing Manager
Rebecca Zook, Executive Director of Development & Infrastructure Services
John Webb, Development Services Director
Hulon Webb, Engineering Services Director
Dan Heischman, Assistant Director of Engineering Services - Development
Alex Glushko, Planning Manager
Frank Jaromin, Director of Public Works
Leigh Johnson, Director of Information Technology
Dudley Raymond, Director of Parks and Recreation
Doug Kowalski, Police Chief
Stuart Blasingame, Fire Chief
Invocation, Pledge of Allegiance and Pledge to the Texas Flag.
Pastor Phil Salee, Prestonwood Baptist Church, led the invocation. The Pledge of Allegiance and
the Pledge to the Texas Flag were recited.
Announcements of recent and upcoming events.
Councilmember Ray read the announcements.
The Town Council would like to thank the Dallas-based nonprofit group, the Southwest Jewish
Congress, for providing lunches to both Prosper Fire Stations. The meal deliveries were part of
Minutes
Prosper Town Council Meeting
Council Chambers
Prosper Town Hall
250 W. First Street, Prosper, Texas
Tuesday, September 22, 2020
Page 9
Item 2.
Page 2 of 7
their Feeding Heroes and Neighbors program, which provides meals to first responders and
others impacted by COVID-19.
Residents are invited to “Light Our Town Blue” in support of the Prosper Police Department. The
Town of Prosper, Prosper ISD, and local community groups are showing support for our Police
Department through the month of September, and ending on October 6 with the grand opening
of the new Prosper Police Station and the Town’s annual National Night Out celebration. Prosper
Town Hall, the Gateway Monument on Preston Road, and the PISD Football Stadium will be
illuminated in blue each night, and we encourage residents to do the same by adding blue light
bulbs to your front porch light and/or landscape lighting to show your support.
In October, the Town will continue to honor our public safety personnel by lighting Town Hall and
the Gateway Monument in red, in honor of Fire Prevention Month. Residents are encouraged to
add red light bulbs to their front porches and landscape lighting.
Thanks to everyone who attended the Prosper Fire Department’s annual 9/11 Remembrance
Ceremony at Town Hall, and those who donated blood in the annual blood drive. The community
donated 102 pints of blood, which exceeded our goal by 22 pints.
Collin County has launched the Collin CARES Small Business Grant Program for businesses
located within Collin County. Using CARES Act funds, the County will award up to $25,000 to
eligible businesses that have experienced a revenue loss due to the COVID-19 pandemic.
Applications may be submitted through September 25, and awards will be granted on a first-come,
first-served basis. More information is available on the Collin County website.
Presentations.
1. Presentation of a Proclamation to members of the Prosper Police and Fire
Departments declaring October 6, 2020, as National Night Out. (ML)
Mayor Smith presented the Proclamation to Prosper Police Chief Doug Kowalski
declaring October 6, 2020, as National Night Out.
2. Presentation of a Proclamation to members of Prosper Fire Rescue declaring
October 2020 as Fire Prevention Month. (RB)
Mayor Smith presented the Proclamation to Prosper Fire Chief Stuart Blasingame
declaring October 2020 as Fire Prevention Month.
CONSENT AGENDA:
Items placed on the Consent Agenda are considered routine in nature and non-
controversial. The Consent Agenda can be acted upon in one motion. Items may be
removed from the Consent Agenda by the request of Council Members or staff.
3. Consider and act upon the minutes from the September 8, 2020, Town Council
Meeting. (ML)
4. Consider and act upon authorizing the Town Manager to execute a Professional
Services Agreement between Garver, LLC, and the Town of Prosper, Texas,
related to the design of the Frontier Park/Lakes of Prosper Drainage Channel
project. (HW)
Page 10
Item 2.
Page 3 of 7
5. Consider and act upon whether to direct staff to submit a written notice of
appeal on behalf of the Town Council to the Development Services Department,
pursuant to Chapter 4, Section 1.5(C)(7) and 1.6(B)(7) of the Town’s Zoning
Ordinance, regarding action taken by the Planning & Zoning Commission on any
Site Plan or Preliminary Site Plan. (AG)
Councilmember Hodges made a motion and Councilmember Ray seconded the
motion to approve Items 3 thru 5 on the Consent Agenda.
The motion was approved by a vote of 6-0.
CITIZEN COMMENTS
There were no citizen comments.
REGULAR AGENDA:
Items for Individual Consideration:
6. Conduct a Public Hearing and consider and act upon a request to rezone 10.0±
acres from Downtown Commercial (DTC) to Planned Development-Multifamily
(PD-MF), located on the northeast corner of Fifth Street and the BNSF Railroad.
(Z20-0005). (AG)
Alex Glushko, Planning Manager, provided Council an overview of the request to
rezone 10.0± acres from Downtown Commercial (DTC) to Planned Development-
Multifamily (PD-MF). The applicant is proposing to construct 300 multifamily units
consisting of four multifamily buildings, with two buildings located at the northwest and
northeast corners of Fifth Street and the future extension of McKinley Street and two
buildings located on either side of the future extension of McKinley Street. The
buildings are four stories in height and are “urban-style” meaning they are built up to
the street right-of-way with surface parking located behind the buildings.
Councilmember Ray requested that the powerlines be buried and that there be
sufficient landscaping along the railroad. Council discussed railroad right-of-way and
easement dedication, and if the proposed allowable parking would be enough. Mayor
Pro-Tem Vogelsang had questions on the development agreement, requesting that
the development agreement and the PD be consistent with one another.
The applicant, Matt Moore with ClayMoore Engineering, discussed parking noting that
the developer has conducted research on this subject regarding previous projects.
Mr. Moore commented that the forthcoming development agreement speaks to
building materials durability. Additionally, Mr. Moore will meet with Oncor to discuss
different routing alternatives for electrical lines.
Mayor Smith Opened the Public Hearing.
With no one speaking, Mayor Smith closed the Public Hearing.
After discussion, Mayor Pro-Tem Vogelsang made a motion and Councilmember
Hodges seconded the motion to approve a request to rezone 10.0± acres from
Downtown Commercial (DTC) to Planned Development-Multifamily (PD-MF), located
on the northeast corner of Fifth Street and the BNSF Railroad, with the provision that
Page 11
Item 2.
Page 4 of 7
the standards in the development agreement should be in sync with the ordinance
provisions, providing for which controls in the event of a conflict.
The motion was approved by a vote of 7-0.
Mayor Smith opened Items 7 and 8 concurrently.
7. Conduct a Public Hearing and consider and act upon Ordinance No. 2020-74 for
a Specific Use Permit for a Wireless Communication and Support Structure at
the Town Public Works Facility, on 0.1± acres, located on the west side of the
BNSF Railroad, at the terminus of Fifth Street. (S19-0001). (AG)
Alex Glushko, Planning Manager, provided information on the request to allow for a
Wireless Communication & Support Structure at the Public Works facility. The
applicant, representing AT&T, is proposing to construct a 125-foot tall, gray galvanized
steel cell tower, within a 3,750 square-foot lease area, enclosed by a six-foot chain-
linked fence. Access will be provided from Fifth Street, on the west side of the BNSF
railroad. The cell tower will consist of six flush-mounted antenna arrays; three of which
will be utilized by AT&T, and the remaining three will be utilized by future carriers, yet
to be determined.
Mayor Smith Opened the Public Hearing.
With no one speaking, Mayor Smith closed the Public Hearing.
After discussion Councilmember Andres made a motion and Councilmember Miller
seconded the motion to approve Ordinance No. 2020-74 for a Specific Use Permit for
a Wireless Communication and Support Structure at the Town Public Works Facility,
on 0.1± acres, located on the west side of the BNSF Railroad, at the terminus of Fifth
Street. (S19-0001).
The motion was approved by a vote of 7-0.
8. Consider and act upon authorizing the Town Manager to execute a Tower Site
Lease Agreement by and between the Town of Prosper, Texas, and New Cingular
Wireless PCS, LLC, for the lease of Town property, generally located at 601 West
5th Street which is the Town’s Public Works site, for a cell tower. (CS)
Chuck Springer, Executive Director of Administrative Services, reviewed the Tower
Site Lease Agreement by and between the Town of Prosper, Texas, and New Cingular
Wireless PCS, LLC. New Cingular Wireless PCS, LLC approached Town staff to
discuss a cell tower at the Town’s Public Works site. The Town recommended that
they consider a multi-tenant cell tower to avoid multiple cell towers at this location.
New Cingular Wireless PCS, LLC (the “Tenant”) is proposing to lease an
approximately 3,750 (75’ by 50’) square-foot portion of the property and they will be
responsible for building and maintaining the cell tower. This agreement has a six-
month option period for one-time payment of $2,000. The option period will allow the
Tenant to perform geological and engineering tests at the site and apply for all required
permits. The Tenant has up to six months to exercise the option, at which point the
five-year term of the agreement begins. The lease agreement is at a monthly rate of
$2,000 for an initial five-year term with optional renewals of five additional five-year
terms. The rental rate of $2,000 increases annually at a rate of 2.5%. If the tenant
Page 12
Item 2.
Page 5 of 7
does not exercise the option to lease the property, the Town will retain the $2,000
option payment and the lease will be cancelled.
Council discussed the inflationary increase of 2.5% regarding the lease agreement
and the initial five-year term with optional renewals of five additional five-year terms.
After discussion Councilmember Miller made a motion and Councilmember Hodges
seconded the motion to approve the Tower Site Lease Agreement by and between the
Town of Prosper, Texas, and New Cingular Wireless PCS, LLC, for the lease of Town
property, generally located at 601 West 5th Street which is the Town’s Public Works
site, for a cell tower.
The motion was approved by a vote of 7-0.
9. Update on Christmas Festival. (DR)
Dudley Raymond, Director of Parks and Recreation, updated Council on the annual
Prosper Christmas Festival. Based on the State of Texas Governors’ guidelines, staff
feels that the annual Prosper Christmas Festival can occur, yet in a modified form.
Director Raymond reviewed typical elements offered in the past and the proposal for
this year’s offerings. In all cases, social distancing, mask and hand sanitizing will be
strongly encouraged as well as staff/volunteers sanitizing commonly touched items.
Council discussed the possibility of hiring a photographer, utilizing the balconies of
Town Hall to allow for social distancing and increasing the sound for the stage. Council
agreed to revisit this topic in late October 2020.
EXECUTIVE SESSION:
Recess into Closed Session in compliance with Section 551.001 et seq. Texas Government
Code, as authorized by the Texas Open Meetings Act, to deliberate regarding:
Section 551.087 – To discuss and consider economic development incentives.
Section 551.072 – To discuss and consider purchase, exchange, lease or value
of real property for municipal purposes and all matters incident and related
thereto.
Section 551-074 - To discuss and consider personnel matters and all matters
incident and related thereto.
Section 551.071 – Consultation with Town Attorney regarding legal issues
associated with Fifth Circuit opinion in Reagan National Advertising v. City of
Austin, and all matters incident and related thereto
The Town Council recessed into Executive Session at 6:49 p.m.
Reconvene in Regular Session and take any action necessary as a result of the Closed
Session.
The Town Council reconvened the Regular Session at 8:46 p.m.
Councilmember Miller made a motion and Councilmember Hodges seconded the motion to
approve Resolution No. 2020-75 terminating the 2012 Development and Financing agreement
Page 13
Item 2.
Page 6 of 7
between the Town of Prosper, Texas, and MSW Prosper 380 L.P., as amended by the 2018
Amendment to the Development and Financing agreement, effective September 11, 2020.
The motion was approved by a vote of 7-0.
Possibly direct Town staff to schedule topic(s) for discussion at a future meeting
10. Discussion on possible elements of Overlay Districts for properties adjacent to
the Dallas North Tollway and US 380. (JW)
John Webb, Development Services Director, provided highlights on proposed Overlay
Districts for properties adjacent to the Dallas North Tollway and US 380. The overlay
districts are typically found in two formats; they provide uniform standards along the
entire corridor, or some may establish gateways or subdistricts of various standards.
Possible additional standards include building orientation, location of parking and the
design of parking structures, landscaping and street furnishings.
Mayor Smith commented on the importance of having a variety of uses in all four
corners and requested to review existing PDs within this area at a future meeting.
Mayor Pro-Tem Vogelsang noted the importance of strategically planning this area
and that the overlay districts would allow for more development control. Mayor Pro-
Tem Vogelsang requested staff to inform Council of what hurdles would be involved
in the implementation of overly districts.
11. Competitive Sealed Proposal Legislation and Legislative Agenda. (RB)
Robyn Battle, Executive Director of Community Services, briefed Council on the
Competitive Sealed Proposal Legislation and Legislative Agenda. The competitive
sealed proposal (CSP) method of bidding is an alternative to traditional competitive
bidding. CSP is beneficial for municipalities in terms of time, cost, and quality. The
advantage to CSP is the ability to negotiate terms to obtain the best value for the Town,
rather than simply go with the lowest bid. The second advantage is that if negotiations
with the top-ranked bidder fail, the Town can continue negotiations with the second-
ranked bidder, rather than rejecting all bids and rebidding the project. The Local
Government Code currently places a $1.5 million cap on “horizontal” projects for
municipal governments. Staff is proposing to draft legislation and identify a potential
sponsor for the bill to repeal the Local Government Code provision.
Council discussed the Towns previous use of CSP and the costs related to repealing
the provision. Council was in favor of staff drafting legislation and identifying a
potential sponsor for the bill.
Mrs. Battle then discussed with Council developing an overall legislative agenda for
the Town. This was identified by Council as a major initiative in the 2020 Annual
Strategic Planning Session. Council identified building materials legislation as one of
their top priorities. Staff will develop a draft legislative agenda and present to Council
this fall.
Page 14
Item 2.
Page 7 of 7
12. Strategic Planning Discussion. (RB)
Mrs. Battle provided Council future quarterly meeting dates, with the Annual Strategic
Planning Session occurring on February 13, 2021. Mrs. Battle requested feedback on
meeting topics, format, facilitation and outcomes.
Council provided feedback on the Strategic Planning Session including narrowing the
scope of the meeting and not using a facilitator. Mrs. Battle will follow up with Council
for additional feedback.
Councilmember Andres requested a future meeting topic on a lighting ordinance.
Councilmember Ray requested a future meeting topic regarding neighborhood
drainage.
Adjourn.
The meeting was adjourned at 9:25 p.m. on Tuesday, September 22, 2020.
These minutes approved on the 13th day of October 2020.
APPROVED:
Ray Smith, Mayor
ATTEST:
Melissa Lee, Town Secretary
Page 15
Item 2.
Prosper is a place where everyone matters.
MONTHLY FINANCIAL REPORT
as of August 31, 2020
Budgetary Basis
Prepared by
Finance Department
October 13, 2020
Page 16
Item 3.
TOWN OF PROSPER, TEXAS
MONTHLY FINANCIAL REPORT
AUGUST 2020
Table of Contents
Dashboard Charts 1 ‐ 2
General Fund 3
Water‐Sewer Fund 4 ‐ 5
Debt Service Fund 6
Crime Control and Prevention Special Purpose District 7
Fire Control, Prevention, and Emergency Medical Services Special Purpose District 8
Vehicle and Equipment Replacement Fund 9
Storm Drainage Utility Fund 10
Park Dedication and Improvement Fund 11
TIRZ #1 ‐ Blue Star 12
TIRZ #2 ‐ Matthews Southwest 13
Water Impact Fees Fund 14
Wastewater Impact Fees Fund 15
Thoroughfare Impact Fees Fund 16
Special Revenue Fund 17
Capital Projects Fund‐General 18
Capital Projects Fund‐Water/Sewer 19
Detail All Funds 20
Page 17
Item 3.
$‐ $500,000 $1,000,000 $1,500,000 $2,000,000 $2,500,000 $3,000,000 $3,500,000 $4,000,000
Total Budget
YTD Budget
YTD Actual
Building Permit Revenues
0
200,000
400,000
600,000
800,000
1,000,000
1,200,000
Oct Nov Dec Jan Feb Mar Apr May June July Aug Sept
Town of Prosper, Texas
Sales Tax Revenue by Month
FY 14/15 FY15/16 FY 16/17
FY 17/18 FY 18/19 FY 19/20
1 Page 18
Item 3.
$31.475
$28.852
$26.056
$30.732
$28.171
$31.146
$‐ $5 $10 $15 $20 $25 $30 $35
Total Budget
YTD Budget
YTD Actual
In Millions
General Fund Revenues and Expenditures
Revenues Expenditures
$26.080
$23.907
$22.489
$26.046
$23.876
$21.378
$‐ $5 $10 $15 $20 $25 $30
Total Budget
YTD Budget
YTD Actual
In Millions
Water‐Sewer Fund Revenues and Expenditures
Revenues Expenditures
2 Page 19
Item 3.
TOWN OF PROSPER, TEXASMONTHLY FINANCIAL REPORTAugust 31, 2020Expected Year to Date Percent 91.66%GENERAL FUNDOriginal Budget Amended Current Year Current Year Current RemainingPrior Year Change fromBudget Adjustment Budget YTD Actuals Encumbrances Budget Balance YTD Percent Note YTD Actuals Prior YearREVENUESProperty Taxes 16,570,933$ ‐$ 16,570,933$ 16,994,627$ ‐$ (423,694)$ 103%1 14,549,771$ 17%Sales Taxes 5,011,936 ‐ 5,011,936 5,397,262 ‐ (385,326) 108%4,823,540 12%Franchise Fees 1,731,375 ‐ 1,731,375 1,261,461 ‐ 469,914 73%2 1,156,490 9%Building Permits 3,215,472 ‐ 3,215,472 3,439,031 ‐ (223,559) 107%2,995,216 15%Other Licenses, Fees & Permits 1,089,881 ‐ 1,089,881 1,497,871 ‐ (407,990) 137%1,168,003 28%Charges for Services 428,997 ‐ 428,997 420,272 ‐ 8,725 98%373,669 12%Fines & Warrants 474,163 ‐ 474,163 282,186 ‐ 191,977 60%6 450,591 ‐37%Intergovernmental Revenue (Grants) 54,000 404,672 458,672 370,436 ‐ 88,236 81%5 101,673 264%Investment Income 300,249 ‐ 300,249 252,176 ‐ 48,073 84%306,471 ‐18%Transfers In 989,087 ‐ 989,087 906,663 ‐ 82,424 92%808,079 12%Miscellaneous 201,447 15,000 216,447 208,655 ‐ 7,792 96%262,359 ‐20%Park Fees 245,280 ‐ 245,280 115,504 ‐ 129,776 47%7 216,997 ‐47% Total Revenues 30,312,820$ 419,672$ 30,732,492$ 31,146,143$ ‐$ (413,651)$ 101%27,212,859$ 14%EXPENDITURESAdministration 5,442,762$ (303,473)$ 5,139,289$ 4,661,483$ 162,017$ 315,789$ 94%3 7,021,643$ ‐34%Police 5,496,662 134,545 5,631,207 4,489,889 49,847 1,091,471 81%3,821,964 17%Fire/EMS 6,384,111 1,292,878 7,676,989 6,645,782 241,211 789,996 90%7,318,726 ‐9%Public Works 2,963,896 249,840 3,213,736 2,850,511 133,636 229,588 93%4 3,635,987 ‐22%Community Services 4,631,138 105,060 4,736,198 3,686,738 81,634 967,827 80%3,603,346 2%Development Services 3,211,836 26,403 3,238,239 2,345,757 522,412 370,069 89%2,480,017 ‐5%Engineering 1,734,793 104,576 1,839,369 1,375,874 67,894 395,602 78%1,079,980 27% Total Expenses 29,865,198$ 1,609,829$ 31,475,027$ 26,056,034$ 1,258,651$ 4,160,342$ 87%28,961,663$ ‐10%REVENUE OVER (UNDER) EXPENDITURES 447,622$ (1,190,157)$ (742,535)$ 5,090,109$ (1,748,804)$ Beginning Fund Balance October 1‐Unassigned/Unrestricted 9,881,492 9,881,492 8,139,265 Ending Fund Balance 9,138,957$ 14,971,601$ 6,390,461$ Notes12 Franchise fees and other various license and fees are paid quarterly or annually. 3 Departments encumber funds for contracts that usually reflect the entire budget which is why we see budgets exceed the expected 11/12 to date.For example: Town Manager professional services; and various IT projects.4 The adopted budget included $1.25M for Prosper Trail (Coit to Custer). These funds have been transferred to the CIP fund. 5 Grant revenues are recorded when received. The largest grant revenue expected is for the fire SAFER grant. The first reimbursement was received in July.6 Court Fine collections have been impacted by COVID‐19. Municipal Court was shut down for the months of April and May. Virtual Court was implemented in July to assist with case resolution and collections.7 Park fee collections have been impacted by COVID‐19. Park programs for Spring were cancelled. Some of this revenue has an offsetting expense which is down in relation.Property taxes are billed in October and the majority of collections occur December through February. 3Page 20Item 3.
Original Budget Amended Current Year Current Year Current RemainingPrior Year Change fromBudget Adjustment Budget YTD Actual Encumbrances Budget Balance YTD Percent Note YTD Actual Prior YearREVENUESWater Charges for Services 13,623,413$ ‐$ 13,623,413$ 12,533,469$ ‐$ 1,089,944$ 92%9,513,122$ 32%Sewer Charges for Services 7,051,798 ‐ 7,051,798 6,674,822 ‐ 376,976 95%6,079,856 10%Sanitation Charges for Services 1,377,830 ‐ 1,377,830 1,279,730 ‐ 98,100 93%1,176,241 9%Licenses, Fees & Permits 54,258 ‐ 54,258 173,877 ‐ (119,619) 320%3 153,243 13%Water Penalties 1,675 ‐ 1,675 1,825 ‐ (150) 109%1,475 24%Utility Billing Penalties 112,200 ‐ 112,200 50,182 ‐ 62,018 45%4 122,941 ‐59%Investment Income 142,024 ‐ 142,024 126,739 ‐ 15,285 89%159,372 ‐20%Other 2,590,428 1,092,482 3,682,910 537,081 ‐ 3,145,829 15%5 338,340 59% Total Revenues 24,953,626$ 1,092,482$ 26,046,108$ 21,377,725$ ‐$ 4,668,383$ 82%17,544,590$ 22%EXPENDITURESAdministration 2,396,949$ (16,575)$ 2,380,374$ 2,077,465$ 82,194$ 220,716$ 91%2,376,297$ ‐13%Debt Service 3,930,237 ‐ 3,930,237 3,930,989 ‐ (752) 100%1 3,193,126 23%Water Purchases 5,690,642 (100,000) 5,590,642 4,338,538 ‐ 1,252,104$ 78%4,662,502 ‐7%Public Works 12,938,373 1,240,353 14,178,726 12,141,922 694,804 1,342,000 91%2 7,991,825 52% Total Expenses 24,956,201$ 1,123,778$ 26,079,979$ 22,488,914$ 776,998$ 2,814,068$ 89%18,223,750$ 23%REVENUE OVER (UNDER) EXPENDITURES (2,575)$ (31,296)$ (33,871)$ (1,111,189)$ (679,159)$ Beginning Working Capital October 1 8,069,636 8,069,636 7,869,816 Ending Working Capital 8,035,765$ 6,958,447$ 7,190,657$ Notes12 The adopted budget included $3.051M for CIP projects. These funds have been transferred to the CIP fund. $2.501M Custer Road Meter Station and Water Line Relocations$400k Cook Lane (First‐End) Water Line$150k Broadway (Parvin‐Craig) Water Line3Included in this category are revenues for credit card fees being collected. These were not budgeted as we were expecting to migrate to a customer direct pay model. There is an offsetting expense for this revenue.4Customer penalties are currently being waived due to COVID‐19.5Budgeted in this category is a reimbursement from TxDOT for the Custer Road Meter Station and Water Line Relocations. TOWN OF PROSPER, TEXASMONTHLY FINANCIAL REPORTAugust 31, 2020Expected Year to Date Percent 91.66%WATER‐SEWER FUNDThe Town has encumbered the annual debt service payments that are paid in February and August.4Page 21Item 3.
TOWN OF PROSPER, TEXASMONTHLY FINANCIAL REPORTAugust 31, 2020Expected Year to Date Percent 91.66%WATER‐SEWER FUNDAug‐20 Aug‐19Growth % Average MonthlyAverage CumulativeWATER SEWER WATER SEWER Change# of Accts Residential9,453 8,758 8,378 7,697 13.29% October 9.5% 9.5%# of Accts Commercial361 322 355 264 10.34% November 6.5% 16.0%Consumption‐Residential200,177,01053,371,994189,928,80052,924,4314.40% December 5.4% 21.3%Consumption‐Commercial18,448,7008,328,40021,147,4706,551,950‐3.33% January 4.6% 25.9%Average Residential Water Consumption 21,17622,670‐6.59% February 4.5% 30.4%Billed ($) Residential1,361,811.76 507,974.69 1,303,436.89 480,262.65 March 4.4% 34.9%Billed ($) Commercial167,077.90 59,615.54 182,655.95 47,393.94 April 6.2% 41.1% Total Billed ($) $1,528,889.66567,590.23$ 1,486,092.84$ 527,656.59$ 4.11% May 7.6% 48.6%June 10.5% 59.1%July 12.1% 71.2%August 15.7% 87.0%September 13.0% 100.0%Sep‐19Trace of rainSep‐18 12.69Oct‐19 4.42 Oct‐18 15.66Nov‐19 1.80 Nov‐18 0.86Dec‐19 1.17 Dec‐18 4.55Jan‐20 5.00 Jan‐19 1.58Feb‐20 3.88 Feb‐19 1.29Mar‐20 6.75 Mar‐19 2.01Apr‐20 1.90 Apr‐19 6.75May‐20 7.54 May‐19 8.15Jun‐20 5.35 Jun‐19 4.13Jul‐20 2.31 Jul‐19 0.78Aug‐20 1.28 Aug‐19 2.44 Average rainfall for August is 1.91Rainfall5Page 22Item 3.
TOWN OF PROSPER, TEXASMONTHLY FINANCIAL REPORTAugust 31, 2020Expected Year to Date Percent 91.66%DEBT SERVICE FUNDOriginal Budget Amended Current Year Current Year Current RemainingPrior YearChange fromBudget Adjustment Budget YTD Actual Encumbrances Budget Balance YTD Percent Note YTD ActualPrior YearREVENUESProperty Taxes‐Delinquent185,713$ ‐$ 185,713$ 170,751$ ‐$ 14,962$ 92%1 78,174$ 118%Property Taxes‐Current 6,625,000 ‐ 6,625,000 6,830,792 ‐ (205,792) 103%1 5,936,569 15%Taxes‐Penalties45,000 ‐ 45,000 51,376 ‐ (6,376) 114%1 33,376 54%Interest Income 45,000 ‐ 45,000 85,002 ‐ (40,002) 189%87,661 ‐3%Total Revenues 6,900,713$ ‐$ 6,900,713$ 7,137,920$ ‐$ (237,207)$ 103%6,135,781$ 16%EXPENDITURESProfessional Services‐$ ‐$ ‐$ 2,500$ ‐$ (2,500)$ 3,571$ ‐30%2008 CO Bond Payment ‐ ‐ ‐ ‐ ‐ ‐ ‐ 2010 Tax Note Payment ‐ ‐ ‐ ‐ ‐ ‐ ‐ 2011 Refunding Bond Payment ‐ ‐ ‐ ‐ ‐ ‐ ‐ 2012 GO Bond Payment 190,000 ‐ 190,000 190,000 ‐ ‐ 100%2 185,000 3%2012 CO Bond Payment ‐ ‐ ‐ ‐ ‐ ‐ 58,650 2013 GO Refunding Bond 165,000 ‐ 165,000 165,000 ‐ ‐ 100%2 160,000 Bond Administrative Fees 20,000 ‐ 20,000 1,930 ‐ 18,070 10%13,752 2014 GO Bond Payment 280,000 ‐ 280,000 280,000 ‐ ‐ 100%2 265,000 2015 GO Bond Payment 500,100 ‐ 500,100 500,100 ‐ ‐ 100%2 175,000 186%2015 CO Bond Payment 215,000 ‐ 215,000 215,000 ‐ ‐ 100%2 60,000 258%2016 GO Debt Payment 616,500 ‐ 616,500 616,500 ‐ ‐ 100%2 946,800 ‐35%2016 CO Debt Payment 45,000 ‐ 45,000 45,000 ‐ ‐ 100%2 90,000 ‐50%2017 CO Debt Payment ‐ ‐ ‐ ‐ ‐ ‐ 355,000 2017 GO Debt Payment 405,000 ‐ 405,000 405,000 ‐ ‐ 100%2 35,000 1057%2018 GO Debt Payment 135,000 ‐ 135,000 135,000 ‐ ‐ 100%2 115,000 17%2018 CO Debt Payment 160,000 ‐ 160,000 160,000 ‐ ‐ 100%2 895,000 ‐82%2019 CO Debt Payment 967,754 ‐ 967,754 967,753 1 ‐ 100%2‐ 2019 GO Debt Payment 140,000 ‐ 140,000 140,000 ‐ ‐ 100%2‐ Bond Interest Expense 3,183,386 ‐ 3,183,386 3,183,385 1 0 100%2 2,839,989 12%Total Expenditures 7,022,740$ ‐$ 7,022,740$ 7,007,168$ 2$ 15,570$ 100%6,197,762$ 13%REVENUE OVER (UNDER) EXPENDITURES (122,027)$ ‐$ (122,027)$ 130,752$ (61,981)$ Beginning Fund Balance October 1 2,556,812 2,556,812 2,558,230 Ending Fund Balance Current Month 2,434,785$ 2,687,564$ 2,496,249$ Notes12Property taxes are billed in October and the majority of collections occur December through February.The Town has encumbered the annual debt service payments that are paid in February and August.6Page 23Item 3.
TOWN OF PROSPER, TEXASMONTHLY FINANCIAL REPORTAugust 31, 2020Expected Year to Date Percent 91.66%CRIME CONTROL AND PREVENTION SPECIAL PURPOSE DISTRICTOriginal Budget Amended Current YearCurrent YearCurrent Remaining Prior YearChange fromBudget Adjustment Budget YTD Actual Encumbrances Budget Balance YTD PercentNote YTD Actual Prior YearREVENUESSales Tax ‐ Town 1,338,204$ ‐$ 1,338,204$ 1,413,887$ ‐$ (75,683)$ 106%2 944,043$ 50%Interest Income 5,000 ‐ 5,000 1,249 ‐ 3,751 25%1‐ Other‐ ‐ ‐ ‐ ‐ ‐ ‐ Total Revenue 1,343,204$ ‐$ 1,343,204$ 1,415,136$ ‐$ (71,932)$ 105%944,043$ 50%EXPENDITURESPersonnel 1,308,204$ 18,951$ 1,327,155$ 1,116,474$ ‐$ 210,681$ 84%1,092,742$ 2%Other‐ ‐ ‐ 545 ‐ (545) 52,736 ‐99%Total Expenditures 1,308,204$ 18,951$ 1,327,155$ 1,117,019$ ‐$ 210,136$ 84%1,145,478$ ‐2%REVENUE OVER (UNDER) EXPENDITURES 35,000$ (18,951)$ 16,049$ 298,118$ (201,435)$ Beginning Fund Balance October 1 170,443 170,443 ‐ Ending Fund Balance Current Month 186,492$ 468,561$ (201,435)$ Notes1 Due to a negative cash position interest had not been allocated prior to December2 The first month of sales tax collection in the prior year was December. 7Page 24Item 3.
TOWN OF PROSPER, TEXASMONTHLY FINANCIAL REPORTAugust 31, 2020Expected Year to Date Percent 91.66%FIRE CONTROL, PREVENTION, AND EMERGENCY MEDICAL SERVICES SEPCIAL PURPOSE DISTRICTOriginal Budget Amended Current YearCurrent YearCurrent RemainingPrior Year Change fromBudget Adjustment Budget YTD Actual Encumbrances Budget Balance YTD Percent Note YTD Actual Prior YearREVENUESSales Tax ‐ Town 1,338,204$ ‐$ 1,338,204$ 1,411,908$ ‐$ (73,704)$ 106%2 943,680$ 50%Interest Income 5,000 ‐ 5,000 ‐ ‐ 5,000 0%1‐ Other‐ ‐ ‐ ‐ ‐ ‐ ‐ Total Revenue 1,343,204$ ‐$ 1,343,204$ 1,411,908$ ‐$ (68,704)$ 105%943,680$ 50%EXPENDITURESPersonnel 1,308,204$ ‐$ 1,326,274$ 1,283,675$ ‐$ 42,599$ 97%1,235,523$ 4%Other‐ ‐ ‐ 545 ‐ (545) 49,700 ‐99%Total Expenditures1,308,204$ ‐$ 1,326,274$ 1,284,220$ ‐$ 42,054$ 97%1,285,224$ 0%REVENUE OVER (UNDER) EXPENDITURES 35,000$ ‐$ 16,930$ 127,688$ (341,544)$ Beginning Fund Balance October 115,585 15,585 ‐ Ending Fund Balance Current Month32,515$ 143,273$ (341,544)$ Notes1 Due to a negative cash position no interest has been allocated to date.2 The first month of sales tax collection in the prior year was December. 8Page 25Item 3.
TOWN OF PROSPER, TEXASMONTHLY FINANCIAL REPORTAugust 31, 2020Expected Year to Date Percent 91.66%VEHICLE AND EQUIPMENT REPLACEMENT FUNDOriginal Budget Amended Current YearCurrent YearCurrent Remaining Prior YearChange fromBudget Adjustment Budget YTD Actual Encumbrances Budget Balance YTD PercentNote YTD Actual Prior YearREVENUESGrant Revenue 182,788$ ‐$ 182,788$ ‐$ ‐$ 182,788$ 0%3‐$ Other Reimbursements 124,600 ‐ 124,600 75,429 ‐ 49,171 61%1 121,920 ‐38%Interest Income 30,000 ‐ 30,000 56,272 ‐ (26,272) 188%57,069 ‐1%Transfers In 1,913,713 108,969 2,022,682 1,854,125 ‐ 168,557 92%1,492,874 24%Total Revenue 2,251,101$ 108,969$ 2,360,070$ 1,985,826$ ‐$ 374,244$ 84%1,671,863$ 19%EXPENDITURESVehicle Replacement787,517$ 524,275$ 1,311,792$ 1,081,541$ 53,078$ 177,172$ 86%929,852$ 16%Equipment Replacement 26,000 ‐ 26,000 25,948 7,309 (7,257) 128%2 292,910 ‐91%Technology Replacement 82,650 ‐ 82,650 80,362 4,427 (2,139) 103%2 64,726 24%Total Expenditures 896,167$ 524,275$ 1,420,442$ 1,187,852$ 64,814$ 167,776$ 88%1,287,488$ ‐8%REVENUE OVER (UNDER) EXPENDITURES 1,354,934$ (415,306)$ 939,628$ 797,974$ 384,375$ Beginning Fund Balance October 1 2,895,043 2,895,043 2,337,780 Ending Fund Balance Current Month 3,834,671$ 3,693,017$ 2,722,155$ Notes1 Auction revenues and insurance reimbursements are placed in the Other Reimbursements account as they occur. Several vehicles have not been auctioned due to the need for social distancing.23Funds have been expended or encumbered for this year's replacement vehicles, equipment, and technology.Grant revenue is for the Clean Fleet grant. Destruction of the old engine is scheduled to take place in September with reimbursement to follow.9Page 26Item 3.
TOWN OF PROSPER, TEXASMONTHLY FINANCIAL REPORTAugust 31, 2020Expected Year to Date Percent 91.66%STORM DRAINAGE UTILITY FUNDOriginal Budget Amended Current Year Current Year Current RemainingPrior Year Change fromBudget Adjustment Budget YTD Actual Encumbrances Budget Balance YTD Percent Note YTD Actual Prior YearREVENUES 45‐4Storm Drainage Utility Fee 627,156$ ‐$ 627,156$ 611,181$ ‐$ 15,975$ 97%557,867$ 10%Drainage Review Fee 6,000 ‐ 6,000 1,710 ‐ 4,290 29%2‐ 45‐4Interest Income 5,000 ‐ 5,000 7,906 ‐ (2,906) 158%4,413 79%Other Revenue ‐ ‐ ‐ ‐ ‐ ‐ ‐ Total Revenue 638,156$ ‐$ 638,156$ 620,797$ ‐$ 17,359$ 97%562,280$ 10%EXPENDITURESPersonnel Services 166,833$ 721$ 167,554$ 156,506$ ‐$ 11,048$ 93%150,610$ 4%Debt Service 248,641 ‐ 248,641 248,641 1 ‐ 100%1‐ 45‐7Operating Expenditures 126,700 ‐ 126,700 12,902 ‐ 113,798 10%3 7,857 64%Transfers Out 100,135 ‐ 100,135 91,790 ‐ 8,345 92%614,944 ‐85% Total Expenses 642,309$ 721$ 643,030$ 509,840$ 1$ 133,190$ 79%773,411$ ‐34%REVENUE OVER (UNDER) EXPENDITURES(4,153)$ (721)$ (4,874)$ 110,957$ (211,131)$ Beginning Working Capital October 1 477,466 477,466 151,834 Ending Working Capital Current Month 472,592$ 588,423$ (59,297)$ Notes12 Drainage Review fee is collected at time service is requested, and has a matching expense. 3 Operating Expenditures include a capital project that is expected to be awarded in summer 2020.The Town has encumbered the annual debt service payments that are paid in February and August.10Page 27Item 3.
TOWN OF PROSPER, TEXASMONTHLY FINANCIAL REPORTAugust 31, 2020Expected Year to Date Percent 91.66%PARK DEDICATION AND IMPROVEMENT FUNDSOriginal Budget Amended Current YearCurrent YearCurrent RemainingPrior Year Change fromBudget Adjustment Budget YTD Actual Encumbrances Budget Balance YTD Percent Note YTD Actual Prior YearREVENUES 60‐4Park Dedication‐Fees 200,000$ ‐$ 200,000$ ‐$ ‐$ 200,000$ 0%375,146$ 60‐4Park Improvements 100,000 ‐ 100,000 ‐ ‐ 100,000 0%113,784 Contributions/Grants500,000 ‐ 500,000 ‐ ‐ 500,000 0%‐ 60‐4Interest‐Park Dedication 25,000 ‐ 25,000 25,813 ‐ (813) 103%21,100 22% 60‐4Interest‐Park Improvements 15,000 ‐ 15,000 22,335 ‐ (7,335) 149%24,059 ‐7% Total Revenue 840,000$ ‐$ 840,000$ 48,148$ ‐$ 791,852$ 6%534,089$ ‐91%EXPENDITURESDeveloper Reimbursement‐Park Imp 15,955$ ‐$ 15,955$ ‐$ ‐$ 15,955$ 35,000$ Hike & Bike Master Plan ‐ 56,188 56,188 53,593 2,594 ‐ 100%1‐ 60‐6Cockrell Park Trail Connection 500,000 35,200 535,200 20,665 503,736 10,799 98%15,338 35%Hays Park 35,000 18,500 53,500 3,761 28,074 21,666 60%1 6,000 ‐37%Pecan Grove H&B Trail 30,000 ‐ 30,000 ‐ ‐ 30,000 0%‐ Pecan Grove 85,000 ‐ 85,000 ‐ ‐ 85,000 0%‐ Transfers Out ‐ ‐ ‐ ‐ ‐ ‐ ‐ Total Expenses 665,955$ 109,888$ 775,843$ 78,019$ 534,404$ 163,420$ 79%56,338$ 38%REVENUE OVER (UNDER) EXPENDITURES 174,045$ (109,888)$ 64,158$ (29,870)$ 477,752$ Beginning Fund Balance October 12,782,069 2,782,069 1,857,785 Ending Fund Balance Current Month2,846,227$ 2,752,199$ 2,335,537$ Notes1 Project funds have been encumbered. 11Page 28Item 3.
TOWN OF PROSPER, TEXASMONTHLY FINANCIAL REPORTAugust 31, 2020Expected Year to Date Percent 91.66%TIRZ #1 ‐ BLUE STAROriginal Budget Amended Current Year Current Remaining Prior Year Change fromBudget Adjustment Budget YTD Actual Budget Balance YTD PercentNoteYTD Actual Prior YearREVENUESImpact Fee Revenue:Water Impact Fees 100,000$ ‐$ 100,000$ 294,810$ (194,810)$ 295%119,868$ 1384%Wastewater Impact Fees50,000 ‐ 50,000 189,442 (139,442) 379%111,852 1498%East Thoroughfare Impact Fees 200,000 ‐ 200,000 1,100,053 (900,053) 550%192,173 1093%Property Taxes ‐ Town (Current) 387,624 ‐ 387,624 386,349 1,275 100%340,626 13%Property Taxes ‐ Town (Rollback) ‐ ‐ ‐ 28,840 (28,840) ‐ Property Taxes ‐ County (Current) 110,960 ‐ 110,960 92,846 18,114 84%73,604 26%Sales Taxes ‐ Town 495,372 ‐ 495,372 468,864 26,508 95%422,629 11%Sales Taxes ‐ EDC415,259 ‐ 415,259 392,673 22,586 95%353,952 11%Investment Income 7,500 ‐ 7,500 20,356 (12,856) 271%9,781 108%Transfer In ‐ ‐ ‐ ‐ ‐ 1,449 ‐100% Total Revenue 1,766,715$ ‐$ 1,766,715$ 2,974,234$ (1,207,519)$ 168%1,325,933$ 124%EXPENDITURESProfessional Services ‐$ ‐$ ‐$ ‐$ ‐$ ‐ Developer Rebate 1,766,715 ‐ 1,766,715 2,840,581 (1,073,866) 161%21,178,927 Transfers Out ‐ ‐ ‐ ‐ ‐ Total Expenses 1,766,715$ ‐$ 1,766,715$ 2,840,581$ (1,073,866)$ 161%1,178,927$ REVENUE OVER (UNDER) EXPENDITURES ‐$ 133,653$ 147,006$ Beginning Fund Balance October 1 256,828 256,828 213,282 Ending Fund Balance Current Month 256,828$ 390,481$ 360,288$ Notes1 Impact fees for Gates of Prosper Phase 2 shell buildings.2 Rebate is based on revenue collected in current year.12Page 29Item 3.
TOWN OF PROSPER, TEXASMONTHLY FINANCIAL REPORTAugust 31, 2020Expected Year to Date Percent 91.66%TIRZ #2 ‐ MATTHEWS SOUTHWESTOriginal Budget Amended Current Year Current Remaining Prior Year Change fromBudget Adjustment Budget YTD Actual Budget Balance YTD Percent Note YTD Actual Prior YearREVENUESImpact Fee Revenue:West Thoroughfare Impact Fees 325,500$ ‐$ 325,500$ ‐$ 325,500$ 0%‐$ Property Taxes ‐ Town (Current) 12,633 ‐ 12,633 12,633 0 100%15,053 ‐16%Property Taxes ‐ Town (Rollback) ‐ ‐ ‐ ‐ ‐ 0%‐ Property Taxes ‐ County (Current) 3,616 ‐ 3,616 3,137 479 87%3,738 ‐16%Sales Taxes ‐ Town 150 ‐ 150 8 142 5%14 ‐40%Sales Taxes ‐ EDC 150 ‐ 150 8 142 5%14 ‐40%Investment Income 500 ‐ 500 498 2 100%580 ‐14% Total Revenue 342,549$ ‐$ 342,549$ 16,283$ 326,266$ 5%19,397$ ‐16%EXPENDITURESProfessional Services ‐$ ‐$ ‐$ ‐$ ‐ ‐$ Developer Rebate 342,549 ‐ 342,549 16,504 326,045 5%19,959 ‐17%Transfers Out ‐ ‐ ‐ ‐ ‐ ‐ Total Expenditures 342,549$ ‐$ 342,549$ 16,504$ 326,045$ 5%19,959$ ‐17%REVENUE OVER (UNDER) EXPENDITURES ‐$ (220)$ (562)$ Beginning Fund Balance October 1 25,542 25,542 25,922 Ending Fund Balance Current Month 25,542$ 25,322$ 25,360$ 13Page 30Item 3.
TOWN OF PROSPER, TEXASMONTHLY FINANCIAL REPORTAugust 31, 2020Expected Year to Date Percent 91.66%WATER IMPACT FEES FUNDCurrent YearCurrent YearCurrent YearProjectProject Original Budget Amended Current YearCurrent YearCurrent RemainingPrior Years BudgetSTATUS OF Budget Budget Adjustment Budget Actual Encumbrances Budget Balance Expenditure BalancePROJECTREVENUESImpact Fees Water 3,000,000$ ‐$ 3,000,000$ 3,549,838$ Interest ‐ Water 45,000 ‐ 45,000 51,478 Total Revenues 3,045,000$ ‐$ 3,045,000$ 3,601,316$ EXPENDITURESDeveloper ReimbursementsProsper Partners Developer Reimb50,910 50,910‐ 50,910‐ ‐ 50,910 50,910 Parks at Legacy Developer Reimb 150,000 150,000‐ 150,000321,962 ‐ (171,962) (171,962) Matching revenue to offset overageProsper Lakes ‐ ‐ ‐ ‐ 55,810 ‐ (55,810) (55,810) Star Trail Developer Reimb450,000 450,000‐ 450,000323,152 ‐ 126,849 126,849 TVG Windsong Developer Reimb280,000 280,000‐ 280,000259,088 ‐ 20,912 20,912 Total Developer Reimbursements930,910$ 930,910$ ‐$ 930,910$ 960,012$ ‐$ (29,102)$ ‐$ (80,012)$ Capital ExpendituresCounty Line Elevated Storage 626,147 ‐ 55,970 55,97055,726 244 ‐ 573,097 53,050 Construction 90% complete24" Water Line County Line EST/DNT1,004,850 ‐ 139,307 139,30782,975 56,332 ‐ 809,548 195,302 Project completeTotal Projects 1,630,997$ ‐$ 195,278$ 195,278$ 138,701$ 56,576$ ‐$ 1,382,645$ 248,352$ Total Expenditures2,561,907$ 930,910$ 195,278$ 1,126,188$ 1,098,713$ 56,576$ (29,102)$ 1,382,645$ 168,340$ REVENUE OVER (UNDER) EXPENDITURES1,918,812$ 2,502,603$ Beginning Fund Balance October 11,509,936 1,509,936 Ending Fund Balance Current Month3,428,748$ 4,012,539$ 14Page 31Item 3.
TOWN OF PROSPER, TEXASMONTHLY FINANCIAL REPORTAugust 31, 2020Expected Year to Date Percent 91.66%WASTEWATER IMPACT FEES FUNDCurrent YearCurrent YearCurrent YearProjectProject Original Budget Amended Current YearCurrent YearCurrent RemainingPrior Years BudgetSTATUS OF Budget Budget Adjustment Budget Actual Encumbrances Budget Balance Expenditure BalancePROJECTREVENUESImpact Fees Wastewater 850,000$ ‐$ 850,000$ 1,308,027$ Interest ‐ Wastewater 35,000 ‐ 35,000 41,771 Upper Trinity Equity Fee200,000 ‐ 200,000 283,000 Total Revenues 1,085,000$ ‐$ 1,085,000$ 1,632,798$ EXPENDITURESDeveloper ReimbursementsDeveloper Reimbursements 100,000 100,000 (100,000) ‐ ‐ ‐ ‐ ‐ LaCima #2 Interceptor220,000 7,117 ‐ 7,117 31,418 ‐ (24,301) 212,883 (24,301) TVG Westside Utility Developer Reimb250,000 250,000 ‐ 250,000 101,268 ‐ 148,732 148,732 Prosper Partners Utility Developer Reimb75,000 75,000 ‐ 75,000 177,041 ‐ (102,041) (102,041) Matching revenue to offset overageFrontier Estates Developer Reimb51,225 51,225 ‐ 51,225 27,281 ‐ 23,945 23,945 LaCima Developer Reimb 50,000 50,000 ‐ 50,000 18,060 ‐ 31,940 31,940 Brookhollow Developer Reimb25,000 25,000 ‐ 25,000 ‐ ‐ 25,000 25,000 Star Trail Developer Reimb100,000 100,000 ‐ 100,000 ‐ ‐ 100,000 100,000 TVG Windsong Developer Reimb200,000 200,000 ‐ 200,000 193,225 ‐ 6,775 6,775 All Storage Developer Reimb15,000 15,000 ‐ 15,000 ‐ ‐ 15,000 15,000 Legacy Garden Developer Reimb ‐ ‐ 100,000 100,000 8,879 ‐ 91,121 91,121 Total Developer Reimbursements1,086,225$ 873,342$ ‐$ 873,342$ 557,172$ ‐$ 316,171$ 212,883$ 316,171$ Capital Expenditures‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Total Projects ‐$ ‐$ ‐$ ‐$ ‐$ ‐$ ‐$ ‐$ ‐$ Total Expenditures1,086,225$ 873,342$ ‐$ 873,342$ 557,172$ ‐$ 316,171$ 212,883$ 316,171$ REVENUE OVER (UNDER) EXPENDITURES211,658$ 1,075,626$ Beginning Fund Balance October 11,770,076 1,770,076 Ending Fund Balance Current Month1,981,734$ 2,845,702$ 15Page 32Item 3.
TOWN OF PROSPER, TEXASMONTHLY FINANCIAL REPORTAugust 31, 2020Expected Year to Date Percent 91.66%THOROUGHFARE IMPACT FEES FUNDCurrent Year Current Year Current YearProjectProject Original Budget Amended Current Year Current Year Current Remaining Prior Years Budget STATUS OF Budget Budget Adjustment Budget Actual Encumbrances Budget Balance Expenditure Balance PROJECTREVENUES East Thoroughfare Impact Fees 1,000,000$ ‐$ 1,000,000$ 1,167,916$ East Thoroughfare Other Revenue 132,438 ‐ 110,980 ‐ West Thoroughfare Impact Fees 2,500,000 ‐ 2,500,000 3,465,463 West Thoroughfare Other Revenue 110,980 ‐ 110,980 ‐ Interest‐East Thoroughfare Impact Fees 25,000 ‐ 25,000 30,185 Interest‐West Thoroughfare Impact Fees 30,000 ‐ 30,000 35,633 Total Revenues 3,798,418$ ‐$ 3,776,960$ 4,699,197$ EXPENDITURESEastDeveloper Reimbursement ‐ 300,000 (300,000) ‐ ‐ ‐ ‐ ‐ ‐ Developer Reimbursement ‐ Tanners Mill 300,000 ‐ 300,000 300,000 ‐ ‐ 300,000 ‐ 300,000 FM2478 ROW (US380‐FM1461) 148,832 69,168 (69,168) ‐ ‐ ‐ ‐ 148,832 ‐ TxDOT anticipates bidding project in September 2020Coleman (Gorgeous ‐ Prosper Trail) 250,000 250,000 ‐ 250,000 ‐ ‐ 250,000 ‐ 250,000 Prosper Trail (Coit‐Custer) 810,000 ‐ 39,997 39,997 39,997 ‐ ‐ 570,003 200,000 Awarded August 11th; Construction 0% completeCoit Road (First‐Frontier) 1,289,900 ‐ 506,027 506,027 137,988 368,670 (630) 783,873 (630) Design 90% completeCoit Road and US 380 ‐ 35,000 (35,000) ‐ ‐ ‐ ‐ ‐ ‐ Traffic Signal ‐ Coit & Richland 460,000 300,000 160,000 460,000 27,204 134,599 298,196 ‐ 298,196 Design 90% completeTransfer to Capital Project Fund ‐ FM2478 ROW ‐ ‐ 104,168 104,168 104,168 ‐ ‐ ‐ ‐ Transfer for FM2478 ROW (US380‐FM1461)Total East 3,258,732$ 954,168$ 706,025$ 1,660,193$ 309,357$ 503,269$ 847,566$ 1,502,708$ 1,047,566$ WestDeveloper Reimbursements ‐ 750,000 (750,000) ‐ ‐ ‐ ‐ ‐ ‐ Parks at Legacy Developer Reimb 300,000 300,000 ‐ 300,000 178,839 ‐ 121,161 ‐ 121,161 TVG Developer Reimb 600,000 600,000 ‐ 600,000 ‐ ‐ 600,000 ‐ 600,000 Star Trail Developer Reimb 750,000 750,000 ‐ 750,000 725,543 ‐ 24,457 ‐ 24,457 Tellus Windsong Developer Reimb 750,000 ‐ 750,000 750,000 476,796 ‐ 273,204 ‐ 273,204 1,525,000 ‐ 667,822 667,822 109,022 488,321 70,480 629,514 298,143 Phase I bids open September 14; Phase II construction 99% completeTraffic Signal ‐ Fishtrap & Teel 250,000 250,000 150,000 400,000 111,489 286,329 2,182 ‐ 2,182 Construction substantially completeTraffic Signal ‐ Fishtrap & Gee 300,000 300,000 ‐ 300,000 17,240 77,102 205,658 ‐ 205,658 Design 90% completeTraffic Signal ‐ Fishtrap & Windsong 50,000 50,000 ‐ 50,000 ‐ ‐ 50,000 ‐ 50,000 Traffic Signal Warrant Study revealed project is not warrantedFishtrap (Elem ‐ DNT) ‐ 100,000 (100,000) ‐ ‐ ‐ ‐ ‐ ‐ Funds Transferred to CIP FundTeel ‐ 380 Intersection Improvements 100,000 100,000 ‐ 100,000 1,045 94,940 4,015 ‐ 4,015 Staff anticipates receiving 60% design drawings by end of September 2020Transfer to Capital Project Fund ‐ Fishtrap 100,000 ‐ 100,000 100,000 100,000 ‐ ‐ ‐ ‐ Transfer for Fishtrap (Elem‐DNT)Total West 4,725,000$ 3,200,000$ 817,822$ 4,017,822$ 1,719,974$ 946,691$ 1,351,157$ 629,514$ 1,578,820$ Total Expenditures 7,983,732$ 4,154,168$ 1,523,847$ 5,678,015$ 2,029,332$ 1,449,960$ 2,198,723$ 2,132,222$ 2,626,386$ REVENUE OVER (UNDER) EXPENDITURES(1,901,055)$ 2,669,865$ Beginning Fund Balance October 12,291,042 2,291,042 Ending Fund Balance Current Month389,987$ 4,960,907$ E‐W Collector Cook Lane (First ‐ End)16Page 33Item 3.
TOWN OF PROSPER, TEXASMONTHLY FINANCIAL REPORTAugust 31, 2020Expected Year to Date Percent 91.66%SPECIAL REVENUE FUNDSOriginal Budget Amended Current YearCurrent YearCurrent RemainingPrior Year Change fromBudget Adjustment Budget YTD Actual Encumbrances Budget Balance YTD Percent Note YTD Obligated Prior YearPolice Donation Revenue 15,000$ ‐$ 15,000$ 12,515$ ‐$ 2,485$ 83%15,676$ ‐20%Fire Donation Revenue 13,200 ‐ 13,200 12,349 ‐ 851 94%17,160 ‐28%Child Safety Revenue 12,000 ‐ 12,000 9,616 ‐ 2,384 80%10,079 ‐5%Court Security Revenue 8,500 ‐ 8,500 6,965 ‐ 1,535 82%8,361 ‐17%Court Technology Revenue 10,000 ‐ 10,000 7,337 ‐ 2,663 73%11,148 ‐34%Interest Income 6,000 ‐ 6,000 7,141 ‐ (1,141) 119%7,367 ‐3%Interest Income CARES Funds ‐ ‐ ‐ 3,576 ‐ (3,576) ‐ Tree Mitigation ‐ ‐ ‐ 144,863 ‐ (144,863) ‐ Miscellaneous ‐ ‐ ‐ 12,074 ‐ (12,074) 5,706 112%CARES Funds ‐ 1,344,150 1,344,150 1,352,242 ‐ (8,092) 101%‐ Transfer In ‐ ‐ ‐ ‐ ‐ ‐ ‐ Total Revenue 64,700$ 1,344,150$ 1,408,850$ 1,568,678$ ‐$ (159,828)$ 111%75,498$ 1978%EXPENDITURESLEOSE Expenditure‐$ ‐$ ‐$ ‐$ ‐$ ‐$ 150$ Court Technology Expense 10,000 ‐ 10,000 9,640 175 185 98%1 12,447 ‐23%Court Security Expense 10,112 ‐ 10,112 1,141 ‐ 8,971 11%7,056 ‐84%Police Donation Expense 60,416 ‐ 60,416 51,669 9,936 (1,189) 102%1 2,495 1971%Fire Donation Expense 17,826 ‐ 17,826 6,505 4,157 7,164 60%27,753 ‐77%Child Safety Expense 5,000 ‐ 5,000 575 ‐ 4,425 12%3,781 ‐85%Tree Mitigation Expense 50,000 ‐ 50,000 ‐ ‐ 50,000 0%‐ Police Seizure Expense 1,646 8,817 10,463 9,284 ‐ 1,179 89%1 9,020 3%CARES Collin County‐ 1,098,850 1,098,850 148,851 674,694 275,304 75%‐ CARES Denton County ‐ 245,300 245,300 98,271 118,171 28,858 88%‐ CARES HHS ‐ ‐ ‐ 2,510 5,700 (8,210) ‐ Total Expenses 155,000$ 1,352,967$ 1,507,967$ 325,936$ 807,133$ 374,897$ 22%62,702$ 420%REVENUE OVER (UNDER) EXPENDITURES (90,300)$ (8,817)$ (99,117)$ 1,242,741$ 12,796$ Beginning Fund Balance October 1356,769 356,769 1,755,882 Ending Fund Balance Current Month257,652$ 1,599,510$ 1,768,678$ Notes1 Funds have been encumbered or spent for approved budgeted expenditures.17Page 34Item 3.
TOWN OF PROSPER, TEXASMONTHLY FINANCIAL REPORTAugust 31, 2020CAPITAL PROJECTS FUND ‐ GENERALCurrent Year Current Year Current YearProjectProject Original Budget Amended Current Year Current Year Current Remaining Prior Years Budget STATUS OF Budget Budget Adjustment Budget Actual Encumbrances Budget Balance Expenditure Balance PROJECTREVENUESGrants‐$ ‐$ ‐$ ‐$ Bond Proceeds 12,390,000 ‐ 12,390,000 ‐ Interest‐ ‐ ‐ 162,489 Interest‐2006 Bond ‐ ‐ ‐ 342 Interest‐2008 Bond ‐ ‐ ‐ ‐ Interest‐2012 GO Bond ‐ ‐ ‐ ‐ Interest‐2015 Bond ‐ ‐ ‐ 9,404 Interest‐2016 Bond ‐ ‐ ‐ 68 Interest‐2017 Bond ‐ ‐ ‐ 103 Interest‐2018 Bond ‐ ‐ ‐ 8,931 Interest‐2019 Bond ‐ ‐ ‐ 158,321 Transfers In ‐ General Fund 393,598 1,250,000 1,791,525 1,761,770 includes transfers from Escrow funds as wellTransfers In ‐ Impact Fee Funds ‐ 204,168 204,168 204,168 Transfers In ‐ Bond Funds ‐ ‐ ‐ 11,396,460 Total Revenues 12,783,598$ 1,454,168$ 14,385,693$ 13,702,057$ EXPENDITURESFishtrap Seg 1 (Teel‐Mid Schl) 1,470,000 1,470,000 ‐ 1,470,000 1,441,092 ‐ 28,908 ‐ 28,908 Project completeWest Prosper Roads 16,185,618 3,404,618 82,032 3,486,650 1,394,646 256,154 1,835,850 12,127,945 2,406,873 Segment E on hold; Rehabilitation of Fishtrap between FM 1385 and Fox Drive is completeBNSF Quiet Zone First/Fifth 145,000 ‐ 145,000 145,000 ‐ ‐ 145,000 ‐ 145,000 Prosper Trail (Coit‐Custer) 2 Lanes 6,000,000 4,750,000 1,372,000 6,122,000 150,874 5,246,990 724,136 ‐ 602,136 Construction 0% completeDowntown Enhancements 2,736,769 ‐ 20,040 20,040 1,040 6,000 13,000 2,714,785 14,944 Project completeProsper Trail (Kroger to Coit) 4,869,055 208,166 1,065,938 1,274,104 900,172 242,455 131,478 3,648,131 78,297 Project completeFirst St (DNT to Coleman) 2,786,567 ‐ 720,317 720,317 ‐ 720,317 (0) 1,109,701 956,549 Design 70% completeOld Town Streets 1,000,000 ‐ 15,904 15,904 11,460 6,794 (2,351) 975,016 6,730 Project completeFishtrap (Elem‐DNT) 4 Lanes 16,450,000 800,000 100,000 900,000 313,750 586,250 ‐ ‐ 15,550,000 Design 30% completeFishtrap segment 2 PISD reimbursement 1,164,000 ‐ ‐ ‐ 1,634 ‐ (1,634) ‐ 1,162,366 Project completeFirst St (Coit‐Custer) 4 Lanes 1,000,000 1,000,000 ‐ 1,000,000 321,250 678,750 ‐ ‐ ‐ Design 50% complete; staff reviewing 50% plansCoit Rd (First‐Frontier) 4 Lanes 17,589,900 800,000 ‐ 800,000 ‐ ‐ 800,000 783,843 16,806,057 Design 90% completeCoit Rd at US 380 Right Turn Lane 125,000 125,000 ‐ 125,000 53,692 67,360 3,948 ‐ 3,948 Cook Lane (First‐End) 2,100,000 2,100,000 ‐ 2,100,000 728,410 392,514 979,077 ‐ 979,077 Phase I bidding; Phase II construction 99% completeVictory Way (Coleman‐Frontier) 2,500,000 ‐ 2,318,812 2,318,812 546,705 1,566,694 205,414 181,438 205,164 Construction 40% completeFishtrap (Teel Intersection Improvements) 1,550,000 1,446,450 63,175 1,509,625 1,130,867 290,927 87,831 41,097 87,109 Construction substantially completeProsper Trail/DNT Intersection Improvements 1,688,000 1,600,000 4,805 1,604,805 4,900 ‐ 1,599,905 83,195 1,599,905 Construction 0% completeFishtrap Section 1 & 4 778,900 ‐ 636,400 636,400 520,920 56,200 59,280 151,889 49,892 Segment 1 ‐ complete; Segment 4 ‐ Design 90% completeColeman St (At Prosper HS) 90,000 90,000 ‐ 90,000 ‐ ‐ 90,000 ‐ 90,000 Project completeEighth Street (Church‐PISD) 246,517 5,759 5,759 5,759 3,657 ‐ 2,102 240,759 2,102 Project completeField Street (First‐Broadway) 140,060 1,547 1,547 1,547 1,557 ‐ (10) 138,513 (10) Project completeAcacia Parkway 1,022,782 124,780 ‐ 124,780 67,148 ‐ 57,632 898,002 57,632 Ongoing legal feesColeman (Gorgeous‐Prosper Trail) 375,000 26,814 15,155 26,814 15,155 ‐ 11,659 348,186 11,658 Project completeFifth Street (Coleman‐Church) 268,047 116,665 2,512 116,665 7,191 ‐ 109,474 258,344 2,512 Project completeThird St (Main‐Coleman) 76,363 116,665 5,714 116,665 ‐ ‐ 116,665 70,649 5,714 Project completeFM2478 (US380‐FM1461) 371,605 ‐ 243,373 243,373 68,832 ‐ 174,541 ‐ 302,773 TxDOT anticipates bidding project in September 2020Total Street Projects 82,729,183$ 18,186,464$ 6,818,484$ 24,974,260$ 7,684,952$ 10,117,405$ 7,171,903$ 23,771,492$ 41,155,334$ Traffic Signal ‐ Coit/First 306,299 ‐ 306,299 306,299 264,359 ‐ 41,940 ‐ 41,940 Project completeUS 380 Median Lighting 485,000 ‐ 485,000 485,000 174,494 291,559 18,948 ‐ 18,948 Traffic Signal ‐ Fishtrap/Teel 34,100 ‐ 21,122 21,122 15,100 6,022 ‐ 12,978 ‐ Construction substantially completeTotal Traffic Projects 825,399$ ‐$ 812,421$ 812,421$ 453,953$ 297,581$ 60,888$ 12,978$ 60,888$ HWY 289 Gateway Monument 474,752 ‐ 166,848 166,848 166,848 1,000 (1,000) 291,392 15,512 Project CompleteTown Hall Open Space Enhancements 52,000 ‐ 5,975 5,975 6,010 ‐ (35) 21,298 24,692 US 380 Median Design (Green Ribbon) 809,250 ‐ 18,000 18,000 875 15,575 1,550 53,250 739,550 Construction 20% completeWhitley Place H&B Trail Extension 180,000 ‐ 171,688 171,688 6,313 169,375 (4,000) 4,313 ‐ Project 85% designedWhitley Place H&B Trail Extension (Pwr line Esmnt) 280,000 280,000 ‐ 280,000 ‐ 15,725 264,275 ‐ 264,275 Frontier Park Storage 147,927 ‐ 147,927 147,927 10,723 ‐ 137,204 ‐ 137,204 Pecan Grove Ph II 67,000 67,000 ‐ 67,000 ‐ 50,940 16,060 ‐ 16,060 Total Park Projects 2,010,929$ 347,000$ 510,438$ 857,438$ 190,769$ 252,615$ 414,054$ 370,253$ 779,754$ Town Hall ‐ FF&E 1,362,000 ‐ 78,604 78,604 11,995 6,800 59,809 1,283,396 59,809 Art for Town Hall has been put on holdPublic Safety Complex, Phase 1 1,644,696 ‐ 288,146 288,146 205,151 126,716 (43,720) 1,248,251 64,578 Construction substantially completeParks and Public Works Complex 3,450,000 ‐ ‐ ‐ 5 ‐ (5) 2,291,751 1,158,244 Land purchasedPublic Safety Complex, Phase 1‐Dev Costs 550,000 ‐ 550,000 550,000 52,078 ‐ 497,922 ‐ 497,922 Construction substantially completePublic Safety Complex, Phase 1‐Construction 12,645,804 ‐ 10,391,849 10,391,849 9,504,572 685,143 202,134 2,253,955 202,134 Construction substantially completePublic Safety Complex, Phase 1‐FFE 1,165,000 ‐ 1,165,000 1,165,000 431,671 639,507 93,822 ‐ 93,822 Construction substantially completeFire Ladder Truck 1,649,651 ‐ 1,222,296 1,222,296 1,223,036 4,392 (5,132) 416,648 5,576 DeliveredTotal Facility Projects 22,467,151$ ‐$ 13,695,895$ 13,695,895$ 11,428,507$ 1,462,558$ 804,830$ 7,494,001$ 2,082,085$ Transfer Out ‐ ‐ ‐ ‐ 47,737 ‐ ‐ 1,698,003 ‐ Total Expenditures 108,032,662$ 18,533,464$ 21,837,238$ 40,340,015$ 19,805,918$ 12,130,159$ 8,451,675$ 33,346,726$ 44,078,060$ REVENUE OVER (UNDER) EXPENDITURES (25,954,322)$ (6,103,861)$ Beginning Fund Balance October 130,374,056 30,374,056 Ending Fund Balance Current Month4,419,734$ 24,270,195$ 18Page 35Item 3.
TOWN OF PROSPER, TEXASMONTHLY FINANCIAL REPORTAugust 31, 2020CAPITAL PROJECTS FUND‐WATER/SEWERCurrent Year Current Year Current YearProjectProject Original Budget Amended Current Year Current Year Current Remaining Prior Year BudgetSTATUS OF Budget Budget Adjustment Budget Actual Encumbrances Budget Balance Expenditure BalancePROJECTREVENUESInterest Income ‐$ ‐$ ‐$ 120,493$ Interest‐2016 CO Bond ‐ ‐ ‐ 3,290 Interest‐2017 CO Bond ‐ ‐ ‐ 2,744 Interest‐2018 CO Bond ‐ ‐ ‐ 27,487 Interest‐2019 CO Bond ‐ ‐ ‐ 23,915 Bond Proceeds‐ ‐ ‐ ‐ Transfers In ‐ Impact Fees ‐ ‐ ‐ ‐ Transfers In‐ ‐ 4,126,507 4,126,507 Transfers In‐Bond Funds ‐ ‐ ‐ 6,073,232 Total Revenues ‐$ ‐$ 4,126,507$ 10,377,668$ EXPENDITURESLower Pressure Plane Pump Station Design 1,585,100 ‐ 1,434,400 1,434,400 762,042 672,358 ‐ 138,416 12,284 Design 50% completeFishtrap EST (South) 6,433,700 ‐ 4,673,862 4,673,862 2,898,555 1,381,282 394,025 1,478,296 675,567 Construction 90% completeWater Supply Line Phase 1 13,179,550 ‐ 4,806,793 4,806,793 3,201,894 134,739 1,470,160 8,821,919 1,020,998 Project completeCuster Rd Meter Station/Water Line Relocation 2,791,600 ‐ 3,788,599 3,788,599 140,601 3,595,113 52,885 78,233 (1,022,347) Construction 0% completeChurch/Parvin WW Reconstruction 100,000 100,000 ‐ 100,000 ‐ 92,700 7,300 ‐ 7,300 E‐W Collector (Cook‐DNT) 695,775 ‐ 411,000 411,000 56,781 22,823 331,396 290,775 325,396 Est completion Fall 2020Broadway (Parvin‐Craig) 150,000 ‐ 150,000 150,000 ‐ ‐ 150,000 ‐ 150,000 Coit Rd/US 380 Water Valve ‐ ‐ ‐ ‐ ‐ 7,276 (7,276) ‐ (7,276) Fifth Street Water line 200,000 ‐ 6,830 6,830 7,540 ‐ (710) 185,370 7,090 Project completeTotal Water & Wastewater Projects 25,135,725$ 100,000$ 15,271,484$ 15,371,484$ 7,067,413$ 5,906,291$ 2,397,780$ 10,993,008$ 1,169,013$ Old Town Drainage 500,000 427,564 9,800 437,364 6,195 338,646 92,522 62,636 92,522 Construction 35% completeOld Town Drainage Broadway Design & Construction 647,765 479,365 21,400 500,765 7,486 491,604 1,676 114,600 34,076 Construction 15% completeTotal Drainage Projects 1,147,765$ 906,929$ 31,200$ 938,129$ 13,681$ 830,250$ 94,198$ 177,236$ 126,598$ Transfer out‐ Total Expenses 26,283,490$ 1,006,929$ 15,302,684$ 16,309,613$ 7,081,094$ 6,736,541$ 2,491,978$ 11,170,244$ 1,295,610$ (12,183,106)$ 3,296,574$ Beginning Working Capital October 124,986,719 24,986,719 Ending Working Capital Current Month12,803,613$ 28,283,293$ 19Page 36Item 3.
Account Number Description Current Current Current Current Current Encumbrances Percent YTD Current Year Year Year YTD Month % Remaining Adopted Budget Amendments Amended Budget Actual Actual Budget 100‐4035‐10‐00 3% Construction Fee (400,000.00) (400,000.00) (700,380.67) (65,661.43) 175.10 300,380.67 100‐4061‐10‐00 Notary Fees (200.00) (200.00) (146.00) (18.00) 73.00 (54.00) Subtotal object ‐ 04 (400,200.00) (400,200.00) (700,526.67) (65,679.43) 175.04 300,326.67 100‐4105‐10‐00 Property Taxes ‐Delinquent (140,000.00) (140,000.00) (397,386.90) (21,852.15) 283.85 257,386.90 100‐4110‐10‐00 Property Taxes ‐Current (16,355,933.00) (16,355,933.00) (16,461,077.26) (12,084.01) 100.64 105,144.26 100‐4111‐10‐00 VIT Motor Vehicle Tax (10,000.00) (10,000.00) (9,305.10) 93.05 (694.90) 100‐4115‐10‐00 Taxes ‐Penalties (75,000.00) (75,000.00) (126,857.98) (6,390.39) 169.14 51,857.98 100‐4120‐10‐00 Sales Taxes (5,011,936.00) (5,011,936.00) (5,342,029.99) (664,124.35) 106.59 330,093.99 100‐4130‐10‐00 Sales Tax‐Mixed Beverage (65,597.00) (65,597.00) (55,231.57) 84.20 (10,365.43) 100‐4140‐10‐00 Franchise Taxes ‐ Electric (930,800.00) (930,800.00) (563,627.00) 60.55 (367,173.00) 100‐4150‐10‐00 Franchise Taxes ‐ Telephone (149,297.00) (149,297.00) (63,088.86) (10,580.35) 42.26 (86,208.14) 100‐4160‐10‐00 Franchise Taxes ‐ Gas (207,500.00) (207,500.00) (163,098.41) 78.60 (44,401.59) 100‐4170‐10‐00 Franchise Taxes ‐ Road Usage (50,502.00) (50,502.00) (114,709.21) (25,897.07) 227.14 64,207.21 100‐4185‐10‐00 Franchise Fee ‐ W/S Fund (339,271.00) (339,271.00) (310,998.38) (28,272.58) 91.67 (28,272.62) 100‐4190‐10‐00 Franchise Fee‐Cable (54,005.00) (54,005.00) (45,938.66) 85.06 (8,066.34) Subtotal object ‐ 04 (23,389,841.00) (23,389,841.00) (23,653,349.32) (769,200.90) 101.13 263,508.32 100‐4202‐10‐00 NTTA Tag Sales (150.00) (150.00) (90.00) 60.00 (60.00) 100‐4203‐10‐00 New Cingular Tower Lease (24,000.00) (24,000.00) (22,259.67) (2,050.00) 92.75 (1,740.33) 100‐4218‐10‐00 Administrative Fees‐EDC (15,000.00) (15,000.00) (13,750.00) (1,250.00) 91.67 (1,250.00) 100‐4230‐10‐00 Other Permits (1,555.00) (1,555.00) (2,525.00) 162.38 970.00 Subtotal object ‐ 04 (40,705.00) (40,705.00) (38,624.67) (3,300.00) 94.89 (2,080.33) 100‐4610‐10‐00 Interest Income (300,249.00) (300,249.00) (252,175.81) (17,770.84) 83.99 (48,073.19) Subtotal object ‐ 04 (300,249.00) (300,249.00) (252,175.81) (17,770.84) 83.99 (48,073.19) 100‐4910‐10‐00 Other Revenue (15,000.00) (15,000.00) (40,497.27) 269.98 25,497.27 100‐4995‐10‐00 Transfer In/Out (989,087.00) (989,087.00) (906,663.01) (82,423.91) 91.67 (82,423.99) Subtotal object ‐ 04 (1,004,087.00) (1,004,087.00) (947,160.28) (82,423.91) 94.33 (56,926.72) Program number: DEFAULT PROGRAM (25,135,082.00) (25,135,082.00) (25,591,836.75) (938,375.08) 101.82 456,754.75 100‐4060‐10‐07 NSF Fees (25.00) (25.00) ‐ 25.00 Subtotal object ‐ 04 (25.00) (25.00) ‐ 25.00 100‐4410‐10‐07 Court Fines (474,163.00) (474,163.00) (282,185.91) (21,817.57) 59.51 (191,977.09) 100‐4425‐10‐07 Time Payment Fee Reimb (360.00) ‐ 360.00 Subtotal object ‐ 04 (474,163.00) (474,163.00) (282,545.91) (21,817.57) 59.59 (191,617.09) Program number: 7 MUNICIPAL COURT (474,163.00) (474,163.00) (282,570.91) (21,842.57) 59.59 (191,592.09) 100‐4930‐10‐99 Insurance Proceeds (40,000.00) (40,000.00) (46,129.89) 115.33 6,129.89 Subtotal object ‐ 04 (40,000.00) (40,000.00) (46,129.89) 115.33 6,129.89 Program number: 99 NON‐DEPARTMENTAL (40,000.00) (40,000.00) (46,129.89) 115.33 6,129.89 Department number: 10 ADMINISTRATION (25,649,245.00) (25,649,245.00) (25,920,537.55) (960,217.65) 101.06 271,292.55 100‐4030‐20‐01 Miscellaneous 8.00 ‐ (8.00) Subtotal object ‐ 04 8.00 ‐ (8.00) 100‐4230‐20‐01 Other Permits (2,025.00) (2,025.00) (175.00) (25.00) 8.64 (1,850.00) Subtotal object ‐ 04 (2,025.00) (2,025.00) (175.00) (25.00) 8.64 (1,850.00) 100‐4440‐20‐01 Accident Reports (1,236.00) (1,236.00) (1,421.00) (170.00) 114.97 185.00 100‐4450‐20‐01 Alarm Fee (52,982.00) (52,982.00) (62,570.00) (6,407.00) 118.10 9,588.00 Subtotal object ‐ 04 (54,218.00) (54,218.00) (63,991.00) (6,577.00) 118.03 9,773.00 100‐4510‐20‐01 Grants (12,000.00) (32,000.00) (44,000.00) (57,658.92) (1,343.37) 131.04 13,658.92 Subtotal object ‐ 04 (12,000.00) (32,000.00) (44,000.00) (57,658.92) (1,343.37) 131.04 13,658.92 100‐4910‐20‐01 Other Revenue (5,000.00) (5,000.00) (5,472.50) (90.00) 109.45 472.50 Subtotal object ‐ 04 (5,000.00) (5,000.00) (5,472.50) (90.00) 109.45 472.50 Program number: 1 OPERATIONS (73,243.00) (32,000.00) (105,243.00) (127,289.42) (8,035.37) 120.95 22,046.42 Department number: 20 POLICE (73,243.00) (32,000.00) (105,243.00) (127,289.42) (8,035.37) 120.95 22,046.42 100‐4310‐30‐01 Charges for Services (404,247.00) (404,247.00) (397,031.01) (29,090.14) 98.22 (7,215.99) Subtotal object ‐ 04 (404,247.00) (404,247.00) (397,031.01) (29,090.14) 98.22 (7,215.99) 100‐4411‐30‐01 CC Fire Assoc (500.00) (500.00) (2,249.43) 449.89 1,749.43 20Page 37Item 3.
Subtotal object ‐ 04 (500.00) (500.00) (2,249.43) 449.89 1,749.43 100‐4510‐30‐01 Grants (40,000.00) (372,672.00) (412,672.00) (312,777.27) 75.79 (99,894.73) Subtotal object ‐ 04 (40,000.00) (372,672.00) (412,672.00) (312,777.27) 75.79 (99,894.73) 100‐4910‐30‐01 Other Revenue (750.00) (750.00) (2,771.75) (325.00) 369.57 2,021.75 Subtotal object ‐ 04 (750.00) (750.00) (2,771.75) (325.00) 369.57 2,021.75 Program number: 1 OPERATIONS (445,497.00) (372,672.00) (818,169.00) (714,829.46) (29,415.14) 87.37 (103,339.54) 100‐4315‐30‐05 Fire Review/Inspect Fees (100,000.00) (100,000.00) (125,070.00) (8,350.00) 125.07 25,070.00 Subtotal object ‐ 04 (100,000.00) (100,000.00) (125,070.00) (8,350.00) 125.07 25,070.00 Program number: 5 MARSHAL (100,000.00) (100,000.00) (125,070.00) (8,350.00) 125.07 25,070.00 Department number: 30 FIRE (545,497.00) (372,672.00) (918,169.00) (839,899.46) (37,765.14) 91.48 (78,269.54) 100‐4017‐40‐01 Contractor Registration Fee (90,000.00) (90,000.00) (73,900.00) (5,600.00) 82.11 (16,100.00) 100‐4060‐40‐01 NSF Fees (200.00) ‐ 200.00 Subtotal object ‐ 04 (90,000.00) (90,000.00) (74,100.00) (5,600.00) 82.33 (15,900.00) 100‐4210‐40‐01 Building Permits (3,215,472.00) (3,215,472.00) (3,439,031.21) (295,003.51) 106.95 223,559.21 100‐4230‐40‐01 Other Permits (200,000.00) (200,000.00) (227,941.18) (23,263.00) 113.97 27,941.18 100‐4240‐40‐01 Plumb/Elect/Mech Permits (45,000.00) (45,000.00) (40,838.16) (3,708.00) 90.75 (4,161.84) 100‐4242‐40‐01 Re‐inspection Fees (60,000.00) (60,000.00) (97,800.00) (10,775.00) 163.00 37,800.00 Subtotal object ‐ 04 (3,520,472.00) (3,520,472.00) (3,805,610.55) (332,749.51) 108.10 285,138.55 100‐4910‐40‐01 Other Revenue (15,000.00) (15,000.00) (41,765.78) (7,696.17) 278.44 26,765.78 Subtotal object ‐ 04 (15,000.00) (15,000.00) (41,765.78) (7,696.17) 278.44 26,765.78 Program number: 1 INSPECTIONS (3,625,472.00) (3,625,472.00) (3,921,476.33) (346,045.68) 108.17 296,004.33 100‐4060‐40‐02 NSF FEES (25.00) ‐ 25.00 Subtotal object ‐ 04 (25.00) ‐ 25.00 100‐4211‐40‐02 Multi‐Family Registration (10,000.00) (10,000.00) (9,480.00) 94.80 (520.00) 100‐4245‐40‐02 Health Inspections (57,083.00) (57,083.00) (39,625.00) (2,550.00) 69.42 (17,458.00) Subtotal object ‐ 04 (67,083.00) (67,083.00) (49,105.00) (2,550.00) 73.20 (17,978.00) 100‐4910‐40‐02 Other Revenue (500.00) (500.00) ‐ (500.00) Subtotal object ‐ 04 (500.00) (500.00) ‐ (500.00) Program number: 2 CODE COMPLIANCE (67,583.00) (67,583.00) (49,130.00) (2,550.00) 72.70 (18,453.00) 100‐4220‐40‐03 Zoning Application Fees (15,000.00) (15,000.00) (36,719.50) (810.00) 244.80 21,719.50 100‐4225‐40‐03 Development Application Fees (50,000.00) (50,000.00) (65,675.00) (2,000.00) 131.35 15,675.00 Subtotal object ‐ 04 (65,000.00) (65,000.00) (102,394.50) (2,810.00) 157.53 37,394.50 100‐4910‐40‐03 Other Revenue (6,000.00) (6,000.00) (2,041.50) 34.03 (3,958.50) Subtotal object ‐ 04 (6,000.00) (6,000.00) (2,041.50) 34.03 (3,958.50) Program number: 3 PLANNING (71,000.00) (71,000.00) (104,436.00) (2,810.00) 147.09 33,436.00 Department number: 40 DEVELOPMENT SERVICES (3,764,055.00) (3,764,055.00) (4,075,042.33) (351,405.68) 108.26 310,987.33 100‐4002‐50‐01 Streets Study Review Fees (18,200.00) ‐ 18,200.00 Subtotal object ‐ 04 (18,200.00) ‐ 18,200.00 100‐4208‐50‐01 Network Node Annual User Fee (2,750.00) (2,750.00) ‐ 2,750.00 100‐4209‐50‐01 Network Node Monthly User Fee (2,750.00) (2,750.00) ‐ 2,750.00 Subtotal object ‐ 04 (5,500.00) (5,500.00) ‐ 5,500.00 100‐4910‐50‐01 Other Revenue (15,000.00) (15,000.00) (15,300.00) (2,700.00) 102.00 300.00 100‐4930‐50‐01 Insurance Claim Proceeds (1,375.00) (1,375.00) ‐ 1,375.00 Subtotal object ‐ 04 (15,000.00) (15,000.00) (16,675.00) (4,075.00) 111.17 1,675.00 Program number: 1 STREETS (15,000.00) (15,000.00) (40,375.00) (9,575.00) 269.17 25,375.00 Department number: 50 PUBLIC WORKS (15,000.00) (15,000.00) (40,375.00) (9,575.00) 269.17 25,375.00 100‐4056‐60‐00 Field Rental Fees (124,880.00) (124,880.00) (42,435.00) (575.00) 33.98 (82,445.00) 100‐4057‐60‐00 Pavilion User Fees (3,400.00) (3,400.00) (880.00) (245.00) 25.88 (2,520.00) 100‐4058‐60‐00 Park Program Fees (96,000.00) (96,000.00) (51,608.90) (10,324.20) 53.76 (44,391.10) Subtotal object ‐ 04 (224,280.00) (224,280.00) (94,923.90) (11,144.20) 42.32 (129,356.10) 100‐4721‐60‐00 Prosper Christmas Donations (21,000.00) (21,000.00) (20,580.00) (1,250.00) 98.00 (420.00) 100‐4725‐60‐00 Fishing Derby Sponsorships (500.00) ‐ 500.00 Subtotal object ‐ 04 (21,000.00) (21,000.00) (21,080.00) (1,250.00) 100.38 80.00 100‐4910‐60‐00 Other Revenue (10,000.00) (15,000.00) (25,000.00) (18,600.00) (200.00) 74.40 (6,400.00) Subtotal object ‐ 04 (10,000.00) (15,000.00) (25,000.00) (18,600.00) (200.00) 74.40 (6,400.00) Program number: DEFAULT PROGRAM (255,280.00) (15,000.00) (270,280.00) (134,603.90) (12,594.20) 49.80 (135,676.10) 21Page 38Item 3.
100‐4063‐60‐05 Lost Fees (1,000.00) (1,000.00) (1,300.08) (107.95) 130.01 300.08 100‐4064‐60‐05 Printing/Copying Fees (400.00) (400.00) (745.41) (82.55) 186.35 345.41 100‐4065‐60‐05 Book Fines (100.00) (100.00) ‐ (100.00) 100‐4066‐60‐05 Library Card Fees (7,000.00) (7,000.00) (4,550.00) (400.00) 65.00 (2,450.00) Subtotal object ‐ 04 (8,500.00) (8,500.00) (6,595.49) (590.50) 77.59 (1,904.51) 100‐4510‐60‐05 Grants (2,000.00) (2,000.00) ‐ (2,000.00) Subtotal object ‐ 04 (2,000.00) (2,000.00) ‐ (2,000.00) Program number: 5 LIBRARY (10,500.00) (10,500.00) (6,595.49) (590.50) 62.81 (3,904.51) Department number: 60 COMMUNITY SERVICES (265,780.00) (15,000.00) (280,780.00) (141,199.39) (13,184.70) 50.29 (139,580.61) 100‐4312‐98‐01 Engineering Plan Review Fee (1,800.00) ‐ 1,800.00 Subtotal object ‐ 04 (1,800.00) ‐ 1,800.00 Program number: 1 ENGINEERING (1,800.00) ‐ 1,800.00 Department number: 98 ENGINEERING (1,800.00) ‐ 1,800.00 Revenue Subtotal ‐ ‐ ‐ ‐ ‐ ‐ (30,312,820.00) (419,672.00) (30,732,492.00) (31,146,143.15) (1,380,183.54) 101.35 413,651.15 100‐5110‐10‐01 Salaries & Wages 165,153.00 165,153.00 153,002.58 12,936.80 92.64 12,150.42 100‐5140‐10‐01 Salaries ‐ Longevity Pay 105.00 105.00 100.00 95.24 5.00 100‐5143‐10‐01 Cell Phone Allowance 1,020.00 1,020.00 935.00 85.00 91.67 85.00 100‐5145‐10‐01 Social Security Expense 10,310.00 10,310.00 7,803.85 754.40 75.69 2,506.15 100‐5150‐10‐01 Medicare Expense 2,412.00 2,412.00 2,100.94 176.43 87.10 311.06 100‐5155‐10‐01 SUTA Expense 162.00 162.00 144.00 88.89 18.00 100‐5160‐10‐01 Health Insurance 16,441.00 16,441.00 12,429.22 968.42 75.60 4,011.78 100‐5165‐10‐01 Dental Insurance 467.00 467.00 399.48 36.06 85.54 67.52 100‐5170‐10‐01 Life Insurance/AD&D 113.00 113.00 189.86 17.26 168.02 (76.86) 100‐5175‐10‐01 Liability (TML)/Workers' Comp 316.00 316.00 384.75 35.06 121.76 (68.75) 100‐5180‐10‐01 TMRS Expense 22,531.00 22,531.00 20,808.32 1,758.41 92.35 1,722.68 100‐5185‐10‐01 Long/Short Term Disability 314.00 314.00 266.63 24.58 84.91 47.37 100‐5186‐10‐01 WELLE‐Wellness Prog Reimb Empl 600.00 600.00 550.00 50.00 91.67 50.00 100‐5191‐10‐01 Hiring Cost 92.28 ‐ (92.28) Subtotal object ‐ 05 219,944.00 219,944.00 199,206.91 16,842.42 90.57 20,737.09 100‐5210‐10‐01 Office Supplies 19.19 ‐ (19.19) 100‐5230‐10‐01 Dues,Fees,& Subscriptions 7,150.00 7,150.00 4,626.65 374.99 64.71 2,523.35 100‐5240‐10‐01 Postage and Delivery 50.00 50.00 9.00 2.40 18.00 41.00 100‐5250‐10‐01 Publications 200.00 200.00 ‐ 200.00 100‐5280‐10‐01 Printing and Reproduction 150.00 150.00 ‐ 150.00 100‐5290‐10‐01 Other Charges and Services 100.00 100.00 1,240.19 100.00 (1,140.19) Subtotal object ‐ 05 7,650.00 7,650.00 5,895.03 477.39 77.06 1,754.97 100‐5330‐10‐01 Copier Expense 1,400.00 1,400.00 514.16 36.73 885.84 Subtotal object ‐ 05 1,400.00 1,400.00 514.16 36.73 885.84 100‐5410‐10‐01 Professional Services 311,580.00 12,180.00 323,760.00 276,876.20 25,725.00 47,878.24 85.52 (994.44) 100‐5430‐10‐01 Legal Fees 62,725.00 62,725.00 129,492.69 13,188.35 206.45 (66,767.69) 100‐5480‐10‐01 Contracted Services 360.00 14,000.00 14,360.00 14,000.00 97.49 360.00 Subtotal object ‐ 05 374,665.00 26,180.00 400,845.00 420,368.89 38,913.35 47,878.24 104.87 (67,402.13) 100‐5530‐10‐01 Travel 5,200.00 5,200.00 1,092.32 21.01 4,107.68 100‐5533‐10‐01 Mileage Expense 200.00 200.00 36.57 18.29 163.43 100‐5536‐10‐01 Training/Seminars 1,450.00 1,450.00 905.00 135.00 62.41 545.00 Subtotal object ‐ 05 6,850.00 6,850.00 2,033.89 135.00 29.69 4,816.11 100‐7145‐10‐01 Transfer to VERF 132.00 132.00 121.00 11.00 91.67 11.00 Subtotal object ‐ 07 132.00 132.00 121.00 11.00 91.67 11.00 Program number: 1 TOWN MANAGER 610,641.00 26,180.00 636,821.00 628,139.88 56,379.16 47,878.24 98.64 (39,197.12) 100‐5110‐10‐02 Salaries & Wages 246,695.00 15,812.36 262,507.36 262,498.13 23,728.41 100.00 9.23 100‐5115‐10‐02 Salaries ‐ Overtime 2,000.00 2,000.00 585.99 29.30 1,414.01 100‐5140‐10‐02 Salaries ‐ Longevity Pay 625.00 625.00 790.00 126.40 (165.00) 100‐5143‐10‐02 Cell Phone Allowance 1,020.00 1,020.00 1,295.00 445.00 126.96 (275.00) 100‐5145‐10‐02 Social Security Expense 15,522.00 15,522.00 15,872.08 1,425.57 102.26 (350.08) 100‐5150‐10‐02 Medicare Expense 3,630.00 3,630.00 3,712.03 333.40 102.26 (82.03) 100‐5155‐10‐02 SUTA Expense 648.00 648.00 576.00 88.89 72.00 22Page 39Item 3.
100‐5160‐10‐02 Health Insurance 30,395.00 30,395.00 27,079.24 2,120.84 89.09 3,315.76 100‐5165‐10‐02 Dental Insurance 1,284.00 1,284.00 1,200.98 109.18 93.53 83.02 100‐5170‐10‐02 Life Insurance/AD&D 401.00 401.00 441.54 40.14 110.11 (40.54) 100‐5175‐10‐02 Liability (TML)/Workers' Comp 472.00 472.00 667.37 64.44 141.39 (195.37) 100‐5180‐10‐02 TMRS Expense 33,921.00 33,921.00 35,921.56 3,231.67 105.90 (2,000.56) 100‐5185‐10‐02 Long/Short Term Disability 469.00 469.00 455.91 45.06 97.21 13.09 100‐5186‐10‐02 WELLE‐Wellness Prog Reimb Empl 1,200.00 1,200.00 1,380.76 139.16 115.06 (180.76) 100‐5193‐10‐02 Records Retention 1,500.00 700.00 2,200.00 410.47 18.66 1,789.53 Subtotal object ‐ 05 339,782.00 16,512.36 356,294.36 352,887.06 31,682.87 99.04 3,407.30 100‐5210‐10‐02 Office Supplies 2,500.00 (1,000.00) 1,500.00 1,339.16 289.80 89.28 160.84 100‐5220‐10‐02 Office Equipment 1,500.00 (900.00) 600.00 669.85 (3.71) 111.64 (69.85) 100‐5230‐10‐02 Dues,Fees,& Subscriptions 2,050.00 300.00 2,350.00 3,354.25 142.73 (1,004.25) 100‐5240‐10‐02 Postage and Delivery 200.00 200.00 157.90 18.80 78.95 42.10 100‐5280‐10‐02 Printing and Reproduction 500.00 (300.00) 200.00 154.65 77.33 45.35 Subtotal object ‐ 05 6,750.00 (1,900.00) 4,850.00 5,675.81 304.89 117.03 (825.81) 100‐5310‐10‐02 Rental Expense 8,300.00 700.00 9,000.00 8,142.96 647.00 90.48 857.04 100‐5330‐10‐02 Copier Expense 1,800.00 1,800.00 512.58 28.48 1,287.42 Subtotal object ‐ 05 10,100.00 700.00 10,800.00 8,655.54 647.00 80.14 2,144.46 100‐5400‐10‐02 Uniform Expense 298.95 ‐ (298.95) 100‐5410‐10‐02 Professional Services 13,000.00 (8,000.00) 5,000.00 1,775.00 800.00 35.50 3,225.00 100‐5419‐10‐02 IT Licenses 5,800.00 (1,800.00) 4,000.00 4,719.33 719.33 117.98 (719.33) 100‐5430‐10‐02 Legal Fees 31,500.00 40,500.00 72,000.00 57,527.23 8,640.00 79.90 14,472.77 100‐5435‐10‐02 Legal Notices/Filings 8,800.00 (2,100.00) 6,700.00 4,751.60 289.20 70.92 1,948.40 100‐5460‐10‐02 Election Expense 12,000.00 (11,500.00) 500.00 643.83 158.85 128.77 (143.83) 100‐5480‐10‐02 Contracted Services 27,400.00 1,980.44 29,380.44 23,985.01 110.43 81.64 5,285.00 Subtotal object ‐ 05 98,500.00 19,080.44 117,580.44 93,700.95 10,607.38 110.43 79.69 23,769.06 100‐5520‐10‐02 Telephones 870.00 870.00 349.91 40.22 520.09 100‐5526‐10‐02 Data Network 460.00 460.00 341.91 37.99 74.33 118.09 100‐5530‐10‐02 Travel 8,600.00 (3,400.00) 5,200.00 1,935.37 37.22 3,264.63 100‐5533‐10‐02 Mileage Expense 700.00 700.00 105.55 15.08 594.45 100‐5536‐10‐02 Training/Seminars 2,600.00 (500.00) 2,100.00 1,005.81 100.00 47.90 1,094.19 100‐5538‐10‐02 Council/Public Official Expnse 34,000.00 34,000.00 18,893.40 522.01 55.57 15,106.60 Subtotal object ‐ 05 47,230.00 (3,900.00) 43,330.00 22,631.95 660.00 52.23 20,698.05 100‐5600‐10‐02 Special Events 10,861.00 (7,300.00) 3,561.00 1,550.74 43.55 2,010.26 Subtotal object ‐ 05 10,861.00 (7,300.00) 3,561.00 1,550.74 43.55 2,010.26 Program number: 2 TOWN SECRETARY 513,223.00 23,192.80 536,415.80 485,102.05 43,902.14 110.43 90.43 51,203.32 100‐5110‐10‐03 Salaries & Wages 574,032.00 7,790.54 581,822.54 483,975.44 42,484.29 83.18 97,847.10 100‐5115‐10‐03 Salaries ‐ Overtime 619.03 ‐ (619.03) 100‐5126‐10‐03 Salaries‐Vacation Buy‐Out 3,000.00 3,000.00 5,422.40 180.75 (2,422.40) 100‐5140‐10‐03 Salaries ‐ Longevity Pay 1,470.00 1,470.00 1,320.00 89.80 150.00 100‐5143‐10‐03 Cell Phone Allowance 2,040.00 2,040.00 2,445.00 290.00 119.85 (405.00) 100‐5145‐10‐03 Social Security Expense 35,994.00 35,994.00 27,453.19 2,434.12 76.27 8,540.81 100‐5150‐10‐03 Medicare Expense 8,418.00 8,418.00 6,620.75 569.28 78.65 1,797.25 100‐5155‐10‐03 SUTA Expense 1,134.00 1,134.00 1,016.80 89.67 117.20 100‐5160‐10‐03 Health Insurance 68,688.00 68,688.00 54,225.94 4,700.72 78.95 14,462.06 100‐5165‐10‐03 Dental Insurance 2,678.00 2,678.00 2,253.64 219.26 84.15 424.36 100‐5170‐10‐03 Life Insurance/AD&D 777.00 777.00 632.38 57.80 81.39 144.62 100‐5175‐10‐03 Liability (TML)/Workers' Comp 1,104.00 1,104.00 1,214.07 114.97 109.97 (110.07) 100‐5180‐10‐03 TMRS Expense 78,664.00 78,664.00 66,703.52 5,765.92 84.80 11,960.48 100‐5185‐10‐03 Long/Short Term Disability 1,091.00 1,091.00 799.87 80.73 73.32 291.13 100‐5186‐10‐03 WELLE‐Wellness Prog Reimb Empl 2,400.00 2,400.00 1,200.00 100.00 50.00 1,200.00 Subtotal object ‐ 05 781,490.00 7,790.54 789,280.54 655,902.03 56,817.09 83.10 133,378.51 100‐5210‐10‐03 Office Supplies 4,750.00 4,750.00 3,525.14 224.61 74.21 1,224.86 100‐5220‐10‐03 Office Equipment 1,100.00 1,100.00 1,733.71 157.61 (633.71) 100‐5230‐10‐03 Dues,Fees,& Subscriptions 8,398.00 8,398.00 7,529.74 592.99 89.66 868.26 100‐5240‐10‐03 Postage and Delivery 2,250.00 2,250.00 1,686.11 160.86 74.94 563.89 23Page 40Item 3.
100‐5280‐10‐03 Printing and Reproduction 9,350.00 9,350.00 1,225.00 13.10 8,125.00 100‐5290‐10‐03 Other Charges and Services 900.00 900.00 712.53 79.17 187.47 Subtotal object ‐ 05 26,748.00 26,748.00 16,412.23 978.46 61.36 10,335.77 100‐5330‐10‐03 Copier Expense 1,500.00 1,500.00 1,210.30 80.69 289.70 Subtotal object ‐ 05 1,500.00 1,500.00 1,210.30 80.69 289.70 100‐5400‐10‐03 Uniform Expense 495.00 495.00 510.42 103.12 (15.42) 100‐5410‐10‐03 Professional Services 4,000.00 4,000.00 3,103.30 77.58 896.70 100‐5412‐10‐03 Audit Fees 47,500.00 47,500.00 45,125.00 95.00 2,375.00 100‐5414‐10‐03 Appraisal/Tax Fees 173,300.00 173,300.00 167,201.95 34,462.25 5,950.65 96.48 147.40 100‐5418‐10‐03 IT Fees 52,479.00 52,479.00 42,902.19 81.75 9,576.81 100‐5419‐10‐03 IT Licenses 10,000.00 10,000.00 9,000.00 90.00 1,000.00 100‐5430‐10‐03 Legal Fees 8,000.00 8,000.00 5,457.70 323.00 68.22 2,542.30 100‐5435‐10‐03 Legal Notices/Filings 200.00 200.00 70.00 35.00 130.00 Subtotal object ‐ 05 295,974.00 295,974.00 273,370.56 34,785.25 5,950.65 92.36 16,652.79 100‐5526‐10‐03 Data Network 192.07 89.41 ‐ (192.07) 100‐5530‐10‐03 Travel 12,580.00 12,580.00 1,639.47 13.03 10,940.53 100‐5533‐10‐03 Mileage Expense 3,360.00 3,360.00 304.44 9.06 3,055.56 100‐5536‐10‐03 Training/Seminars 9,829.00 9,829.00 3,241.61 135.00 32.98 6,587.39 Subtotal object ‐ 05 25,769.00 25,769.00 5,377.59 224.41 20.87 20,391.41 Program number: 3 FINANCE 1,131,481.00 7,790.54 1,139,271.54 952,272.71 92,805.21 5,950.65 83.59 181,048.18 100‐5110‐10‐04 Salaries & Wages 285,456.00 15,837.53 301,293.53 244,301.51 17,788.50 81.08 56,992.02 100‐5140‐10‐04 Salaries ‐ Longevity Pay 445.00 445.00 435.00 97.75 10.00 100‐5143‐10‐04 Cell Phone Allowance 1,020.00 1,020.00 680.00 85.00 66.67 340.00 100‐5145‐10‐04 Social Security Expense 17,790.00 17,790.00 14,929.35 1,063.87 83.92 2,860.65 100‐5150‐10‐04 Medicare Expense 4,161.00 4,161.00 3,492.83 248.80 83.94 668.17 100‐5155‐10‐04 SUTA Expense 810.00 810.00 735.32 1.57 90.78 74.68 100‐5160‐10‐04 Health Insurance 13,955.00 13,955.00 15,586.94 1,325.30 111.69 (1,631.94) 100‐5165‐10‐04 Dental Insurance 857.00 857.00 809.26 76.22 94.43 47.74 100‐5170‐10‐04 Life Insurance/AD&D 308.00 308.00 285.66 10.88 92.75 22.34 100‐5175‐10‐04 Liability (TML)/Workers' Comp 546.00 546.00 692.46 48.14 126.82 (146.46) 100‐5180‐10‐04 TMRS Expense 38,878.00 38,878.00 28,386.33 2,413.88 73.01 10,491.67 100‐5185‐10‐04 Long/Short Term Disability 464.00 464.00 285.92 29.02 61.62 178.08 100‐5186‐10‐04 WELLE‐Wellness Prog Reimb Empl 1,200.00 1,200.00 587.40 39.16 48.95 612.60 100‐5190‐10‐04 Contract Labor 712.50 ‐ (712.50) 100‐5191‐10‐04 Hiring Cost 20,000.00 20,000.00 18,258.45 1,746.70 91.29 1,741.55 Subtotal object ‐ 05 385,890.00 15,837.53 401,727.53 330,178.93 24,877.04 82.19 71,548.60 100‐5210‐10‐04 Office Supplies 1,400.00 1,400.00 1,189.56 196.51 84.97 210.44 100‐5220‐10‐04 Office Equipment 1,500.00 1,500.00 326.17 21.75 1,173.83 100‐5230‐10‐04 Dues,Fees,& Subscriptions 3,500.00 3,500.00 2,060.17 414.38 58.86 1,439.83 100‐5240‐10‐04 Postage and Delivery 150.00 150.00 336.75 0.50 224.50 (186.75) 100‐5280‐10‐04 Printing and Reproduction 500.00 500.00 159.28 31.86 340.72 Subtotal object ‐ 05 7,050.00 7,050.00 4,071.93 611.39 57.76 2,978.07 100‐5330‐10‐04 Copier Expense 2,000.00 2,000.00 955.96 47.80 1,044.04 Subtotal object ‐ 05 2,000.00 2,000.00 955.96 47.80 1,044.04 100‐5410‐10‐04 Professional Services 35,000.00 35,000.00 3,610.00 3,602.50 10.31 27,787.50 100‐5419‐10‐04 IT Licenses 400.00 400.00 ‐ 400.00 100‐5430‐10‐04 Legal Fees 10,000.00 10,000.00 15,366.15 228.00 153.66 (5,366.15) 100‐5435‐10‐04 Legal Notices/Filings 150.00 150.00 66.00 44.00 84.00 100‐5480‐10‐04 Contracted Services 3,000.00 3,000.00 ‐ 3,000.00 Subtotal object ‐ 05 48,550.00 48,550.00 19,042.15 228.00 3,602.50 39.22 25,905.35 100‐5526‐10‐04 Data Network 480.00 480.00 341.91 37.99 71.23 138.09 100‐5530‐10‐04 Travel 5,500.00 5,500.00 ‐ 5,500.00 100‐5533‐10‐04 Mileage Expense 500.00 500.00 ‐ 500.00 100‐5536‐10‐04 Training/Seminars 18,000.00 18,000.00 8,072.12 1,100.00 44.85 8,827.88 Subtotal object ‐ 05 24,480.00 24,480.00 8,414.03 37.99 1,100.00 34.37 14,965.97 100‐5600‐10‐04 Special Events 10,000.00 10,000.00 5,949.85 300.00 59.50 4,050.15 24Page 41Item 3.
Subtotal object ‐ 05 10,000.00 10,000.00 5,949.85 300.00 59.50 4,050.15 100‐7145‐10‐04 Transfer to VERF 1,112.00 1,112.00 1,019.37 92.67 91.67 92.63 Subtotal object ‐ 07 1,112.00 1,112.00 1,019.37 92.67 91.67 92.63 Program number: 4 HUMAN RESOURCES 479,082.00 15,837.53 494,919.53 369,632.22 26,147.09 4,702.50 74.69 120,584.81 100‐5110‐10‐05 Salaries & Wages 254,763.00 4,353.43 259,116.43 239,214.80 20,215.82 92.32 19,901.63 100‐5115‐10‐05 Salaries ‐ Overtime 2,960.00 2,960.00 1,483.75 414.58 50.13 1,476.25 100‐5126‐10‐05 SALARIES‐VACATION BUY‐OUT 1,318.00 1,318.00 2,823.20 214.20 (1,505.20) 100‐5140‐10‐05 Salaries ‐ Longevity Pay 470.00 470.00 430.00 91.49 40.00 100‐5143‐10‐05 Cell Phone Allowance 4,500.00 4,500.00 4,125.00 375.00 91.67 375.00 100‐5145‐10‐05 Social Security Expense 16,369.00 16,369.00 13,753.38 1,148.16 84.02 2,615.62 100‐5150‐10‐05 Medicare Expense 3,829.00 3,829.00 3,216.52 268.52 84.00 612.48 100‐5155‐10‐05 SUTA Expense 486.00 486.00 432.00 88.89 54.00 100‐5160‐10‐05 Health Insurance 34,464.00 34,464.00 36,848.56 3,008.96 106.92 (2,384.56) 100‐5165‐10‐05 Dental Insurance 1,409.00 1,409.00 1,262.20 114.74 89.58 146.80 100‐5170‐10‐05 Life Insurance/AD&D 324.00 324.00 369.60 33.60 114.07 (45.60) 100‐5175‐10‐05 Liability (TML)/Workers' Comp 496.00 496.00 609.58 55.61 122.90 (113.58) 100‐5180‐10‐05 TMRS Expense 35,774.00 35,774.00 33,186.04 2,806.89 92.77 2,587.96 100‐5185‐10‐05 Long/Short Term Disability 485.00 485.00 416.19 38.40 85.81 68.81 100‐5186‐10‐05 WELLE‐Wellness Prog Reimb Empl 1,200.00 1,200.00 1,100.00 100.00 91.67 100.00 Subtotal object ‐ 05 358,847.00 4,353.43 363,200.43 339,270.82 28,580.28 93.41 23,929.61 100‐5210‐10‐05 Office Supplies 600.00 600.00 61.55 10.26 538.45 100‐5212‐10‐05 Building Supplies 600.00 600.00 ‐ 600.00 100‐5220‐10‐05 Office Equipment 710.00 710.00 694.33 304.87 97.79 15.67 100‐5225‐10‐05 Computer Hardware 60,125.00 60,125.00 49,665.71 625.00 82.60 10,459.29 100‐5230‐10‐05 Dues,Fees,& Subscriptions 575.00 575.00 507.17 88.20 67.83 100‐5240‐10‐05 Postage and Delivery 125.00 125.00 41.71 33.37 83.29 100‐5280‐10‐05 Printing and Reproduction 100.00 100.00 ‐ 100.00 100‐5290‐10‐05 Other Charges and Services 360.00 360.00 526.52 146.26 (166.52) Subtotal object ‐ 05 63,195.00 63,195.00 51,496.99 929.87 81.49 11,698.01 100‐5330‐10‐05 Copier Expense 57,500.00 57,500.00 43,238.17 3,134.71 1,458.57 75.20 12,803.26 Subtotal object ‐ 05 57,500.00 57,500.00 43,238.17 3,134.71 1,458.57 75.20 12,803.26 100‐5400‐10‐05 Uniform Expense 800.00 800.00 ‐ 800.00 100‐5410‐10‐05 Professional Services 975.00 ‐ (975.00) 100‐5418‐10‐05 IT Fees 55,519.00 55,519.00 47,606.76 10,335.00 1,050.00 85.75 6,862.24 100‐5419‐10‐05 IT Licenses 169,026.00 169,026.00 111,914.95 26,250.01 427.20 66.21 56,683.85 100‐5430‐10‐05 Legal Fees 750.00 750.00 1,311.01 171.00 174.80 (561.01) 100‐5435‐10‐05 Legal Notices/Filings 278.00 ‐ (278.00) 100‐5480‐10‐05 Contracted Services 21,388.00 16,000.00 37,388.00 42,483.44 329.00 6,094.26 113.63 (11,189.70) Subtotal object ‐ 05 247,483.00 16,000.00 263,483.00 204,569.16 37,085.01 7,571.46 77.64 51,342.38 100‐5520‐10‐05 Telephones 35,990.00 35,990.00 28,450.11 7,688.61 79.05 7,539.89 100‐5526‐10‐05 Data Network 53,870.00 53,870.00 13,570.45 1,332.16 25.19 40,299.55 100‐5530‐10‐05 Travel 6,600.00 6,600.00 933.20 14.14 5,666.80 100‐5533‐10‐05 Mileage Expense 900.00 900.00 247.08 27.45 652.92 100‐5536‐10‐05 Training/Seminars 7,400.00 7,400.00 5,018.00 (499.00) 67.81 2,382.00 Subtotal object ‐ 05 104,760.00 104,760.00 48,218.84 8,521.77 46.03 56,541.16 100‐5620‐10‐05 Tools & Equipment 250.00 250.00 45.66 18.26 204.34 100‐5630‐10‐05 Safety Equipment 150.00 150.00 ‐ 150.00 Subtotal object ‐ 05 400.00 400.00 45.66 11.42 354.34 100‐6125‐10‐05 Capital Expense‐Technology 186,961.00 (16,000.00) 170,961.00 143,283.79 15,030.00 83.81 12,647.21 Subtotal object ‐ 06 186,961.00 (16,000.00) 170,961.00 143,283.79 15,030.00 83.81 12,647.21 100‐7145‐10‐05 Transfer to VERF 35,296.00 35,296.00 32,354.63 2,941.33 91.67 2,941.37 Subtotal object ‐ 07 35,296.00 35,296.00 32,354.63 2,941.33 91.67 2,941.37 Program number: 5 INFORMATION TECHNOLOGY 1,054,442.00 4,353.43 1,058,795.43 862,478.06 81,192.97 24,060.03 81.46 172,257.34 100‐5110‐10‐07 Salaries & Wages 195,125.00 8,502.10 203,627.10 203,177.14 17,209.57 99.78 449.96 100‐5115‐10‐07 Salaries ‐ Overtime 270.00 270.00 72.87 26.99 197.13 100‐5126‐10‐07 Salaries‐Vacation Buy‐Out 3,627.00 3,627.00 3,846.72 106.06 (219.72) 25Page 42Item 3.
100‐5140‐10‐07 Salaries ‐ Longevity Pay 745.00 745.00 370.00 49.66 375.00 100‐5143‐10‐07 Cell Phone Allowance 300.00 60.00 ‐ (300.00) 100‐5145‐10‐07 Social Security Expense 12,386.00 12,386.00 12,114.42 1,020.70 97.81 271.58 100‐5150‐10‐07 Medicare Expense 2,897.00 2,897.00 2,833.22 238.72 97.80 63.78 100‐5155‐10‐07 SUTA Expense 648.00 648.00 579.65 89.45 68.35 100‐5160‐10‐07 Health Insurance 30,069.00 30,069.00 24,047.24 1,972.50 79.97 6,021.76 100‐5165‐10‐07 Dental Insurance 1,339.00 1,339.00 1,232.84 111.76 92.07 106.16 100‐5170‐10‐07 Life Insurance/AD&D 338.00 338.00 309.54 28.14 91.58 28.46 100‐5175‐10‐07 Liability (TML)/Workers' Comp 793.00 793.00 1,351.51 126.01 170.43 (558.51) 100‐5180‐10‐07 TMRS Expense 27,069.00 27,069.00 28,170.82 2,336.95 104.07 (1,101.82) 100‐5185‐10‐07 Long/Short Term Disability 323.00 323.00 262.98 26.26 81.42 60.02 100‐5186‐10‐07 WELLE‐Wellness Prog Reimb Empl 1,200.00 1,200.00 550.00 50.00 45.83 650.00 Subtotal object ‐ 05 276,829.00 8,502.10 285,331.10 279,218.95 23,180.61 97.86 6,112.15 100‐5210‐10‐07 Office Supplies 2,275.00 2,275.00 2,483.56 639.11 109.17 (208.56) 100‐5230‐10‐07 Dues,Fees,& Subscriptions 415.00 415.00 306.76 73.92 108.24 100‐5240‐10‐07 Postage and Delivery 3,800.00 3,800.00 2,202.40 217.40 57.96 1,597.60 100‐5250‐10‐07 Publications 100.00 100.00 67.30 67.30 32.70 100‐5280‐10‐07 Printing and Reproduction 1,700.00 1,700.00 1,320.31 366.19 77.67 379.69 100‐5290‐10‐07 Other Charges and Services 350.00 350.00 275.36 78.67 74.64 Subtotal object ‐ 05 8,640.00 8,640.00 6,655.69 1,222.70 77.03 1,984.31 100‐5310‐10‐07 Rental Expense 2,701.00 2,701.00 1,434.30 53.10 1,266.70 100‐5330‐10‐07 Copier Expense 1,850.00 1,850.00 708.64 38.31 1,141.36 100‐5350‐10‐07 VEHICLE EXPENSE 500.00 500.00 471.14 94.23 28.86 100‐5352‐10‐07 FUEL 3,000.00 3,000.00 118.64 3.96 2,881.36 100‐5353‐10‐07 OIL/GREASE/INSPECTIONS 300.00 300.00 ‐ 300.00 Subtotal object ‐ 05 8,351.00 8,351.00 2,732.72 32.72 5,618.28 100‐5410‐10‐07 Professional Services 3,500.00 3,500.00 2,150.00 300.00 61.43 1,350.00 100‐5418‐10‐07 IT Fees 3,441.92 ‐ (3,441.92) 100‐5419‐10‐07 IT Licenses 7,400.00 7,400.00 922.68 12.47 6,477.32 100‐5420‐10‐07 Municipal Court/Judge Fees 39,400.00 39,400.00 32,000.00 3,200.00 9,600.00 81.22 (2,200.00) 100‐5425‐10‐07 State Fines Expense 3,000.00 3,000.00 3,654.86 98.78 121.83 (654.86) 100‐5430‐10‐07 Legal Fees 43,200.00 43,200.00 37,719.01 5,604.00 87.31 5,480.99 Subtotal object ‐ 05 96,500.00 96,500.00 79,888.47 9,202.78 9,600.00 82.79 7,011.53 100‐5530‐10‐07 Travel 900.00 900.00 473.96 52.66 426.04 100‐5533‐10‐07 Mileage Expense 800.00 800.00 ‐ 800.00 100‐5536‐10‐07 Training/Seminars 1,000.00 1,000.00 575.00 57.50 425.00 Subtotal object ‐ 05 2,700.00 2,700.00 1,048.96 38.85 1,651.04 100‐7145‐10‐07 Transfer to VERF 97.00 97.00 88.88 8.08 91.63 8.12 Subtotal object ‐ 07 97.00 97.00 88.88 8.08 91.63 8.12 Program number: 7 MUNICIPAL COURT 393,117.00 8,502.10 401,619.10 369,633.67 33,614.17 9,600.00 92.04 22,385.43 100‐5110‐10‐99 Salaries & Wages (205,272.00) (127,672.00) (332,944.00) ‐ (332,944.00) 100‐5176‐10‐99 TML Prop. & Liab. Insurance 206,000.00 206,000.00 228,101.37 110.73 (22,101.37) Subtotal object ‐ 05 728.00 (127,672.00) (126,944.00) 228,101.37 (355,045.37) 100‐5210‐10‐99 OFFICE SUPPLIES 1,000.00 1,000.00 1,255.68 125.57 (255.68) 100‐5230‐10‐99 DUES,FEES,& SUBSCRIPTIONS 1,300.00 1,300.00 1,499.00 115.31 (199.00) 100‐5280‐10‐99 Printing and Reproduction 12,000.00 12,000.00 1,999.71 762.21 16.66 10,000.29 Subtotal object ‐ 05 2,300.00 12,000.00 14,300.00 4,754.39 762.21 33.25 9,545.61 100‐5305‐10‐99 Chapt 380 Program Grant Exp 672,010.00 (222,000.00) 450,010.00 434,491.07 42,500.35 96.55 15,518.93 100‐5306‐10‐99 Developer Rollback Incentives 25,000.00 25,000.00 19,465.08 77.86 5,534.92 100‐5350‐10‐99 Vehicle Expense 19,000.00 (12,000.00) 7,000.00 1,093.74 56.24 15.63 5,906.26 100‐5352‐10‐99 Fuel 1,250.00 1,250.00 317.53 25.40 932.47 100‐5353‐10‐99 Oil/Grease/Inspections 50.00 50.00 ‐ 50.00 Subtotal object ‐ 05 717,310.00 (234,000.00) 483,310.00 455,367.42 42,556.59 94.22 27,942.58 100‐5410‐10‐99 Professional Services 71,500.00 22,000.00 93,500.00 62,387.15 3,475.00 22,227.43 66.72 8,885.42 100‐5415‐10‐99 Tuition Reimbursement 54,207.00 54,207.00 21,322.08 2,497.45 39.34 32,884.92 100‐5480‐10‐99 Contracted Services 86,000.00 86,000.00 42,000.00 37,900.00 48.84 6,100.00 26Page 43Item 3.
100‐5489‐10‐99 Developer Reimbursement 18,750.00 ‐ (18,750.00) Subtotal object ‐ 05 211,707.00 22,000.00 233,707.00 144,459.23 5,972.45 60,127.43 61.81 29,120.34 100‐5600‐10‐99 Special Events 10,000.00 10,000.00 8,272.59 82.73 1,727.41 Subtotal object ‐ 05 10,000.00 10,000.00 8,272.59 82.73 1,727.41 100‐5930‐10‐99 Damage Claims Expense 65,000.00 65,000.00 24,292.01 37.37 40,707.99 Subtotal object ‐ 05 65,000.00 65,000.00 24,292.01 37.37 40,707.99 100‐6610‐10‐99 Capital 200,000.00 (49,477.00) 150,523.00 116,609.48 77.47 33,913.52 Subtotal object ‐ 06 200,000.00 (49,477.00) 150,523.00 116,609.48 77.47 33,913.52 100‐7000‐10‐99 Contingency 50,000.00 (12,180.00) 37,820.00 8,948.00 9,587.50 23.66 19,284.50 Subtotal object ‐ 07 50,000.00 (12,180.00) 37,820.00 8,948.00 9,587.50 23.66 19,284.50 100‐7145‐10‐99 Transfer to VERF 3,731.00 3,731.00 3,420.12 310.92 91.67 310.88 Subtotal object ‐ 07 3,731.00 3,731.00 3,420.12 310.92 91.67 310.88 Program number: 99 NON‐DEPARTMENTAL 1,260,776.00 (389,329.00) 871,447.00 994,224.61 49,602.17 69,714.93 114.09 (192,492.54) Department number: 10 ADMINISTRATION 5,442,762.00 (303,472.60) 5,139,289.40 4,661,483.20 383,642.91 162,016.78 90.70 315,789.42 100‐5110‐20‐01 Salaries & Wages 2,127,340.00 71,677.52 2,199,017.52 1,773,830.56 168,026.22 80.67 425,186.96 100‐5115‐20‐01 Salaries ‐ Overtime 190,106.00 190,106.00 104,843.42 15,901.79 55.15 85,262.58 100‐5126‐20‐01 Salaries‐Vacation Buy‐Out 3,331.00 3,331.00 21,357.36 641.17 (18,026.36) 100‐5127‐20‐01 Salaries‐Certification Pay 21,420.00 21,420.00 22,803.50 1,599.17 106.46 (1,383.50) 100‐5140‐20‐01 Salaries ‐ Longevity Pay 4,665.00 4,665.00 4,430.00 94.96 235.00 100‐5143‐20‐01 Cell Phone Allowance 8,190.00 8,190.00 2,375.00 250.00 29.00 5,815.00 100‐5145‐20‐01 Social Security Expense 146,014.00 146,014.00 116,580.68 11,624.16 79.84 29,433.32 100‐5150‐20‐01 Medicare Expense 34,148.00 34,148.00 27,598.38 2,718.56 80.82 6,549.62 100‐5155‐20‐01 SUTA Expense 5,184.00 5,184.00 4,331.27 90.11 83.55 852.73 100‐5160‐20‐01 Health Insurance 252,439.00 252,439.00 150,060.69 15,437.52 59.44 102,378.31 100‐5165‐20‐01 Dental Insurance 10,489.00 10,489.00 7,869.32 890.88 75.03 2,619.68 100‐5170‐20‐01 Life Insurance/AD&D 9,580.00 9,580.00 7,489.94 831.52 78.18 2,090.06 100‐5175‐20‐01 Liability (TML)/Workers' Comp 46,799.00 46,799.00 44,705.67 4,722.53 95.53 2,093.33 100‐5180‐20‐01 TMRS Expense 319,110.00 319,110.00 263,962.84 26,134.80 82.72 55,147.16 100‐5185‐20‐01 Long/Short Term Disability 4,148.00 4,148.00 2,967.09 317.69 71.53 1,180.91 100‐5186‐20‐01 WELLE‐Wellness Prog Reimb Empl 6,600.00 6,600.00 3,826.90 417.48 57.98 2,773.10 100‐5191‐20‐01 Hiring Cost 55.00 (10.00) 45.00 44.00 97.78 1.00 100‐5192‐20‐01 Physical & Psychological 2,540.00 10.00 2,550.00 2,900.00 350.00 113.73 (350.00) Subtotal object ‐ 05 3,192,158.00 71,677.52 3,263,835.52 2,561,976.62 249,312.43 78.50 701,858.90 100‐5210‐20‐01 Office Supplies 12,800.00 (2,634.00) 10,166.00 7,102.47 1,206.81 69.87 3,063.53 100‐5214‐20‐01 Tactical Supplies 36,875.00 (848.00) 36,027.00 28,234.47 5,125.66 3,880.70 78.37 3,911.83 100‐5215‐20‐01 Ammunition 66,560.00 (13,743.00) 52,817.00 49,099.08 114.48 92.96 3,603.44 100‐5220‐20‐01 Office Equipment 794.00 794.00 3,039.28 2,245.46 382.78 (2,245.28) 100‐5230‐20‐01 Dues,Fees,& Subscriptions 7,950.00 7,950.00 7,182.69 751.50 90.35 767.31 100‐5240‐20‐01 Postage and Delivery 1,426.00 1,426.00 1,449.93 185.61 101.68 (23.93) 100‐5250‐20‐01 Publications 706.00 706.00 705.54 99.94 0.46 100‐5265‐20‐01 Promotional Expense 500.00 (500.00) ‐ 100‐5280‐20‐01 Printing and Reproduction 800.00 800.00 263.67 32.96 536.33 100‐5290‐20‐01 Other Charges and Services 1,634.00 1,634.00 1,634.23 100.01 (0.23) Subtotal object ‐ 05 126,911.00 (14,591.00) 112,320.00 98,711.36 9,515.04 3,995.18 87.88 9,613.46 100‐5310‐20‐01 Rental Expense 4,410.00 4,410.00 3,989.00 344.20 90.45 421.00 100‐5320‐20‐01 Repairs & Maintenance 800.00 800.00 536.18 67.02 263.82 100‐5330‐20‐01 Copier Expense 2,100.00 2,100.00 1,022.04 48.67 1,077.96 100‐5350‐20‐01 Vehicle Expense 86,956.00 13,743.00 100,699.00 64,142.32 1,287.09 10,500.00 63.70 26,056.68 100‐5352‐20‐01 Fuel 81,360.00 81,360.00 41,764.16 51.33 39,595.84 100‐5353‐20‐01 Oil/Grease/Inspections 5,100.00 5,100.00 ‐ 5,100.00 Subtotal object ‐ 05 180,726.00 13,743.00 194,469.00 111,453.70 1,631.29 10,500.00 57.31 72,515.30 100‐5400‐20‐01 Uniform Expense 68,722.00 68,722.00 27,795.91 7,234.26 3,440.45 40.45 37,485.64 100‐5410‐20‐01 Professional Services 17,660.00 11,702.00 29,362.00 29,362.10 100.00 (0.10) 100‐5418‐20‐01 IT Fees 16,590.00 (2,647.00) 13,943.00 ‐ 13,943.00 100‐5430‐20‐01 Legal Fees 14,400.00 12,000.00 26,400.00 25,837.95 3,167.90 97.87 562.05 100‐5480‐20‐01 Contracted Services 49,322.00 6,718.00 56,040.00 57,232.17 2,322.49 102.13 (1,192.17) 27Page 44Item 3.
Subtotal object ‐ 05 166,694.00 27,773.00 194,467.00 140,228.13 12,724.65 3,440.45 72.11 50,798.42 100‐5520‐20‐01 Telephones 4,000.00 4,000.00 2,407.13 60.18 1,592.87 100‐5523‐20‐01 Water/Sewer Charges 1,400.00 1,400.00 1,276.24 113.26 91.16 123.76 100‐5524‐20‐01 Gas 1,800.00 1,800.00 ‐ 1,800.00 100‐5525‐20‐01 Electricity 11,229.00 11,229.00 7,117.86 823.50 63.39 4,111.14 100‐5526‐20‐01 Data Network 7,425.00 2,647.00 10,072.00 10,072.28 1,061.68 100.00 (0.28) 100‐5530‐20‐01 Travel 4,000.00 4,000.00 2,990.49 270.00 74.76 1,009.51 100‐5533‐20‐01 Mileage Expense 1,000.00 1,000.00 268.13 26.81 731.87 100‐5536‐20‐01 Training/Seminars 52,600.00 52,600.00 25,791.18 4,064.00 49.03 26,808.82 Subtotal object ‐ 05 83,454.00 2,647.00 86,101.00 49,923.31 6,332.44 57.98 36,177.69 100‐5600‐20‐01 Special Events 5,000.00 (4,638.00) 362.00 361.22 99.79 0.78 100‐5620‐20‐01 TOOLS & EQUIPMENT 120,983.00 (12,633.00) 108,350.00 34,126.25 5,980.64 2,563.68 31.50 71,660.07 100‐5630‐20‐01 Safety Equipment 14,124.00 (13,149.00) 975.00 975.00 100.00 Subtotal object ‐ 05 140,107.00 (30,420.00) 109,687.00 35,462.47 5,980.64 2,563.68 32.33 71,660.85 100‐6140‐20‐01 Capital Expense‐Equipment 65,694.00 38,174.43 103,868.43 116,726.21 21,102.00 9,898.43 112.38 (22,756.21) 100‐6160‐20‐01 Capital Expense‐Vehicles 142,654.00 142,654.00 138,526.43 97.11 4,127.57 Subtotal object ‐ 06 208,348.00 38,174.43 246,522.43 255,252.64 21,102.00 9,898.43 103.54 (18,628.64) 100‐7145‐20‐01 Transfer to VERF 350,015.00 350,015.00 320,847.12 29,167.92 91.67 29,167.88 Subtotal object ‐ 07 350,015.00 350,015.00 320,847.12 29,167.92 91.67 29,167.88 Program number: 1 OPERATIONS 4,448,413.00 109,003.95 4,557,416.95 3,573,855.35 335,766.41 30,397.74 78.42 953,163.86 100‐5110‐20‐05 Salaries & Wages 534,637.00 25,540.98 560,177.98 493,407.91 42,617.46 88.08 66,770.07 100‐5115‐20‐05 Salaries ‐ Overtime 10,545.00 10,545.00 37,572.97 2,685.04 356.31 (27,027.97) 100‐5126‐20‐05 Salaries‐Vacation Buy‐Out 7,049.00 7,049.00 4,051.60 57.48 2,997.40 100‐5127‐20‐05 Salaries‐Certification Pay 10,800.00 10,800.00 12,094.00 1,135.34 111.98 (1,294.00) 100‐5140‐20‐05 Salaries ‐ Longevity Pay 1,905.00 1,905.00 1,295.00 67.98 610.00 100‐5145‐20‐05 Social Security Expense 35,064.00 35,064.00 33,103.97 2,787.88 94.41 1,960.03 100‐5150‐20‐05 Medicare Expense 8,200.00 8,200.00 7,742.07 652.02 94.42 457.93 100‐5155‐20‐05 SUTA Expense 1,782.00 1,782.00 1,614.80 90.62 167.20 100‐5160‐20‐05 Health Insurance 99,490.00 99,490.00 67,558.98 5,543.50 67.91 31,931.02 100‐5165‐20‐05 Dental Insurance 4,797.00 4,797.00 3,688.82 356.90 76.90 1,108.18 100‐5170‐20‐05 Life Insurance/AD&D 1,239.00 1,239.00 1,092.77 103.18 88.20 146.23 100‐5175‐20‐05 Liability (TML)/Workers' Comp 1,146.00 1,146.00 1,346.40 123.49 117.49 (200.40) 100‐5180‐20‐05 TMRS Expense 76,630.00 76,630.00 74,617.79 6,314.21 97.37 2,012.21 100‐5185‐20‐05 Long/Short Term Disability 1,017.00 1,017.00 818.03 77.81 80.44 198.97 100‐5186‐20‐05 WELLE‐Wellness Prog Reimb Empl 3,000.00 3,000.00 1,958.00 195.80 65.27 1,042.00 Subtotal object ‐ 05 797,301.00 25,540.98 822,841.98 741,963.11 62,592.63 90.17 80,878.87 100‐5210‐20‐05 Office Supplies 4,079.00 4,079.00 1,698.46 39.57 41.64 2,380.54 100‐5212‐20‐05 Building Supplies 1,500.00 1,500.00 1,000.92 668.68 66.73 499.08 100‐5220‐20‐05 Office Equipment 4,699.00 4,699.00 560.57 43.77 11.93 4,138.43 100‐5230‐20‐05 Dues,Fees,& Subscriptions 3,520.00 3,520.00 1,162.75 33.03 2,357.25 100‐5240‐20‐05 Postage and Delivery 18.00 ‐ (18.00) 100‐5250‐20‐05 Publications 300.00 300.00 127.92 42.64 172.08 Subtotal object ‐ 05 14,098.00 14,098.00 4,568.62 752.02 32.41 9,529.38 100‐5330‐20‐05 Copier Expense 600.00 600.00 656.42 109.40 (56.42) 100‐5340‐20‐05 Building Repairs 3,000.00 3,000.00 1,266.04 42.20 1,733.96 Subtotal object ‐ 05 3,600.00 3,600.00 1,922.46 53.40 1,677.54 100‐5400‐20‐05 Uniform Expense 1,600.00 1,600.00 635.74 39.73 964.26 100‐5419‐20‐05 IT Licenses 115,592.00 115,592.00 79,313.91 5,828.65 2,400.00 68.62 33,878.09 100‐5430‐20‐05 Legal Fees 247.00 ‐ (247.00) 100‐5480‐20‐05 Contracted Services 89,453.00 89,453.00 71,094.35 17,049.14 79.48 1,309.51 Subtotal object ‐ 05 206,645.00 206,645.00 151,291.00 5,828.65 19,449.14 73.21 35,904.86 100‐5520‐20‐05 Telephones 1,200.00 1,200.00 1,260.80 105.07 (60.80) 100‐5524‐20‐05 Gas 1,000.00 1,000.00 1,002.71 99.35 100.27 (2.71) 100‐5526‐20‐05 Data Network 267.00 267.00 ‐ 267.00 100‐5530‐20‐05 Travel 5,000.00 5,000.00 ‐ 5,000.00 100‐5536‐20‐05 Training/Seminars 7,683.00 7,683.00 3,846.90 178.00 50.07 3,836.10 28Page 45Item 3.
Subtotal object ‐ 05 15,150.00 15,150.00 6,110.41 277.35 40.33 9,039.59 100‐5600‐20‐05 Special Events 1,000.00 1,000.00 594.67 59.47 405.33 Subtotal object ‐ 05 1,000.00 1,000.00 594.67 59.47 405.33 100‐7145‐20‐05 Transfer to VERF 10,455.00 10,455.00 9,583.75 871.25 91.67 871.25 Subtotal object ‐ 07 10,455.00 10,455.00 9,583.75 871.25 91.67 871.25 Program number: 5 DISPATCH 1,048,249.00 25,540.98 1,073,789.98 916,034.02 70,321.90 19,449.14 85.31 138,306.82 Department number: 20 POLICE 5,496,662.00 134,544.93 5,631,206.93 4,489,889.37 406,088.31 49,846.88 79.73 1,091,470.68 100‐5110‐30‐01 Salaries & Wages 2,618,606.00 559,003.34 3,177,609.34 2,816,170.48 230,447.57 88.63 361,438.86 100‐5115‐30‐01 Salaries ‐ Overtime 449,699.00 86,400.00 536,099.00 480,544.36 28,730.64 89.64 55,554.64 100‐5116‐30‐01 Salaries ‐ FLSA Overtime 80,452.00 11,946.00 92,398.00 54,621.08 4,855.26 59.12 37,776.92 100‐5126‐30‐01 Salaries‐Vacation Buy‐Out 5,586.00 5,586.00 7,771.36 139.12 (2,185.36) 100‐5127‐30‐01 Salaries‐Certification Pay 55,260.00 9,000.00 64,260.00 43,058.33 3,766.28 67.01 21,201.67 100‐5140‐30‐01 Salaries ‐ Longevity Pay 12,315.00 12,315.00 12,185.00 98.94 130.00 100‐5143‐30‐01 Cell Phone Allowance 6,600.00 3,060.00 9,660.00 8,600.00 805.00 89.03 1,060.00 100‐5145‐30‐01 Social Security Expense 200,168.00 32,499.00 232,667.00 202,343.63 18,142.71 86.97 30,323.37 100‐5150‐30‐01 Medicare Expense 46,813.00 7,600.00 54,413.00 47,554.71 4,243.05 87.40 6,858.29 100‐5155‐30‐01 SUTA Expense 7,128.00 972.00 8,100.00 5,997.00 149.69 74.04 2,103.00 100‐5160‐30‐01 Health Insurance 280,234.00 58,680.00 338,914.00 325,194.48 27,839.34 95.95 13,719.52 100‐5165‐30‐01 Dental Insurance 12,361.00 2,520.00 14,881.00 13,334.42 1,246.34 89.61 1,546.58 100‐5170‐30‐01 Life Insurance/AD&D 10,354.00 945.00 11,299.00 11,209.88 1,050.34 99.21 89.12 100‐5171‐30‐01 Life Insurance‐Supplemental 6,241.00 ‐ (6,241.00) 100‐5175‐30‐01 Liability (TML)/Workers' Comp 38,100.00 18,288.00 56,388.00 76,559.12 7,628.65 135.77 (20,171.12) 100‐5180‐30‐01 TMRS Expense 412,445.00 71,026.00 483,471.00 456,340.32 40,633.73 94.39 27,130.68 100‐5185‐30‐01 Long/Short Term Disability 4,625.00 889.00 5,514.00 4,560.37 414.85 82.71 953.63 100‐5186‐30‐01 WELLE‐Wellness Prog Reimb Empl 6,000.00 3,600.00 9,600.00 8,123.38 845.80 84.62 1,476.62 100‐5191‐30‐01 Hiring Cost 1,000.00 1,000.00 ‐ 1,000.00 100‐5194‐30‐01 FD Annual Phy & Screening 23,600.00 942.00 24,542.00 24,255.00 98.83 287.00 Subtotal object ‐ 05 4,271,346.00 867,370.34 5,138,716.34 4,604,663.92 370,799.25 89.61 534,052.42 100‐5210‐30‐01 Office Supplies 7,500.00 300.00 7,800.00 4,687.30 100.12 60.09 3,112.70 100‐5212‐30‐01 Building Supplies 12,000.00 12,000.00 9,678.67 819.94 80.66 2,321.33 100‐5220‐30‐01 Office Equipment 5,000.00 6,870.00 11,870.00 10,839.01 2,468.43 91.31 1,030.99 100‐5230‐30‐01 Dues,Fees,& Subscriptions 12,050.00 1,200.00 13,250.00 10,384.13 1,448.71 78.37 2,865.87 100‐5240‐30‐01 Postage and Delivery 397.00 397.00 300.62 11.51 75.72 96.38 100‐5250‐30‐01 Publications 700.00 700.00 ‐ 700.00 100‐5280‐30‐01 Printing and Reproduction 1,900.00 1,900.00 1,170.94 61.63 729.06 100‐5290‐30‐01 Other Charges and Services 4,500.00 4,500.00 3,740.94 70.35 83.13 759.06 Subtotal object ‐ 05 44,047.00 8,370.00 52,417.00 40,801.61 4,919.06 77.84 11,615.39 100‐5320‐30‐01 Repairs & Maintenance 20,000.00 20,000.00 18,335.04 5,608.88 91.68 1,664.96 100‐5330‐30‐01 Copier Expense 3,613.00 3,613.00 2,381.05 65.90 1,231.95 100‐5335‐30‐01 Radio/Video Equip. and Repairs 6,760.00 6,760.00 1,047.30 15.49 5,712.70 100‐5340‐30‐01 Building Repairs 45,000.00 256,977.00 301,977.00 88,355.07 4,094.43 196,660.19 29.26 16,961.74 100‐5350‐30‐01 Vehicle Expense 78,000.00 78,000.00 59,056.15 21,046.22 75.71 18,943.85 100‐5352‐30‐01 Fuel 33,000.00 33,000.00 26,235.18 253.92 79.50 6,764.82 100‐5353‐30‐01 Oil/Grease/Inspections 950.00 950.00 91.00 9.58 859.00 Subtotal object ‐ 05 187,323.00 256,977.00 444,300.00 195,500.79 31,003.45 196,660.19 44.00 52,139.02 100‐5400‐30‐01 Uniform Expense 41,500.00 9,000.00 50,500.00 49,342.22 75.00 97.71 1,157.78 100‐5419‐30‐01 IT Licenses 13,420.00 13,420.00 13,420.49 100.00 (0.49) 100‐5430‐30‐01 Legal Fees 4,000.00 4,000.00 399.00 19.00 9.98 3,601.00 100‐5440‐30‐01 EMS 121,000.00 121,000.00 113,224.03 5,738.33 7,905.17 93.57 (129.20) 100‐5445‐30‐01 Emergency Management 15,000.00 15,000.00 8,566.29 162.81 57.11 6,433.71 100‐5480‐30‐01 Contracted Services 20,750.00 20,750.00 19,283.25 1,277.77 2,500.00 92.93 (1,033.25) Subtotal object ‐ 05 215,670.00 9,000.00 224,670.00 204,235.28 7,272.91 10,405.17 90.91 10,029.55 100‐5520‐30‐01 Telephones 2,292.00 2,292.00 1,740.39 75.93 551.61 100‐5523‐30‐01 Water/Sewer Charges 15,800.00 15,800.00 16,539.03 1,897.15 104.68 (739.03) 100‐5524‐30‐01 Gas 4,500.00 4,500.00 2,514.63 112.90 55.88 1,985.37 100‐5525‐30‐01 Electricity 41,500.00 41,500.00 27,898.59 3,847.69 67.23 13,601.41 29Page 46Item 3.
100‐5526‐30‐01 Data Network 9,820.00 9,820.00 10,899.55 1,551.14 110.99 (1,079.55) 100‐5530‐30‐01 Travel 9,778.00 1,800.00 11,578.00 3,322.13 160.00 28.69 8,255.87 100‐5533‐30‐01 Mileage Expense 1,500.00 1,500.00 ‐ 1,500.00 100‐5536‐30‐01 Training/Seminars 40,000.00 4,770.00 44,770.00 32,167.47 4,330.95 4,000.00 71.85 8,602.53 Subtotal object ‐ 05 125,190.00 6,570.00 131,760.00 95,081.79 11,899.83 4,000.00 72.16 32,678.21 100‐5610‐30‐01 Fire Fighting Equipment 20,000.00 20,000.00 6,696.39 (3,970.80) 33.48 13,303.61 100‐5620‐30‐01 Tools & Equipment 1,000.00 1,000.00 905.95 556.60 90.60 94.05 100‐5630‐30‐01 Safety Equipment 50,000.00 23,100.00 73,100.00 63,785.49 972.53 1,964.82 87.26 7,349.69 Subtotal object ‐ 05 71,000.00 23,100.00 94,100.00 71,387.83 (2,441.67) 1,964.82 75.86 20,747.35 100‐6140‐30‐01 Capital Expense‐Equipment 31,500.00 31,500.00 (739.36) 27,895.00 ‐ 3,605.00 100‐6140‐30‐01‐1931‐EQ Replacement Fire Engine Equipm 150,000.00 150,000.00 148,797.96 4,697.07 0.20 99.20 1,201.84 100‐6160‐30‐01 Capital Expense‐Vehicles 23,100.00 23,100.00 22,507.58 97.44 592.42 Subtotal object ‐ 06 204,600.00 204,600.00 171,305.54 3,957.71 27,895.20 83.73 5,399.26 100‐7145‐30‐01 Transfer to VERF 833,359.00 108,969.00 942,328.00 863,800.63 78,527.33 91.67 78,527.37 Subtotal object ‐ 07 833,359.00 108,969.00 942,328.00 863,800.63 78,527.33 91.67 78,527.37 Program number: 1 OPERATIONS 5,952,535.00 1,280,356.34 7,232,891.34 6,246,777.39 505,937.87 240,925.38 86.37 745,188.57 100‐5110‐30‐05 Salaries & Wages 252,792.00 12,521.36 265,313.36 249,650.78 20,220.80 94.10 15,662.58 100‐5115‐30‐05 Salaries ‐ Overtime 24,404.00 24,404.00 20,170.97 1,125.67 82.65 4,233.03 100‐5126‐30‐05 Salaries‐Vacation Buy‐Out 1,230.00 1,230.00 1,266.80 102.99 (36.80) 100‐5140‐30‐05 Salaries ‐ Longevity Pay 1,160.00 1,160.00 1,105.00 95.26 55.00 100‐5143‐30‐05 Cell Phone Allowance 3,060.00 3,060.00 2,805.00 255.00 91.67 255.00 100‐5145‐30‐05 Social Security Expense 17,525.00 17,525.00 15,894.00 1,232.90 90.69 1,631.00 100‐5150‐30‐05 Medicare Expense 4,099.00 4,099.00 3,717.14 288.33 90.68 381.86 100‐5155‐30‐05 SUTA Expense 486.00 486.00 432.00 88.89 54.00 100‐5160‐30‐05 Health Insurance 23,500.00 23,500.00 21,541.08 1,958.28 91.66 1,958.92 100‐5165‐30‐05 Dental Insurance 1,324.00 1,324.00 1,212.92 110.26 91.61 111.08 100‐5170‐30‐05 Life Insurance/AD&D 1,126.00 1,126.00 1,031.58 93.78 91.62 94.42 100‐5175‐30‐05 Liability (TML)/Workers' Comp 3,822.00 3,822.00 5,175.25 474.46 135.41 (1,353.25) 100‐5180‐30‐05 TMRS Expense 38,299.00 38,299.00 36,861.99 2,890.31 96.25 1,437.01 100‐5185‐30‐05 Long/Short Term Disability 481.00 481.00 427.92 38.42 88.97 53.08 100‐5194‐30‐05 FD Annual Phy & Screening 1,678.00 1,678.00 1,690.00 100.72 (12.00) Subtotal object ‐ 05 374,986.00 12,521.36 387,507.36 362,982.43 28,688.21 93.67 24,524.93 100‐5210‐30‐05 Office Supplies 350.00 350.00 180.75 40.74 51.64 169.25 100‐5215‐30‐05 Ammunition 1,250.00 1,250.00 2,070.18 165.61 (820.18) 100‐5220‐30‐05 Office Equipment 1,000.00 1,000.00 219.98 22.00 780.02 100‐5230‐30‐05 Dues,Fees,& Subscriptions 750.00 750.00 959.34 127.91 (209.34) 100‐5240‐30‐05 Postage and Delivery 100.00 100.00 14.60 14.60 85.40 100‐5250‐30‐05 Publications 2,545.00 2,545.00 1,345.50 52.87 1,199.50 100‐5280‐30‐05 Printing and Reproduction 500.00 500.00 266.19 53.24 233.81 100‐5295‐30‐05 Public Education/Fire Prevent 7,500.00 7,500.00 2,819.68 37.60 4,680.32 Subtotal object ‐ 05 13,995.00 13,995.00 7,876.22 40.74 56.28 6,118.78 100‐5335‐30‐05 Radio/Video Equip. and Repairs 500.00 500.00 ‐ 500.00 100‐5350‐30‐05 Vehicle Expense 3,000.00 3,000.00 2,143.51 71.45 856.49 100‐5352‐30‐05 Fuel 3,000.00 3,000.00 1,434.77 47.83 1,565.23 100‐5353‐30‐05 Oil/Grease/Inspections 500.00 500.00 ‐ 500.00 Subtotal object ‐ 05 7,000.00 7,000.00 3,578.28 51.12 3,421.72 100‐5400‐30‐05 Uniform Expense 3,300.00 3,300.00 1,166.06 35.34 2,133.94 100‐5430‐30‐05 Legal Fees 2,500.00 2,500.00 228.00 9.12 2,272.00 100‐5480‐30‐05 Contracted Services 2,650.00 2,650.00 2,650.00 100.00 Subtotal object ‐ 05 8,450.00 8,450.00 4,044.06 47.86 4,405.94 100‐5526‐30‐05 Data Network 1,845.00 1,845.00 1,025.73 113.97 55.60 819.27 100‐5530‐30‐05 Travel 3,674.00 3,674.00 3,283.50 89.37 390.50 100‐5536‐30‐05 Training/Seminars 5,700.00 5,700.00 5,067.03 198.00 88.90 632.97 Subtotal object ‐ 05 11,219.00 11,219.00 9,376.26 311.97 83.58 1,842.74 100‐5620‐30‐05 Tools & Equipment 500.00 500.00 398.81 231.94 79.76 101.19 100‐5630‐30‐05 Safety Equipment 4,000.00 4,000.00 595.53 285.58 14.89 3,118.89 30Page 47Item 3.
100‐5640‐30‐05 Signs & Hardware 350.00 350.00 ‐ 350.00 Subtotal object ‐ 05 4,850.00 4,850.00 994.34 231.94 285.58 20.50 3,570.08 100‐7145‐30‐05 Transfer to VERF 11,076.00 11,076.00 10,153.00 923.00 91.67 923.00 Subtotal object ‐ 07 11,076.00 11,076.00 10,153.00 923.00 91.67 923.00 Program number: 5 MARSHAL 431,576.00 12,521.36 444,097.36 399,004.59 30,195.86 285.58 89.85 44,807.19 Department number: 30 FIRE 6,384,111.00 1,292,877.70 7,676,988.70 6,645,781.98 536,133.73 241,210.96 86.57 789,995.76 100‐5110‐40‐01 Salaries & Wages 987,210.00 4,737.09 991,947.09 875,002.50 71,172.10 88.21 116,944.59 100‐5115‐40‐01 Salaries ‐ Overtime 8,500.00 8,500.00 632.49 7.44 7,867.51 100‐5126‐40‐01 Salaries‐Vacation Buy‐Out 6,705.00 6,705.00 7,945.84 118.51 (1,240.84) 100‐5140‐40‐01 Salaries ‐ Longevity Pay 3,360.00 3,360.00 3,545.00 105.51 (185.00) 100‐5143‐40‐01 Cell Phone Allowance 4,860.00 4,860.00 4,015.00 325.00 82.61 845.00 100‐5145‐40‐01 Social Security Expense 62,598.00 62,598.00 51,793.31 4,136.21 82.74 10,804.69 100‐5150‐40‐01 Medicare Expense 14,640.00 14,640.00 12,112.95 967.37 82.74 2,527.05 100‐5155‐40‐01 SUTA Expense 2,592.00 2,592.00 2,311.46 89.18 280.54 100‐5160‐40‐01 Health Insurance 120,721.00 120,721.00 95,751.45 8,486.69 79.32 24,969.55 100‐5165‐40‐01 Dental Insurance 6,520.00 6,520.00 5,636.97 484.32 86.46 883.03 100‐5170‐40‐01 Life Insurance/AD&D 1,801.00 1,801.00 1,580.53 140.70 87.76 220.47 100‐5175‐40‐01 Liability (TML)/Workers' Comp 3,352.00 3,352.00 4,282.54 373.94 127.76 (930.54) 100‐5180‐40‐01 TMRS Expense 136,806.00 136,806.00 120,400.18 9,672.18 88.01 16,405.82 100‐5185‐40‐01 Long/Short Term Disability 1,876.00 1,876.00 1,521.09 134.35 81.08 354.91 100‐5186‐40‐01 WELLE‐Wellness Prog Reimb Empl 1,800.00 1,800.00 1,920.60 262.06 106.70 (120.60) Subtotal object ‐ 05 1,363,341.00 4,737.09 1,368,078.09 1,188,451.91 96,154.92 86.87 179,626.18 100‐5210‐40‐01 Office Supplies 5,000.00 5,000.00 4,248.97 809.99 84.98 751.03 100‐5220‐40‐01 Office Equipment 3,000.00 3,000.00 2,999.80 99.99 0.20 100‐5230‐40‐01 Dues,Fees,& Subscriptions 2,000.00 2,000.00 1,895.24 145.00 94.76 104.76 100‐5240‐40‐01 Postage and Delivery 25.00 25.00 1.00 0.50 4.00 24.00 100‐5250‐40‐01 Publications 3,000.00 3,000.00 2,825.49 713.08 94.18 174.51 100‐5280‐40‐01 Printing and Reproduction 1,000.00 1,000.00 216.69 21.67 783.31 100‐5290‐40‐01 Other Charges and Services 500.00 500.00 33.42 6.68 466.58 Subtotal object ‐ 05 14,525.00 14,525.00 12,220.61 1,668.57 84.14 2,304.39 100‐5330‐40‐01 Copier Expense 2,500.00 2,500.00 2,017.52 80.70 482.48 100‐5350‐40‐01 Vehicle Expense 10,555.00 10,555.00 5,025.24 26.25 47.61 5,529.76 100‐5352‐40‐01 Fuel 6,500.00 6,500.00 4,140.52 63.70 2,359.48 Subtotal object ‐ 05 19,555.00 19,555.00 11,183.28 26.25 57.19 8,371.72 100‐5400‐40‐01 Uniform Expense 3,000.00 3,000.00 2,211.99 73.73 788.01 100‐5410‐40‐01 Professional Services 533,397.00 533,397.00 34,664.76 498,732.24 6.50 100‐5418‐40‐01 IT Fees 54,410.00 54,410.00 54,102.86 99.44 307.14 100‐5430‐40‐01 Legal Fees 2,000.00 2,000.00 38.00 1.90 1,962.00 100‐5465‐40‐01 Public Relations 500.00 500.00 ‐ 500.00 100‐5475‐40‐01 Credit Card Fees 15,000.00 15,000.00 28,458.76 4,976.06 189.73 (13,458.76) 100‐5480‐40‐01 Contracted Services 3,000.00 3,000.00 ‐ 3,000.00 Subtotal object ‐ 05 611,307.00 611,307.00 119,476.37 4,976.06 498,732.24 19.54 (6,901.61) 100‐5526‐40‐01 Data Network 4,320.00 4,320.00 3,675.56 393.24 85.08 644.44 100‐5530‐40‐01 Travel 5,157.00 5,157.00 ‐ 5,157.00 100‐5533‐40‐01 Mileage Expense 1,283.00 1,283.00 173.06 13.49 1,109.94 100‐5536‐40‐01 Training/Seminars 16,340.00 16,340.00 8,491.39 1,778.00 51.97 7,848.61 Subtotal object ‐ 05 27,100.00 27,100.00 12,340.01 2,171.24 45.54 14,759.99 100‐5620‐40‐01 Tools & Equipment 1,450.00 1,450.00 1,337.04 0.52 92.21 112.96 100‐5630‐40‐01 Safety Equipment 1,750.00 1,750.00 1,519.87 86.85 230.13 Subtotal object ‐ 05 3,200.00 3,200.00 2,856.91 0.52 89.28 343.09 100‐7145‐40‐01 Transfer to VERF 31,026.00 31,026.00 28,440.50 2,585.50 91.67 2,585.50 Subtotal object ‐ 07 31,026.00 31,026.00 28,440.50 2,585.50 91.67 2,585.50 Program number: 1 INSPECTIONS 2,070,054.00 4,737.09 2,074,791.09 1,374,969.59 107,583.06 498,732.24 66.27 201,089.26 100‐5110‐40‐02 Salaries & Wages 163,433.00 4,440.05 167,873.05 127,673.42 9,814.40 76.05 40,199.63 100‐5115‐40‐02 Salaries ‐ Overtime 760.00 760.00 516.49 67.96 243.51 100‐5140‐40‐02 Salaries ‐ Longevity Pay 650.00 650.00 645.00 99.23 5.00 31Page 48Item 3.
100‐5143‐40‐02 Cell Phone Allowance 765.00 765.00 300.00 60.00 39.22 465.00 100‐5145‐40‐02 Social Security Expense 10,269.00 10,269.00 7,414.20 547.94 72.20 2,854.80 100‐5150‐40‐02 Medicare Expense 2,402.00 2,402.00 1,733.98 128.15 72.19 668.02 100‐5155‐40‐02 SUTA Expense 486.00 486.00 432.00 88.89 54.00 100‐5160‐40‐02 Health Insurance 23,059.00 23,059.00 16,418.64 1,517.36 71.20 6,640.36 100‐5165‐40‐02 Dental Insurance 1,161.00 1,161.00 852.96 72.66 73.47 308.04 100‐5170‐40‐02 Life Insurance/AD&D 262.00 262.00 225.12 18.76 85.92 36.88 100‐5175‐40‐02 Liability (TML)/Workers' Comp 691.00 691.00 731.08 59.88 105.80 (40.08) 100‐5180‐40‐02 TMRS Expense 22,441.00 22,441.00 17,501.38 1,328.87 77.99 4,939.62 100‐5185‐40‐02 Long/Short Term Disability 313.00 313.00 222.99 18.66 71.24 90.01 100‐5186‐40‐02 WELLE‐Wellness Prog Reimb Empl 1,050.00 1,050.00 400.00 38.10 650.00 Subtotal object ‐ 05 227,742.00 4,440.05 232,182.05 175,067.26 13,566.68 75.40 57,114.79 100‐5210‐40‐02 Office Supplies 850.00 850.00 182.94 38.97 21.52 667.06 100‐5220‐40‐02 Office Equipment 8,327.00 8,327.00 8,302.47 99.71 24.53 100‐5230‐40‐02 Dues,Fees,& Subscriptions 1,240.00 1,240.00 365.00 100.00 29.44 875.00 100‐5240‐40‐02 Postage and Delivery 850.00 850.00 578.90 207.20 68.11 271.10 100‐5280‐40‐02 Printing and Reproduction 2,500.00 2,500.00 445.50 245.50 17.82 2,054.50 Subtotal object ‐ 05 13,767.00 13,767.00 9,874.81 591.67 71.73 3,892.19 100‐5330‐40‐02 Copier Expense 50.00 50.00 10.27 20.54 39.73 100‐5350‐40‐02 Vehicle Expense 1,573.00 1,573.00 934.73 6.00 59.42 638.27 100‐5352‐40‐02 Fuel 2,079.00 2,079.00 649.18 31.23 1,429.82 100‐5353‐40‐02 Oil/Grease/Inspections 225.00 225.00 ‐ 225.00 Subtotal object ‐ 05 3,927.00 3,927.00 1,594.18 6.00 40.60 2,332.82 100‐5400‐40‐02 Uniform Expense 550.00 550.00 262.84 47.79 287.16 100‐5418‐40‐02 IT Fees 440.00 440.00 (135.96) (30.90) 575.96 100‐5419‐40‐02 IT Licenses 6,140.00 6,140.00 500.00 8.14 5,640.00 100‐5430‐40‐02 Legal Fees 2,250.00 2,250.00 1,803.00 152.00 80.13 447.00 100‐5435‐40‐02 Legal Notices/Filings 250.00 250.00 ‐ 250.00 100‐5480‐40‐02 Contracted Services 115,980.00 115,980.00 86,308.00 3,590.00 18,680.00 74.42 10,992.00 Subtotal object ‐ 05 125,610.00 125,610.00 88,737.88 3,742.00 18,680.00 70.65 18,192.12 100‐5520‐40‐02 Telephones 912.00 912.00 606.13 66.46 305.87 100‐5526‐40‐02 Data Network 912.00 912.00 619.05 75.98 67.88 292.95 100‐5530‐40‐02 Travel 4,075.00 4,075.00 610.55 14.98 3,464.45 100‐5533‐40‐02 Mileage Expense 800.00 800.00 ‐ 800.00 100‐5536‐40‐02 Training/Seminars 3,651.00 3,651.00 228.10 6.25 3,422.90 Subtotal object ‐ 05 10,350.00 10,350.00 2,063.83 75.98 19.94 8,286.17 100‐5620‐40‐02 Tools & Equipment 400.00 400.00 410.88 37.65 102.72 (10.88) 100‐5630‐40‐02 Safety Equipment 550.00 550.00 ‐ 550.00 100‐5640‐40‐02 Signs & Hardware 400.00 400.00 ‐ 400.00 Subtotal object ‐ 05 1,350.00 1,350.00 410.88 37.65 30.44 939.12 100‐6160‐40‐02 Capital Expense‐Vehicles 23,616.00 23,616.00 24,046.45 101.82 (430.45) Subtotal object ‐ 06 23,616.00 23,616.00 24,046.45 101.82 (430.45) 100‐7145‐40‐02 Transfer to VERF 6,077.00 6,077.00 5,570.62 506.42 91.67 506.38 Subtotal object ‐ 07 6,077.00 6,077.00 5,570.62 506.42 91.67 506.38 Program number: 2 CODE COMPLIANCE 412,439.00 4,440.05 416,879.05 307,365.91 18,526.40 18,680.00 73.73 90,833.14 100‐5110‐40‐03 Salaries & Wages 383,010.00 17,225.64 400,235.64 369,080.97 31,066.22 92.22 31,154.67 100‐5115‐40‐03 Salaries ‐ Overtime 2,000.00 2,000.00 1,309.72 45.12 65.49 690.28 100‐5126‐40‐03 Salaries‐Vacation Buy‐Out 5,487.00 5,487.00 3,622.32 66.02 1,864.68 100‐5140‐40‐03 Salaries ‐ Longevity Pay 1,680.00 1,680.00 1,670.00 99.41 10.00 100‐5143‐40‐03 Cell Phone Allowance 2,760.00 2,760.00 2,530.00 230.00 91.67 230.00 100‐5145‐40‐03 Social Security Expense 24,487.00 24,487.00 21,833.61 1,856.95 89.16 2,653.39 100‐5150‐40‐03 Medicare Expense 5,727.00 5,727.00 5,106.25 434.28 89.16 620.75 100‐5155‐40‐03 SUTA Expense 810.00 810.00 720.00 88.89 90.00 100‐5160‐40‐03 Health Insurance 57,882.00 57,882.00 54,427.08 4,334.28 94.03 3,454.92 100‐5165‐40‐03 Dental Insurance 2,299.00 2,299.00 2,073.94 187.40 90.21 225.06 100‐5170‐40‐03 Life Insurance/AD&D 544.00 544.00 565.62 51.42 103.97 (21.62) 32Page 49Item 3.
100‐5175‐40‐03 Liability (TML)/Workers' Comp 1,044.00 1,044.00 1,321.99 122.41 126.63 (277.99) 100‐5180‐40‐03 TMRS Expense 53,514.00 53,514.00 51,224.18 4,371.04 95.72 2,289.82 100‐5185‐40‐03 Long/Short Term Disability 728.00 728.00 640.61 57.32 88.00 87.39 100‐5186‐40‐03 WELLE‐Wellness Prog Reimb Empl 1,800.00 1,800.00 1,530.76 139.16 85.04 269.24 Subtotal object ‐ 05 543,772.00 17,225.64 560,997.64 517,657.05 42,895.60 92.27 43,340.59 100‐5210‐40‐03 Office Supplies 4,643.00 4,643.00 1,910.94 81.46 41.16 2,732.06 100‐5220‐40‐03 Office Equipment 1,631.00 1,631.00 544.76 33.40 1,086.24 100‐5230‐40‐03 Dues,Fees,& Subscriptions 3,200.00 3,200.00 3,217.93 125.00 100.56 (17.93) 100‐5240‐40‐03 Postage and Delivery 550.00 550.00 294.40 19.90 53.53 255.60 100‐5250‐40‐03 Publications 150.00 150.00 ‐ 150.00 100‐5280‐40‐03 Printing and Reproduction 2,000.00 2,000.00 394.20 245.51 19.71 1,605.80 100‐5290‐40‐03 Other Charges and Services 300.00 300.00 ‐ 300.00 Subtotal object ‐ 05 12,474.00 12,474.00 6,362.23 471.87 51.00 6,111.77 100‐5330‐40‐03 Copier Expense 3,000.00 3,000.00 1,622.35 54.08 1,377.65 Subtotal object ‐ 05 3,000.00 3,000.00 1,622.35 54.08 1,377.65 100‐5400‐40‐03 Uniform Expense 750.00 750.00 401.90 53.59 348.10 100‐5410‐40‐03 Professional Services 115,830.00 115,830.00 88,185.00 5,000.00 76.13 22,645.00 100‐5418‐40‐03 IT Fees 2,000.00 2,000.00 1,334.59 0.07 66.73 665.34 100‐5419‐40‐03 IT Licenses 15,300.00 15,300.00 15,164.19 99.11 135.81 100‐5430‐40‐03 Legal Fees 15,000.00 15,000.00 23,788.00 1,862.00 158.59 (8,788.00) 100‐5435‐40‐03 Legal Notices/Filings 2,000.00 2,000.00 1,131.50 372.00 56.58 868.50 100‐5480‐40‐03 Contracted Services 1,500.00 1,500.00 1,212.53 80.84 287.47 Subtotal object ‐ 05 152,380.00 152,380.00 131,217.71 2,234.00 5,000.07 86.11 16,162.22 100‐5526‐40‐03 Data Network 3,360.00 3,360.00 2,735.28 303.92 81.41 624.72 100‐5530‐40‐03 Travel 7,352.00 7,352.00 2,148.97 29.23 5,203.03 100‐5533‐40‐03 Mileage Expense 1,650.00 1,650.00 359.60 21.79 1,290.40 100‐5536‐40‐03 Training/Seminars 4,350.00 4,350.00 397.14 20.00 9.13 3,952.86 Subtotal object ‐ 05 16,712.00 16,712.00 5,640.99 323.92 33.75 11,071.01 100‐7145‐40‐03 Transfer to VERF 1,005.00 1,005.00 921.25 83.75 91.67 83.75 Subtotal object ‐ 07 1,005.00 1,005.00 921.25 83.75 91.67 83.75 Program number: 3 PLANNING 729,343.00 17,225.64 746,568.64 663,421.58 46,009.14 5,000.07 88.86 78,146.99 Department number: 40 DEVELOPMENT SERVICES 3,211,836.00 26,402.78 3,238,238.78 2,345,757.08 172,118.60 522,412.31 72.44 370,069.39 100‐5110‐50‐01 Salaries & Wages 361,096.00 9,458.10 370,554.10 334,686.33 30,929.80 90.32 35,867.77 100‐5115‐50‐01 Salaries ‐ Overtime 14,763.00 14,763.00 10,237.58 426.23 69.35 4,525.42 100‐5140‐50‐01 Salaries ‐ Longevity Pay 2,040.00 2,040.00 1,995.00 97.79 45.00 100‐5145‐50‐01 Social Security Expense 23,430.00 23,430.00 20,096.23 1,795.92 85.77 3,333.77 100‐5150‐50‐01 Medicare Expense 5,480.00 5,480.00 4,699.92 420.01 85.77 780.08 100‐5155‐50‐01 SUTA Expense 1,296.00 1,296.00 1,154.68 89.10 141.32 100‐5160‐50‐01 Health Insurance 67,327.00 67,327.00 60,969.77 5,985.36 90.56 6,357.23 100‐5165‐50‐01 Dental Insurance 2,827.00 2,827.00 2,747.00 287.56 97.17 80.00 100‐5170‐50‐01 Life Insurance/AD&D 748.00 748.00 712.88 75.04 95.31 35.12 100‐5175‐50‐01 Liability (TML)/Workers' Comp 14,841.00 14,841.00 15,068.78 1,444.16 101.54 (227.78) 100‐5180‐50‐01 TMRS Expense 51,206.00 51,206.00 47,129.18 4,259.14 92.04 4,076.82 100‐5185‐50‐01 Long/Short Term Disability 686.00 686.00 537.98 55.32 78.42 148.02 100‐5186‐50‐01 WELLE‐Wellness Prog Reimb Empl 2,700.00 2,700.00 1,100.00 100.00 40.74 1,600.00 Subtotal object ‐ 05 548,440.00 9,458.10 557,898.10 501,135.33 45,778.54 89.83 56,762.77 100‐5210‐50‐01 Office Supplies 1,300.00 1,300.00 346.01 28.68 26.62 953.99 100‐5220‐50‐01 Office Equipment 2,310.00 2,310.00 2,275.89 98.52 34.11 100‐5230‐50‐01 Dues,Fees,& Subscriptions 500.00 500.00 1,765.00 353.00 (1,265.00) Subtotal object ‐ 05 4,110.00 4,110.00 4,386.90 28.68 106.74 (276.90) 100‐5310‐50‐01 Rental Expense 36,000.00 (7,956.00) 28,044.00 24,537.18 3,736.02 87.50 3,506.82 100‐5320‐50‐01 Repairs & Maintenance 2,000.00 2,000.00 1,269.45 63.47 730.55 100‐5321‐50‐01 Signal Light Repairs 22,000.00 22,000.00 14,281.14 64.91 7,718.86 100‐5340‐50‐01 Building Repairs 1,000.00 1,000.00 96.49 9.65 903.51 100‐5350‐50‐01 Vehicle Expense 10,440.00 10,440.00 11,420.20 109.39 (980.20) 100‐5351‐50‐01 Equipment Expense/Repair 4,000.00 7,956.00 11,956.00 12,501.66 104.56 (545.66) 33Page 50Item 3.
100‐5352‐50‐01 Fuel 7,500.00 7,500.00 7,760.89 103.48 (260.89) 100‐5353‐50‐01 Oil/Grease/Inspections 1,680.00 1,680.00 80.00 4.76 1,600.00 Subtotal object ‐ 05 84,620.00 84,620.00 71,947.01 3,736.02 85.02 12,672.99 100‐5400‐50‐01 Uniform Expense 5,900.00 5,900.00 6,115.97 1,480.00 103.66 (215.97) 100‐5419‐50‐01 IT LICENSES 1,000.00 1,000.00 1,000.00 ‐ 100‐5430‐50‐01 Legal Fees 952.00 952.00 76.00 7.98 876.00 100‐5480‐50‐01 Contracted Services 232,850.00 246,381.40 479,231.40 336,345.55 214.40 96,268.28 70.18 46,617.57 100‐5480‐50‐01‐1924‐WA Fifth Street Water Line 2,625.00 ‐ (2,625.00) 100‐5480‐50‐01‐1941‐TR Contr Svcs‐PT/Coit Pole Repair 23,150.00 ‐ (23,150.00) 100‐5485‐50‐01 Contract Svcs ‐ Annual Street 1,250,000.00 (1,250,000.00) ‐ Subtotal object ‐ 05 1,490,702.00 (1,003,618.60) 487,083.40 368,312.52 1,694.40 97,268.28 75.62 21,502.60 100‐5520‐50‐01 Telephones 3,000.00 3,000.00 2,078.51 69.28 921.49 100‐5523‐50‐01 Water/Sewer Charges 300.00 300.00 401.11 40.96 133.70 (101.11) 100‐5525‐50‐01 Electricity 3,000.00 3,000.00 2,500.00 250.00 83.33 500.00 100‐5526‐50‐01 Data Network 300.00 300.00 1,035.03 77.08 345.01 (735.03) 100‐5527‐50‐01 Electricity ‐ Street Lights 224,000.00 224,000.00 199,726.34 19,559.49 89.16 24,273.66 100‐5530‐50‐01 Travel 500.00 500.00 ‐ 500.00 100‐5536‐50‐01 Training/Seminars 3,800.00 3,800.00 295.00 7.76 3,505.00 Subtotal object ‐ 05 234,900.00 234,900.00 206,035.99 19,927.53 87.71 28,864.01 100‐5620‐50‐01 Tools & Equipment 9,000.00 9,000.00 4,056.00 259.16 45.07 4,944.00 100‐5630‐50‐01 Safety Equipment 5,000.00 5,000.00 3,526.69 1,440.00 70.53 1,473.31 100‐5640‐50‐01 Signs & Hardware 55,000.00 55,000.00 41,098.37 7,404.86 (1,795.00) 74.72 15,696.63 100‐5650‐50‐01 Maintenance Materials 100,000.00 (6,000.00) 94,000.00 83,304.65 4,723.75 9,116.54 88.62 1,578.81 Subtotal object ‐ 05 169,000.00 (6,000.00) 163,000.00 131,985.71 13,827.77 7,321.54 80.97 23,692.75 100‐5930‐50‐01 Damage Claims Expense 2,397.74 2,397.74 ‐ (2,397.74) Subtotal object ‐ 05 2,397.74 2,397.74 ‐ (2,397.74) 100‐6160‐50‐01 Capital Expense‐Vehicles 29,100.00 29,100.00 31,307.95 107.59 (2,207.95) Subtotal object ‐ 06 29,100.00 29,100.00 31,307.95 107.59 (2,207.95) 100‐7144‐50‐01 Transfer to Bond Fund 1,250,000.00 1,250,000.00 1,250,000.00 100.00 100‐7145‐50‐01 Transfer to VERF 68,244.00 68,244.00 62,557.00 5,687.00 91.67 5,687.00 Subtotal object ‐ 07 68,244.00 1,250,000.00 1,318,244.00 1,312,557.00 5,687.00 99.57 5,687.00 Program number: 1 STREETS 2,629,116.00 249,839.50 2,878,955.50 2,630,066.15 93,077.68 104,589.82 91.36 144,299.53 100‐5212‐50‐05 BUILDING SUPPLIES 3,000.00 6,000.00 9,000.00 1,692.23 221.90 5,962.50 18.80 1,345.27 Subtotal object ‐ 05 3,000.00 6,000.00 9,000.00 1,692.23 221.90 5,962.50 18.80 1,345.27 100‐5340‐50‐05 BUILDING REPAIRS 13,000.00 13,000.00 13,773.36 5,156.75 105.95 (773.36) Subtotal object ‐ 05 13,000.00 13,000.00 13,773.36 5,156.75 105.95 (773.36) 100‐5480‐50‐05 CONTRACTED SERVICES 190,780.00 190,780.00 130,712.66 26,237.65 4,117.94 68.52 55,949.40 Subtotal object ‐ 05 190,780.00 190,780.00 130,712.66 26,237.65 4,117.94 68.52 55,949.40 100‐5523‐50‐05 WATER/SEWER CHARGES 8,000.00 8,000.00 10,358.96 1,980.41 129.49 (2,358.96) 100‐5525‐50‐05 ELECTRICITY 120,000.00 (24,966.00) 95,034.00 63,907.69 6,187.04 67.25 31,126.31 Subtotal object ‐ 05 128,000.00 (24,966.00) 103,034.00 74,266.65 8,167.45 72.08 28,767.35 100‐6125‐50‐05 Capital Expense ‐ Technology 18,966.00 18,966.00 18,965.99 ‐ 0.01 Subtotal object ‐ 06 18,966.00 18,966.00 18,965.99 ‐ 0.01 Program number: 5 FACILITIES MANAGEMENT 334,780.00 334,780.00 220,444.90 39,783.75 29,046.43 65.85 85,288.67 Department number: 50 PUBLIC WORKS 2,963,896.00 249,839.50 3,213,735.50 2,850,511.05 132,861.43 133,636.25 88.70 229,588.20 100‐5110‐60‐01 Salaries & Wages 326,600.00 11,619.80 338,219.80 311,177.40 26,167.54 92.00 27,042.40 100‐5115‐60‐01 Salaries ‐ Overtime 500.00 500.00 2,133.91 73.69 426.78 (1,633.91) 100‐5126‐60‐01 Salaries‐Vacation Buy‐Out 3,598.00 3,598.00 3,700.12 102.84 (102.12) 100‐5140‐60‐01 Salaries ‐ Longevity Pay 850.00 850.00 810.00 95.29 40.00 100‐5143‐60‐01 Cell Phone Allowance 2,940.00 2,940.00 2,970.00 270.00 101.02 (30.00) 100‐5145‐60‐01 Social Security Expense 20,739.00 20,739.00 20,023.14 1,691.09 96.55 715.86 100‐5150‐60‐01 Medicare Expense 4,851.00 4,851.00 4,682.82 395.48 96.53 168.18 100‐5155‐60‐01 SUTA Expense 648.00 648.00 720.00 111.11 (72.00) 100‐5160‐60‐01 Health Insurance 37,372.00 37,372.00 31,179.70 2,373.98 83.43 6,192.30 100‐5165‐60‐01 Dental Insurance 1,758.00 1,758.00 1,563.32 140.62 88.93 194.68 100‐5170‐60‐01 Life Insurance/AD&D 451.00 451.00 326.04 29.64 72.29 124.96 34Page 51Item 3.
100‐5175‐60‐01 Liability (TML)/Workers' Comp 635.00 635.00 3,422.53 311.04 538.98 (2,787.53) 100‐5180‐60‐01 TMRS Expense 45,324.00 45,324.00 43,162.24 3,563.68 95.23 2,161.76 100‐5185‐60‐01 Long/Short Term Disability 621.00 621.00 538.74 49.70 86.75 82.26 100‐5186‐60‐01 WELLE‐Wellness Prog Reimb Empl 2,400.00 2,400.00 894.04 78.32 37.25 1,505.96 100‐5190‐60‐01 Contract Labor 19,015.50 2,425.50 ‐ (19,015.50) Subtotal object ‐ 05 449,287.00 11,619.80 460,906.80 446,319.50 37,570.28 96.84 14,587.30 100‐5210‐60‐01 Office Supplies 2,000.00 2,000.00 1,967.69 661.16 98.39 32.31 100‐5212‐60‐01 Building Supplies 1,000.00 1,000.00 146.57 14.66 853.43 100‐5220‐60‐01 Office Equipment 3,210.00 3,210.00 99.95 3.11 3,110.05 100‐5230‐60‐01 Dues,Fees,& Subscriptions 2,160.00 2,160.00 1,754.07 175.00 81.21 405.93 100‐5240‐60‐01 Postage and Delivery 50.00 50.00 50.60 101.20 (0.60) 100‐5280‐60‐01 Printing and Reproduction 200.00 200.00 391.74 195.87 (191.74) Subtotal object ‐ 05 8,620.00 8,620.00 4,410.62 836.16 51.17 4,209.38 100‐5320‐60‐01 Repairs & Maintenance 20,000.00 20,000.00 542.00 2.71 19,458.00 100‐5330‐60‐01 Copier Expense 2,800.00 2,800.00 1,001.12 35.75 1,798.88 100‐5340‐60‐01 Building Repairs 5,000.00 5,000.00 2,750.00 ‐ 2,250.00 100‐5350‐60‐01 Vehicle Expense 339.09 9.99 ‐ (339.09) 100‐5352‐60‐01 Fuel 525.00 525.00 179.18 34.13 345.82 100‐5353‐60‐01 Oil/Grease/Inspections 220.00 220.00 ‐ 220.00 Subtotal object ‐ 05 28,545.00 28,545.00 2,061.39 9.99 2,750.00 7.22 23,733.61 100‐5400‐60‐01 Uniform Expense 750.00 750.00 648.45 86.46 101.55 100‐5410‐60‐01 Professional Services 8,760.00 8,760.00 1,150.00 250.00 7,610.00 13.13 100‐5410‐60‐01‐1921‐PK Prof Svcs. Town Hall Open Spac 9,177.80 9,177.80 9,177.80 100.00 100‐5419‐60‐01 IT Licenses 850.00 850.00 1,715.55 1,715.55 201.83 (865.55) 100‐5430‐60‐01 Legal Fees 7,500.00 7,500.00 7,296.00 627.00 97.28 204.00 100‐5435‐60‐01 Legal Notices/Filings 500.00 500.00 140.00 28.00 360.00 100‐5480‐60‐01 Contracted Services 108,500.00 15,000.00 123,500.00 82,925.00 1,400.00 67.15 40,575.00 Subtotal object ‐ 05 118,100.00 32,937.80 151,037.80 103,052.80 3,992.55 7,610.00 68.23 40,375.00 100‐5520‐60‐01 Telephones 325.68 ‐ (325.68) 100‐5523‐60‐01 Water/Sewer Charges 1,560.00 1,560.00 676.39 64.38 43.36 883.61 100‐5524‐60‐01 GAS 2,000.00 2,000.00 710.62 48.92 35.53 1,289.38 100‐5525‐60‐01 Electricity 5,300.00 5,300.00 2,849.03 313.49 53.76 2,450.97 100‐5526‐60‐01 Data Network 2,500.00 2,500.00 238.41 9.54 2,261.59 100‐5530‐60‐01 Travel 5,915.00 5,915.00 1,303.79 22.04 4,611.21 100‐5533‐60‐01 Mileage Expense 2,000.00 2,000.00 888.98 72.45 44.45 1,111.02 100‐5536‐60‐01 Training/Seminars 5,230.00 5,230.00 3,257.49 58.88 62.29 1,972.51 Subtotal object ‐ 05 24,505.00 24,505.00 10,250.39 558.12 41.83 14,254.61 100‐5601‐60‐01 Event ‐ Prosper Christmas 66,000.00 66,000.00 47,070.78 71.32 18,929.22 Subtotal object ‐ 05 66,000.00 66,000.00 47,070.78 71.32 18,929.22 100‐5995‐60‐01 Recreation Activities 50,000.00 50,000.00 ‐ 50,000.00 Subtotal object ‐ 05 50,000.00 50,000.00 ‐ 50,000.00 100‐6110‐60‐01 Capital Expenditure 162,927.00 (162,927.00) ‐ 100‐6160‐60‐01 Capital Expense‐Vehicles 23,800.00 23,800.00 23,626.45 30.00 99.27 143.55 Subtotal object ‐ 06 186,727.00 (162,927.00) 23,800.00 23,626.45 30.00 99.27 143.55 100‐7144‐60‐01 Transfer to Bond Fund 147,927.00 147,927.00 10,722.72 7.25 137,204.28 100‐7145‐60‐01 Transfer to VERF 657.00 657.00 602.25 54.75 91.67 54.75 Subtotal object ‐ 07 657.00 147,927.00 148,584.00 11,324.97 54.75 7.62 137,259.03 Program number: 1 PARKS ADMINISTRATION 932,441.00 29,557.60 961,998.60 648,116.90 43,021.85 10,390.00 67.37 303,491.70 100‐5110‐60‐02 Salaries & Wages 921,751.00 29,753.99 951,504.99 848,925.68 68,688.24 89.22 102,579.31 100‐5115‐60‐02 Salaries ‐ Overtime 16,117.00 16,117.00 9,911.09 461.27 61.50 6,205.91 100‐5126‐60‐02 Salaries‐Vacation Buy‐Out 12,472.00 12,472.00 8,598.32 68.94 3,873.68 100‐5140‐60‐02 Salaries ‐ Longevity Pay 5,545.00 5,545.00 6,420.00 115.78 (875.00) 100‐5143‐60‐02 Cell Phone Allowance 9,540.00 9,540.00 8,910.00 800.00 93.40 630.00 100‐5145‐60‐02 Social Security Expense 59,857.00 59,857.00 51,103.79 4,010.12 85.38 8,753.21 100‐5150‐60‐02 Medicare Expense 14,000.00 14,000.00 11,951.66 937.85 85.37 2,048.34 100‐5155‐60‐02 SUTA Expense 3,402.00 3,402.00 3,031.67 89.11 370.33 35Page 52Item 3.
100‐5160‐60‐02 Health Insurance 222,911.00 222,911.00 174,337.40 14,039.04 78.21 48,573.60 100‐5165‐60‐02 Dental Insurance 8,156.00 8,156.00 6,987.09 642.50 85.67 1,168.91 100‐5170‐60‐02 Life Insurance/AD&D 2,288.00 2,288.00 1,993.25 178.22 87.12 294.75 100‐5175‐60‐02 Liability (TML)/Workers' Comp 17,210.00 17,210.00 21,700.38 1,857.10 126.09 (4,490.38) 100‐5180‐60‐02 TMRS Expense 130,816.00 130,816.00 119,038.19 9,428.51 91.00 11,777.81 100‐5185‐60‐02 Long/Short Term Disability 1,753.00 1,753.00 1,424.63 128.62 81.27 328.37 100‐5186‐60‐02 WELLE‐Wellness Prog Reimb Empl 7,050.00 7,050.00 5,136.32 484.96 72.86 1,913.68 Subtotal object ‐ 05 1,432,868.00 29,753.99 1,462,621.99 1,279,469.47 101,656.43 87.48 183,152.52 100‐5210‐60‐02 Office Supplies 550.00 550.00 109.86 19.98 440.14 100‐5212‐60‐02 Building Supplies 20,200.00 (3,000.00) 17,200.00 8,298.56 2,762.37 48.25 8,901.44 100‐5213‐60‐02 Custodial Supplies 5,500.00 5,500.00 2,474.19 274.01 44.99 3,025.81 100‐5220‐60‐02 Office Equipment 3,461.00 3,461.00 758.00 21.90 2,703.00 100‐5230‐60‐02 Dues,Fees,& Subscriptions 3,306.00 3,306.00 1,703.17 51.52 1,602.83 100‐5240‐60‐02 Postage and Delivery 32.30 17.20 ‐ (32.30) Subtotal object ‐ 05 33,017.00 (3,000.00) 30,017.00 13,376.08 3,053.58 44.56 16,640.92 100‐5310‐60‐02 Rental Expense 38,000.00 38,000.00 36,982.37 2,901.00 97.32 1,017.63 100‐5320‐60‐02 Repairs & Maintenance 48,410.00 (5,000.00) 43,410.00 34,107.42 2,870.73 78.57 9,302.58 100‐5322‐60‐02 Irrigation Repairs 10,200.00 10,200.00 11,201.75 4,411.04 109.82 (1,001.75) 100‐5323‐60‐02 Field Maintenance 51,150.00 51,150.00 29,334.51 3,195.39 3,060.00 57.35 18,755.49 100‐5324‐60‐02 Landscape Maintenance 15,000.00 10,000.00 25,000.00 26,719.49 5,580.00 106.88 (1,719.49) 100‐5330‐60‐02 Copier Expense 237.00 237.00 78.32 33.05 158.68 100‐5350‐60‐02 Vehicle Expense 8,000.00 8,000.00 7,624.23 20.50 95.30 375.77 100‐5351‐60‐02 Equipment Expense/Repair 4,000.00 4,000.00 5,603.47 508.05 140.09 (1,603.47) 100‐5352‐60‐02 Fuel 15,920.00 15,920.00 9,126.11 57.33 6,793.89 100‐5353‐60‐02 Oil/Grease/Inspections 1,800.00 1,800.00 1,622.71 146.27 90.15 177.29 100‐5355‐60‐02 Chemicals/Fertilizer 131,335.00 (5,000.00) 126,335.00 60,161.21 11,889.18 47.62 66,173.79 Subtotal object ‐ 05 324,052.00 324,052.00 222,561.59 31,522.16 3,060.00 68.68 98,430.41 100‐5400‐60‐02 Uniform Expense 13,435.00 13,435.00 12,661.55 873.73 94.24 773.45 100‐5480‐60‐02 Contracted Services 338,132.00 338,132.00 243,202.33 45,284.80 62,919.00 71.93 32,010.67 Subtotal object ‐ 05 351,567.00 351,567.00 255,863.88 46,158.53 62,919.00 72.78 32,784.12 100‐5520‐60‐02 Telephones 3,165.00 3,165.00 2,645.11 83.57 519.89 100‐5523‐60‐02 Water/Sewer Charges 179,788.00 179,788.00 180,479.62 46,189.77 100.39 (691.62) 100‐5525‐60‐02 Electricity 158,857.00 158,857.00 105,333.08 10,274.20 66.31 53,523.92 100‐5526‐60‐02 Data Network 550.00 550.00 378.79 37.99 68.87 171.21 100‐5530‐60‐02 Travel 5,805.00 5,805.00 279.30 4.81 5,525.70 100‐5533‐60‐02 Mileage Expense 450.00 450.00 ‐ 450.00 100‐5536‐60‐02 Training/Seminars 4,320.00 4,320.00 3,199.75 74.07 1,120.25 Subtotal object ‐ 05 352,935.00 352,935.00 292,315.65 56,501.96 82.82 60,619.35 100‐5600‐60‐02 Special Events 3,000.00 3,000.00 2,968.17 98.94 31.83 100‐5620‐60‐02 Tools & Equipment 4,350.00 4,350.00 5,188.24 125.90 119.27 (838.24) 100‐5630‐60‐02 Safety Equipment 4,345.00 4,345.00 4,131.02 170.99 95.08 213.98 100‐5640‐60‐02 Signs & Hardware 5,400.00 5,400.00 2,233.53 41.36 3,166.47 Subtotal object ‐ 05 14,095.00 3,000.00 17,095.00 14,520.96 296.89 84.94 2,574.04 100‐6120‐60‐02 Capital Expense‐Park Impr 80,000.00 15,000.00 95,000.00 93,554.00 98.48 1,446.00 100‐6140‐60‐02 Capital Expense‐Equipment 39,000.00 39,000.00 57,962.45 25,587.45 148.62 (18,962.45) 100‐6160‐60‐02 Capital Expense‐Vehicles 23,689.00 23,689.00 23,656.45 (125.70) 99.86 158.25 Subtotal object ‐ 06 142,689.00 15,000.00 157,689.00 175,172.90 25,587.45 (125.70) 111.09 (17,358.20) 100‐7145‐60‐02 Transfer to VERF 230,113.00 230,113.00 210,936.88 19,176.08 91.67 19,176.12 Subtotal object ‐ 07 230,113.00 230,113.00 210,936.88 19,176.08 91.67 19,176.12 Program number: 2 PARKS OPERATIONS 2,881,336.00 44,753.99 2,926,089.99 2,464,217.41 283,953.08 65,853.30 84.22 396,019.28 100‐5110‐60‐03 Salaries & Wages 94,787.00 4,287.04 99,074.04 85,139.07 7,185.76 85.94 13,934.97 100‐5140‐60‐03 Salaries ‐ Longevity Pay 70.00 70.00 65.00 92.86 5.00 100‐5145‐60‐03 Social Security Expense 5,882.00 5,882.00 5,250.61 442.93 89.27 631.39 100‐5150‐60‐03 Medicare Expense 1,376.00 1,376.00 1,227.97 103.59 89.24 148.03 100‐5155‐60‐03 SUTA Expense 324.00 324.00 288.00 88.89 36.00 100‐5160‐60‐03 Health Insurance 23,418.00 23,418.00 6,544.84 529.76 27.95 16,873.16 36Page 53Item 3.
100‐5165‐60‐03 Dental Insurance 875.00 875.00 748.44 68.04 85.54 126.56 100‐5170‐60‐03 Life Insurance/AD&D 226.00 226.00 206.36 18.76 91.31 19.64 100‐5175‐60‐03 Liability (TML)/Workers' Comp 942.00 942.00 1,914.66 173.40 203.26 (972.66) 100‐5180‐60‐03 TMRS Expense 12,854.00 12,854.00 11,581.18 978.26 90.10 1,272.82 100‐5185‐60‐03 Long/Short Term Disability 181.00 181.00 148.30 13.66 81.93 32.70 100‐5186‐60‐03 WELLE‐Wellness Prog Reimb Empl 600.00 600.00 313.28 39.16 52.21 286.72 Subtotal object ‐ 05 141,535.00 4,287.04 145,822.04 113,427.71 9,553.32 77.79 32,394.33 100‐5210‐60‐03 Office Supplies 225.00 225.00 196.73 35.36 87.44 28.27 100‐5220‐60‐03 Office Equipment 3,700.00 3,700.00 3,832.43 103.58 (132.43) 100‐5230‐60‐03 Dues,Fees,& Subscriptions 40.00 ‐ (40.00) 100‐5240‐60‐03 Postage and Delivery 3,700.00 3,700.00 280.60 280.60 7.58 3,419.40 100‐5260‐60‐03 Advertising 1,900.00 1,900.00 1,223.00 65.00 64.37 677.00 100‐5280‐60‐03 Printing and Reproduction 4,000.00 4,000.00 254.36 6.36 3,745.64 Subtotal object ‐ 05 13,525.00 13,525.00 5,827.12 380.96 43.08 7,697.88 100‐5475‐60‐03 Credit Card Fees 4,000.00 4,000.00 2,705.32 399.78 67.63 1,294.68 Subtotal object ‐ 05 4,000.00 4,000.00 2,705.32 399.78 67.63 1,294.68 100‐5520‐60‐03 Telephones 650.00 650.00 ‐ 650.00 Subtotal object ‐ 05 650.00 650.00 ‐ 650.00 100‐5600‐60‐03 Special Events 33,130.00 33,130.00 20,833.58 62.88 12,296.42 Subtotal object ‐ 05 33,130.00 33,130.00 20,833.58 62.88 12,296.42 100‐5995‐60‐03 Recreation Activities 84,400.00 84,400.00 33,395.87 6,943.40 39.57 51,004.13 Subtotal object ‐ 05 84,400.00 84,400.00 33,395.87 6,943.40 39.57 51,004.13 Program number: 3 RECREATION 277,240.00 4,287.04 281,527.04 176,189.60 17,277.46 62.58 105,337.44 100‐5110‐60‐05 Salaries & Wages 344,753.00 26,461.51 371,214.51 257,210.71 23,488.36 69.29 114,003.80 100‐5126‐60‐05 Salaries‐Vacation Buy‐Out 4,412.00 4,412.00 4,500.64 102.01 (88.64) 100‐5140‐60‐05 Salaries ‐ Longevity Pay 455.00 455.00 405.00 89.01 50.00 100‐5145‐60‐05 Social Security Expense 21,677.00 21,677.00 15,817.62 1,429.97 72.97 5,859.38 100‐5150‐60‐05 Medicare Expense 5,070.00 5,070.00 3,699.30 334.41 72.96 1,370.70 100‐5155‐60‐05 SUTA Expense 2,430.00 2,430.00 1,388.16 110.11 57.13 1,041.84 100‐5160‐60‐05 Health Insurance 40,284.00 40,284.00 19,254.10 1,544.48 47.80 21,029.90 100‐5165‐60‐05 Dental Insurance 1,723.00 1,723.00 1,151.04 104.64 66.80 571.96 100‐5170‐60‐05 Life Insurance/AD&D 446.00 446.00 222.86 20.26 49.97 223.14 100‐5175‐60‐05 Liability (TML)/Workers' Comp 723.00 723.00 758.48 75.20 104.91 (35.48) 100‐5180‐60‐05 TMRS Expense 28,521.00 28,521.00 24,039.50 2,098.81 84.29 4,481.50 100‐5185‐60‐05 Long/Short Term Disability 391.00 391.00 297.46 29.32 76.08 93.54 100‐5186‐60‐05 WELLE‐Wellness Prog Reimb Empl 600.00 600.00 626.56 78.32 104.43 (26.56) Subtotal object ‐ 05 451,485.00 26,461.51 477,946.51 329,371.43 29,313.88 68.91 148,575.08 100‐5210‐60‐05 Office Supplies 4,500.00 4,500.00 3,905.93 204.28 86.80 594.07 100‐5220‐60‐05 Office Equipment 3,412.18 2,210.76 ‐ (3,412.18) 100‐5230‐60‐05 Dues,Fees,& Subscriptions 6,488.00 6,488.00 3,971.45 12.99 61.21 2,516.55 100‐5240‐60‐05 Postage and Delivery 500.00 500.00 877.92 34.03 175.58 (377.92) 100‐5280‐60‐05 Printing and Reproduction 1,400.00 1,400.00 564.26 40.30 835.74 100‐5281‐60‐05 Book Purchases 41,000.00 41,000.00 27,523.04 1,686.64 5,390.52 67.13 8,086.44 100‐5282‐60‐05 DVD Purchases 2,000.00 2,000.00 1,764.06 29.06 88.20 235.94 100‐5283‐60‐05 Audiobook Purchases 1,500.00 1,500.00 716.47 47.77 783.53 100‐5284‐60‐05 Other Collect. Item Purchases 2,000.00 2,000.00 1,999.00 99.95 1.00 100‐5290‐60‐05 Other Charges and Services 2,000.00 2,000.00 2,602.82 254.37 130.14 (602.82) Subtotal object ‐ 05 61,388.00 61,388.00 47,337.13 4,432.13 5,390.52 77.11 8,660.35 100‐5330‐60‐05 Copier Expense 1,854.00 1,854.00 992.07 53.51 861.93 Subtotal object ‐ 05 1,854.00 1,854.00 992.07 53.51 861.93 100‐5400‐60‐05 Uniform Expense 1,300.00 1,300.00 1,282.80 98.68 17.20 100‐5430‐60‐05 Legal Fees 250.00 250.00 646.00 258.40 (396.00) 100‐5480‐60‐05 Contracted Services 8,100.00 8,100.00 5,500.00 67.90 2,600.00 Subtotal object ‐ 05 9,650.00 9,650.00 7,428.80 76.98 2,221.20 100‐5520‐60‐05 Telephones 450.00 450.00 323.65 71.92 126.35 100‐5530‐60‐05 Travel 3,500.00 3,500.00 1,644.27 46.98 1,855.73 37Page 54Item 3.
100‐5533‐60‐05 Mileage Expense 750.00 750.00 276.29 23.81 36.84 473.71 100‐5536‐60‐05 Training/Seminars 1,250.00 1,250.00 699.51 55.96 550.49 Subtotal object ‐ 05 5,950.00 5,950.00 2,943.72 23.81 49.47 3,006.28 100‐5600‐60‐05 Special Events 3,000.00 3,000.00 3,912.67 502.85 130.42 (912.67) Subtotal object ‐ 05 3,000.00 3,000.00 3,912.67 502.85 130.42 (912.67) 100‐7145‐60‐05 Transfer to VERF 6,794.00 6,794.00 6,227.87 566.17 91.67 566.13 Subtotal object ‐ 07 6,794.00 6,794.00 6,227.87 566.17 91.67 566.13 Program number: 5 LIBRARY 540,121.00 26,461.51 566,582.51 398,213.69 34,838.84 5,390.52 70.28 162,978.30 Department number: 60 COMMUNITY SERVICES 4,631,138.00 105,060.14 4,736,198.14 3,686,737.60 379,091.23 81,633.82 77.84 967,826.72 100‐5110‐98‐01 Salaries & Wages 1,049,961.00 15,831.62 1,065,792.62 929,689.81 87,680.60 87.23 136,102.81 100‐5115‐98‐01 Salaries ‐ Overtime 700.00 700.00 698.81 99.83 1.19 100‐5126‐98‐01 Salaries‐Vacation Buy‐Out 14,190.00 14,190.00 12,460.70 87.81 1,729.30 100‐5140‐98‐01 Salaries ‐ Longevity Pay 2,285.00 2,285.00 1,910.00 83.59 375.00 100‐5143‐98‐01 Cell Phone Allowance 935.00 935.00 1,095.00 205.00 117.11 (160.00) 100‐5145‐98‐01 Social Security Expense 66,221.00 66,221.00 52,845.42 5,067.22 79.80 13,375.58 100‐5150‐98‐01 Medicare Expense 15,487.00 15,487.00 12,848.52 1,185.07 82.96 2,638.48 100‐5155‐98‐01 SUTA Expense 1,782.00 1,782.00 1,732.57 97.23 49.43 100‐5160‐98‐01 Health Insurance 155,093.00 155,093.00 80,738.66 7,580.66 52.06 74,354.34 100‐5165‐98‐01 Dental Insurance 5,316.00 5,316.00 3,613.59 382.46 67.98 1,702.41 100‐5170‐98‐01 Life Insurance/AD&D 1,202.00 1,202.00 1,135.93 109.90 94.50 66.07 100‐5175‐98‐01 Liability (TML)/Workers' Comp 11,964.00 11,964.00 5,679.26 350.92 47.47 6,284.74 100‐5180‐98‐01 TMRS Expense 144,724.00 144,724.00 128,342.73 11,912.58 88.68 16,381.27 100‐5185‐98‐01 Long/Short Term Disability 1,997.00 1,997.00 1,581.87 166.60 79.21 415.13 100‐5186‐98‐01 WELLE‐Wellness Prog Reimb Empl 5,350.00 5,350.00 2,950.00 300.00 55.14 2,400.00 Subtotal object ‐ 05 1,477,207.00 15,831.62 1,493,038.62 1,237,322.87 114,941.01 82.87 255,715.75 100‐5210‐98‐01 Office Supplies 2,775.00 2,775.00 1,658.17 108.24 59.75 1,116.83 100‐5220‐98‐01 Office Equipment 6,410.00 3,824.96 10,234.96 7,416.59 43.98 72.46 2,818.37 100‐5230‐98‐01 Dues,Fees,& Subscriptions 2,175.00 2,175.00 3,953.40 181.77 (1,778.40) 100‐5240‐98‐01 Postage and Delivery 280.00 280.00 254.30 3.00 90.82 25.70 100‐5250‐98‐01 Publications 400.00 400.00 ‐ 400.00 100‐5280‐98‐01 Printing and Reproduction 100.00 100.00 203.10 203.10 (103.10) 100‐5290‐98‐01 Other Charges and Services 411.31 ‐ (411.31) Subtotal object ‐ 05 12,140.00 3,824.96 15,964.96 13,896.87 155.22 87.05 2,068.09 100‐5330‐98‐01 Copier Expense 1,075.00 1,075.00 1,610.99 149.86 (535.99) 100‐5350‐98‐01 Vehicle Expense 870.00 870.00 1,923.78 19.98 221.12 (1,053.78) 100‐5352‐98‐01 Fuel 2,700.00 2,700.00 1,790.65 66.32 909.35 Subtotal object ‐ 05 4,645.00 4,645.00 5,325.42 19.98 114.65 (680.42) 100‐5400‐98‐01 Uniform Expense 900.00 900.00 2,560.50 824.86 284.50 (1,660.50) 100‐5405‐98‐01 Land Acquisition Services 2,100.00 ‐ (2,100.00) 100‐5410‐98‐01 Professional Services 40,719.00 1,060.00 41,779.00 4,058.89 44,577.00 9.72 (6,856.89) 100‐5410‐98‐01‐1831‐ST First/BNSF RR Overpass 27,407.00 27,407.00 11,510.19 16,304.81 42.00 (408.00) 100‐5410‐98‐01‐1832‐ST Prosper Trl/BNSF RR Overpass 36,452.51 36,452.51 41,690.33 4,912.00 114.37 (10,149.82) 100‐5410‐98‐01‐1942‐TR Traffic Signal Warrant Study 20,000.00 20,000.00 20,000.00 100.00 100‐5419‐98‐01 IT Licenses 11,830.00 11,830.00 7,455.69 396.17 63.02 4,374.31 100‐5430‐98‐01 Legal Fees 11,000.00 11,000.00 12,788.90 2,394.00 116.26 (1,788.90) 100‐5435‐98‐01 Legal Notices/Filings 2,400.00 2,400.00 1,409.60 (576.00) 58.73 990.40 100‐5480‐98‐01 Contracted Services 150,000.00 150,000.00 1,500.00 1,500.00 1.00 148,500.00 Subtotal object ‐ 05 216,849.00 84,919.51 301,768.51 102,974.10 4,539.03 67,893.81 34.12 130,900.60 100‐5520‐98‐01 Telephones 4,995.00 4,995.00 1,813.55 36.31 3,181.45 100‐5526‐98‐01 Data Network 1,784.49 209.94 ‐ (1,784.49) 100‐5530‐98‐01 Travel 3,850.00 3,850.00 571.11 14.83 3,278.89 100‐5533‐98‐01 Mileage Expense 1,275.00 1,275.00 730.81 57.32 544.19 100‐5536‐98‐01 Training/Seminars 5,100.00 5,100.00 2,712.40 39.00 53.18 2,387.60 Subtotal object ‐ 05 15,220.00 15,220.00 7,612.36 248.94 50.02 7,607.64 100‐5620‐98‐01 Tools & Equipment 200.00 200.00 249.47 21.84 124.74 (49.47) 100‐5630‐98‐01 Safety Equipment 200.00 200.00 854.99 494.99 427.50 (654.99) 38Page 55Item 3.
Subtotal object ‐ 05 400.00 400.00 1,104.46 516.83 276.12 (704.46) 100‐7145‐98‐01 Transfer to VERF 8,332.00 8,332.00 7,637.63 694.33 91.67 694.37 Subtotal object ‐ 07 8,332.00 8,332.00 7,637.63 694.33 91.67 694.37 Program number: 1 ENGINEERING 1,734,793.00 104,576.09 1,839,369.09 1,375,873.71 121,115.34 67,893.81 74.80 395,601.57 Department number: 98 ENGINEERING 1,734,793.00 104,576.09 1,839,369.09 1,375,873.71 121,115.34 67,893.81 74.80 395,601.57 Expense Subtotal ‐ ‐ ‐ ‐ ‐ ‐ 29,865,198.00 1,609,828.54 31,475,026.54 26,056,033.99 2,131,051.55 1,258,650.81 82.78 4,160,341.74 Fund number: 100 GENERAL (447,622.00) 1,190,156.54 742,534.54 (5,090,109.16) 750,868.01 1,258,650.81 4,573,992.89 120‐4120‐20‐01 Sales Taxes (1,338,204.00) (1,338,204.00) (1,413,887.02) (176,421.85) 105.66 75,683.02 Subtotal object ‐ 04 (1,338,204.00) (1,338,204.00) (1,413,887.02) (176,421.85) 105.66 75,683.02 120‐4610‐20‐01 Interest Income (5,000.00) (5,000.00) (1,249.13) (278.64) 24.98 (3,750.87) Subtotal object ‐ 04 (5,000.00) (5,000.00) (1,249.13) (278.64) 24.98 (3,750.87) Program number: 1 OPERATIONS (1,343,204.00) (1,343,204.00) (1,415,136.15) (176,700.49) 105.36 71,932.15 Department number: 20 POLICE (1,343,204.00) (1,343,204.00) (1,415,136.15) (176,700.49) 105.36 71,932.15 Revenue Subtotal ‐ ‐ ‐ ‐ ‐ ‐ (1,343,204.00) (1,343,204.00) (1,415,136.15) (176,700.49) 105.36 71,932.15 120‐5110‐20‐01 Salaries & Wages 825,126.00 18,951.00 844,077.00 749,635.75 68,703.68 88.81 94,441.25 120‐5115‐20‐01 Salaries ‐ Overtime 135,636.00 135,636.00 53,534.46 8,762.56 39.47 82,101.54 120‐5126‐20‐01 Salaries‐Vacation Buy‐Out 2,742.00 2,742.00 5,978.80 218.05 (3,236.80) 120‐5127‐20‐01 Salaries‐Certification Pay 17,220.00 17,220.00 13,847.64 918.42 80.42 3,372.36 120‐5140‐20‐01 Salaries ‐ Longevity Pay 3,055.00 3,055.00 2,880.00 94.27 175.00 120‐5145‐20‐01 Social Security Expense 51,993.00 51,993.00 49,092.67 4,633.29 94.42 2,900.33 120‐5150‐20‐01 Medicare Expense 12,160.00 12,160.00 11,481.35 1,083.58 94.42 678.65 120‐5155‐20‐01 SUTA Expense 1,944.00 1,944.00 1,440.00 74.07 504.00 120‐5160‐20‐01 Health Insurance 115,788.00 115,788.00 86,868.89 9,450.90 75.02 28,919.11 120‐5165‐20‐01 Dental Insurance 5,280.00 5,280.00 4,300.02 436.28 81.44 979.98 120‐5170‐20‐01 Life Insurance/AD&D 4,502.00 4,502.00 3,704.31 375.12 82.28 797.69 120‐5175‐20‐01 Liability (TML) Workers' Comp 15,179.00 15,179.00 19,464.52 1,971.91 128.23 (4,285.52) 120‐5180‐20‐01 TMRS Expense 113,629.00 113,629.00 111,975.87 10,625.37 98.55 1,653.13 120‐5185‐20‐01 Long/Short Term Disability 1,550.00 1,550.00 1,260.98 126.59 81.35 289.02 120‐5186‐20‐01 WELLE‐Wellness Prog Reimb Empl 2,400.00 2,400.00 973.24 89.16 40.55 1,426.76 120‐5191‐20‐01 Hiring Cost 35.52 ‐ (35.52) Subtotal object ‐ 05 1,308,204.00 18,951.00 1,327,155.00 1,116,474.02 107,176.86 84.13 210,680.98 120‐5410‐20‐01 Professional Services 544.53 ‐ (544.53) Subtotal object ‐ 05 544.53 ‐ (544.53) Program number: 1 OPERATIONS 1,308,204.00 18,951.00 1,327,155.00 1,117,018.55 107,176.86 84.17 210,136.45 Department number: 20 POLICE 1,308,204.00 18,951.00 1,327,155.00 1,117,018.55 107,176.86 84.17 210,136.45 Expense Subtotal ‐ ‐ ‐ ‐ ‐ ‐ 1,308,204.00 18,951.00 1,327,155.00 1,117,018.55 107,176.86 84.17 210,136.45 Fund number: 120 POLICE SPD (35,000.00) 18,951.00 (16,049.00) (298,117.60) (69,523.63) 282,068.60 130‐4120‐30‐01 Sales Taxes (1,338,204.00) (1,338,204.00) (1,411,907.79) (176,090.02) 105.51 73,703.79 Subtotal object ‐ 04 (1,338,204.00) (1,338,204.00) (1,411,907.79) (176,090.02) 105.51 73,703.79 130‐4610‐30‐01 Interest Income (5,000.00) (5,000.00) ‐ (5,000.00) Subtotal object ‐ 04 (5,000.00) (5,000.00) ‐ (5,000.00) Program number: 1 OPERATIONS (1,343,204.00) (1,343,204.00) (1,411,907.79) (176,090.02) 105.12 68,703.79 Department number: 30 FIRE (1,343,204.00) (1,343,204.00) (1,411,907.79) (176,090.02) 105.12 68,703.79 Revenue Subtotal ‐ ‐ ‐ ‐ ‐ ‐ (1,343,204.00) (1,343,204.00) (1,411,907.79) (176,090.02) 105.12 68,703.79 130‐5110‐30‐01 Salaries & Wages 816,877.00 18,070.00 834,947.00 770,745.73 63,037.34 92.31 64,201.27 130‐5115‐30‐01 Salaries ‐ Overtime 134,415.00 134,415.00 120,383.96 10,804.03 89.56 14,031.04 130‐5116‐30‐01 Salaries ‐ FLSA Overtime 15,180.50 1,182.21 ‐ (15,180.50) 130‐5127‐30‐01 Salaries‐Certification Pay 11,280.00 11,280.00 9,777.77 803.08 86.68 1,502.23 130‐5140‐30‐01 Salaries ‐ Longevity Pay 2,090.00 2,090.00 1,830.00 87.56 260.00 130‐5145‐30‐01 Social Security Expense 50,883.00 50,883.00 52,539.54 4,299.32 103.26 (1,656.54) 130‐5150‐30‐01 Medicare Expense 11,901.00 11,901.00 12,287.45 1,005.48 103.25 (386.45) 130‐5155‐30‐01 SUTA Expense 1,944.00 1,944.00 1,728.00 88.89 216.00 130‐5160‐30‐01 Health Insurance 141,558.00 141,558.00 139,048.52 11,544.22 98.23 2,509.48 130‐5165‐30‐01 Dental Insurance 4,869.00 4,869.00 4,776.37 444.44 98.10 92.63 130‐5170‐30‐01 Life Insurance/AD&D 4,502.00 4,502.00 4,126.32 375.12 91.66 375.68 130‐5175‐30‐01 Liability (TML) Workers' Comp 12,147.00 12,147.00 21,833.36 2,038.77 179.74 (9,686.36) 39Page 56Item 3.
130‐5180‐30‐01 TMRS Expense 111,204.00 111,204.00 124,765.62 10,311.40 112.20 (13,561.62) 130‐5185‐30‐01 Long/Short Term Disability 1,534.00 1,534.00 1,281.77 113.42 83.56 252.23 130‐5186‐30‐01 WELLE‐Wellness Prog Reimb Empl 3,000.00 3,000.00 3,370.26 328.32 112.34 (370.26) Subtotal object ‐ 05 1,308,204.00 18,070.00 1,326,274.00 1,283,675.17 106,287.15 96.79 42,598.83 130‐5410‐30‐01 Professional Services 544.53 ‐ (544.53) Subtotal object ‐ 05 544.53 ‐ (544.53) Program number: 1 OPERATIONS 1,308,204.00 18,070.00 1,326,274.00 1,284,219.70 106,287.15 96.83 42,054.30 Department number: 30 FIRE 1,308,204.00 18,070.00 1,326,274.00 1,284,219.70 106,287.15 96.83 42,054.30 Expense Subtotal ‐ ‐ ‐ ‐ ‐ ‐ 1,308,204.00 18,070.00 1,326,274.00 1,284,219.70 106,287.15 96.83 42,054.30 Fund number: 130 FIRE SPD (35,000.00) 18,070.00 (16,930.00) (127,688.09) (69,802.87) 754.21 110,758.09 150‐4015‐10‐00 Water Impact Fees (100,000.00) (100,000.00) (294,810.00) 294.81 194,810.00 150‐4020‐10‐00 Wastewater Impact Fees (50,000.00) (50,000.00) (189,442.00) 378.88 139,442.00 150‐4040‐10‐00 East Thoroughfare Impact Fees (200,000.00) (200,000.00) (1,100,052.96) 550.03 900,052.96 Subtotal object ‐ 04 (350,000.00) (350,000.00) (1,584,304.96) 452.66 1,234,304.96 150‐4110‐10‐00 Property Taxes (Town) (387,624.00) (387,624.00) (386,349.34) 99.67 (1,274.66) 150‐4111‐10‐00 Property Taxes (County) (110,960.00) (110,960.00) (92,846.44) 83.68 (18,113.56) 150‐4120‐10‐00 Sales Taxes (Town) (495,372.00) (495,372.00) (468,863.80) (53,267.25) 94.65 (26,508.20) 150‐4121‐10‐00 Sales Taxes (PEDC) (415,259.00) (415,259.00) (392,673.42) (44,611.32) 94.56 (22,585.58) Subtotal object ‐ 04 (1,409,215.00) (1,409,215.00) (1,340,733.00) (97,878.57) 95.14 (68,482.00) 150‐4610‐10‐00 Interest Income (7,500.00) (7,500.00) (20,356.04) (285.00) 271.41 12,856.04 Subtotal object ‐ 04 (7,500.00) (7,500.00) (20,356.04) (285.00) 271.41 12,856.04 150‐4805‐10‐00 380 Rollback Taxes (28,839.78) ‐ 28,839.78 Subtotal object ‐ 04 (28,839.78) ‐ 28,839.78 Program number: DEFAULT PROGRAM (1,766,715.00) (1,766,715.00) (2,974,233.78) (98,163.57) 168.35 1,207,518.78 Department number: 10 ADMINISTRATION (1,766,715.00) (1,766,715.00) (2,974,233.78) (98,163.57) 168.35 1,207,518.78 Revenue Subtotal ‐ ‐ ‐ ‐ ‐ ‐ (1,766,715.00) (1,766,715.00) (2,974,233.78) (98,163.57) 168.35 1,207,518.78 150‐5805‐10‐00 380 Rollback Taxes Rebate 29,097.93 ‐ (29,097.93) 150‐5810‐10‐00 Thoro Impact Fee Rebate 1,109,899.57 ‐ (1,109,899.57) 150‐5811‐10‐00 Water Impact Fee Rebate 297,448.85 ‐ (297,448.85) 150‐5812‐10‐00 Wastwater Impact Fee Rebate 191,137.70 ‐ (191,137.70) 150‐5815‐10‐00 Town Sales Tax Rebate 396,891.54 ‐ (396,891.54) 150‐5816‐10‐00 PEDC Sales Tax Rebate 332,396.65 ‐ (332,396.65) 150‐5820‐10‐00 Town Ad Valorem Tax Rebate 1,766,715.00 1,766,715.00 389,807.57 22.06 1,376,907.43 150‐5821‐10‐00 County Ad Valorem Tax Rebate 93,901.29 ‐ (93,901.29) Subtotal object ‐ 05 1,766,715.00 1,766,715.00 2,840,581.10 160.78 (1,073,866.10) Program number: DEFAULT PROGRAM 1,766,715.00 1,766,715.00 2,840,581.10 160.78 (1,073,866.10) Department number: 10 ADMINISTRATION 1,766,715.00 1,766,715.00 2,840,581.10 160.78 (1,073,866.10) Expense Subtotal ‐ ‐ ‐ ‐ ‐ ‐ 1,766,715.00 1,766,715.00 2,840,581.10 160.78 (1,073,866.10) Fund number: 150 TIRZ #1 ‐ BLUE STAR (133,652.68) (98,163.57) ‐ 133,652.68 160‐4041‐10‐00 W Thoro Impact Fee (325,500.00) (325,500.00) ‐ (325,500.00) Subtotal object ‐ 04 (325,500.00) (325,500.00) ‐ (325,500.00) 160‐4110‐10‐00 Property Taxes (Town) (12,633.00) (12,633.00) (12,632.58) 100.00 (0.42) 160‐4111‐10‐00 Property Taxes (County) (3,616.00) (3,616.00) (3,137.06) 86.76 (478.94) 160‐4120‐10‐00 Sales Taxes (Town) (150.00) (150.00) (8.12) (0.05) 5.41 (141.88) 160‐4121‐10‐00 Sales Taxes (PEDC) (150.00) (150.00) (8.12) (0.05) 5.41 (141.88) Subtotal object ‐ 04 (16,549.00) (16,549.00) (15,785.88) (0.10) 95.39 (763.12) 160‐4610‐10‐00 Interest Income (500.00) (500.00) (497.55) (30.11) 99.51 (2.45) Subtotal object ‐ 04 (500.00) (500.00) (497.55) (30.11) 99.51 (2.45) Program number: DEFAULT PROGRAM (342,549.00) (342,549.00) (16,283.43) (30.21) 4.75 (326,265.57) Department number: 10 ADMINISTRATION (342,549.00) (342,549.00) (16,283.43) (30.21) 4.75 (326,265.57) Revenue Subtotal ‐ ‐ ‐ ‐ ‐ ‐ (342,549.00) (342,549.00) (16,283.43) (30.21) 4.75 (326,265.57) 160‐5810‐10‐00 W Thoro Impact Fee Rebate 342,549.00 342,549.00 432.30 0.13 342,116.70 160‐5815‐10‐00 Town Sales Tax Rebate 14.59 ‐ (14.59) 160‐5816‐10‐00 PEDC Sales Tax Rebate 14.59 ‐ (14.59) 160‐5820‐10‐00 Town Ad Valorem Tax Rebate 12,851.02 ‐ (12,851.02) 160‐5821‐10‐00 County Ad Valorem Tax Rebate 3,191.30 ‐ (3,191.30) 40Page 57Item 3.
Subtotal object ‐ 05 342,549.00 342,549.00 16,503.80 4.82 326,045.20 Program number: DEFAULT PROGRAM 342,549.00 342,549.00 16,503.80 4.82 326,045.20 Department number: 10 ADMINISTRATION 342,549.00 342,549.00 16,503.80 4.82 326,045.20 Expense Subtotal ‐ ‐ ‐ ‐ ‐ ‐ 342,549.00 342,549.00 16,503.80 4.82 326,045.20 Fund number: 160 TIRZ #2 ‐ MATTHEWS SOUTHWEST 220.37 (30.21) ‐ (220.37) 200‐4000‐10‐08 W/S Service Initiation (82,400.00) (82,400.00) (98,185.00) (14,080.00) 119.16 15,785.00 200‐4007‐10‐08 Sanitation (1,377,830.00) (1,377,830.00) (1,279,730.08) (125,829.15) 92.88 (98,099.92) 200‐4009‐10‐08 Late Fee‐W/S (112,200.00) (112,200.00) (50,182.03) 44.73 (62,017.97) Subtotal object ‐ 04 (1,572,430.00) (1,572,430.00) (1,428,097.11) (139,909.15) 90.82 (144,332.89) Program number: 8 UTILITY BILLING (1,572,430.00) (1,572,430.00) (1,428,097.11) (139,909.15) 90.82 (144,332.89) 200‐4200‐10‐99 T‐Mobile Fees (39,795.00) (39,795.00) (68,200.66) (6,200.06) 171.38 28,405.66 200‐4201‐10‐99 Tierone Converged Network (22,777.00) (22,777.00) (20,878.00) (1,898.00) 91.66 (1,899.00) 200‐4205‐10‐99 Rise Broadband (27,376.00) (27,376.00) (12,942.18) (1,140.66) 47.28 (14,433.82) 200‐4206‐10‐99 Verizon Antennae Lease (66,805.00) (66,805.00) (63,921.25) (2,883.75) 95.68 (2,883.75) Subtotal object ‐ 04 (156,753.00) (156,753.00) (165,942.09) (12,122.47) 105.86 9,189.09 200‐4930‐10‐99 Insurance Proceeds (4,641.48) ‐ 4,641.48 200‐4995‐10‐99 Transfer In/Out (8,715.00) ‐ 8,715.00 Subtotal object ‐ 04 (13,356.48) ‐ 13,356.48 Program number: 99 NON‐DEPARTMENTAL (156,753.00) (156,753.00) (179,298.57) (12,122.47) 114.38 22,545.57 Department number: 10 ADMINISTRATION (1,729,183.00) (1,729,183.00) (1,607,395.68) (152,031.62) 92.96 (121,787.32) 200‐4005‐50‐02 Water Revenue (12,823,413.00) (12,823,413.00) (11,684,966.27) (1,948,821.93) 91.12 (1,138,446.73) 200‐4010‐50‐02 Connection Tap & Construction (800,000.00) (800,000.00) (848,503.00) (79,250.00) 106.06 48,503.00 200‐4012‐50‐02 Saturday Inspection Fee (2,500.00) (2,500.00) (9,450.00) (300.00) 378.00 6,950.00 200‐4018‐50‐02 Internet Cr. Card Fees (89,622.29) (10,675.03) ‐ 89,622.29 200‐4019‐50‐02 Cr. Card Pmt Fees (28,499.79) (3,444.16) ‐ 28,499.79 200‐4060‐50‐02 NSF Fees (1,675.00) (1,675.00) (1,825.00) (225.00) 108.96 150.00 Subtotal object ‐ 04 (13,627,588.00) (13,627,588.00) (12,662,866.35) (2,042,716.12) 92.92 (964,721.65) 200‐4243‐50‐02 Backflow Prevention Inspection (51,758.00) (51,758.00) (46,305.00) (3,430.00) 89.46 (5,453.00) Subtotal object ‐ 04 (51,758.00) (51,758.00) (46,305.00) (3,430.00) 89.46 (5,453.00) 200‐4610‐50‐02 Interest Income (142,024.00) (142,024.00) (126,739.28) (8,320.63) 89.24 (15,284.72) Subtotal object ‐ 04 (142,024.00) (142,024.00) (126,739.28) (8,320.63) 89.24 (15,284.72) 200‐4910‐50‐02 Other Revenue (2,351,275.00) (1,092,482.00) (3,443,757.00) (250,439.76) (27,618.14) 7.27 (3,193,317.24) Subtotal object ‐ 04 (2,351,275.00) (1,092,482.00) (3,443,757.00) (250,439.76) (27,618.14) 7.27 (3,193,317.24) Program number: 2 WATER (16,172,645.00) (1,092,482.00) (17,265,127.00) (13,086,350.39) (2,082,084.89) 75.80 (4,178,776.61) 200‐4006‐50‐03 Sewer (6,751,798.00) (6,751,798.00) (6,300,221.81) (608,672.43) 93.31 (451,576.19) 200‐4010‐50‐03 Connection Tap & Construction (300,000.00) (300,000.00) (374,600.00) (33,200.00) 124.87 74,600.00 Subtotal object ‐ 04 (7,051,798.00) (7,051,798.00) (6,674,821.81) (641,872.43) 94.65 (376,976.19) 200‐4930‐50‐03 Insurance Claim Proceeds (9,157.27) (9,157.27) ‐ 9,157.27 Subtotal object ‐ 04 (9,157.27) (9,157.27) ‐ 9,157.27 Program number: 3 WASTEWATER (7,051,798.00) (7,051,798.00) (6,683,979.08) (651,029.70) 94.78 (367,818.92) Department number: 50 PUBLIC WORKS (23,224,443.00) (1,092,482.00) (24,316,925.00) (19,770,329.47) (2,733,114.59) 81.30 (4,546,595.53) Revenue Subtotal ‐ ‐ ‐ ‐ ‐ ‐ (24,953,626.00) (1,092,482.00) (26,046,108.00) (21,377,725.15) (2,885,146.21) 82.08 (4,668,382.85) 200‐5110‐10‐08 Salaries & Wages 196,018.00 3,327.83 199,345.83 178,417.67 14,975.69 89.50 20,928.16 200‐5115‐10‐08 Salaries ‐ Overtime 3,500.00 3,500.00 878.61 25.10 2,621.39 200‐5140‐10‐08 Salaries ‐ Longevity Pay 1,550.00 1,550.00 765.00 49.36 785.00 200‐5143‐10‐08 Cell Phone Allowance 600.00 60.00 ‐ (600.00) 200‐5145‐10‐08 Social Security Expense 12,467.00 12,467.00 10,781.25 894.25 86.48 1,685.75 200‐5150‐10‐08 Medicare Expense 2,916.00 2,916.00 2,521.45 209.14 86.47 394.55 200‐5155‐10‐08 SUTA Expense 648.00 648.00 577.67 89.15 70.33 200‐5160‐10‐08 Health Insurance 28,078.00 28,078.00 27,102.60 2,259.60 96.53 975.40 200‐5165‐10‐08 Dental Insurance 1,712.00 1,712.00 1,531.14 138.66 89.44 180.86 200‐5170‐10‐08 Life Insurance/AD&D 451.00 451.00 412.50 37.50 91.46 38.50 200‐5175‐10‐08 Liability (TML)/Workers' Comp 376.00 376.00 451.80 40.68 120.16 (75.80) 200‐5180‐10‐08 TMRS Expense 26,771.00 26,771.00 24,517.64 2,039.77 91.58 2,253.36 200‐5185‐10‐08 Long/Short Term Disability 373.00 373.00 309.00 28.44 82.84 64.00 200‐5186‐10‐08 WELLE‐Wellness Prog Reimb‐Empl 1,200.00 1,200.00 980.76 89.16 81.73 219.24 41Page 58Item 3.
Subtotal object ‐ 05 276,060.00 3,327.83 279,387.83 249,847.09 20,772.89 89.43 29,540.74 200‐5210‐10‐08 Office Supplies 2,562.00 2,562.00 2,879.99 212.59 112.41 (317.99) 200‐5220‐10‐08 Office Equipment 2,324.00 2,324.00 2,726.97 276.00 117.34 (678.97) 200‐5230‐10‐08 Dues,Fees,& Subscriptions 100.00 100.00 ‐ 100.00 200‐5240‐10‐08 Postage and Delivery 44,000.00 44,000.00 47,505.93 4,509.10 107.97 (3,505.93) 200‐5280‐10‐08 Printing and Reproduction 4,330.00 4,330.00 2,222.73 857.08 51.33 2,107.27 200‐5290‐10‐08 Other Charges and Services 600.00 600.00 546.00 91.00 54.00 Subtotal object ‐ 05 53,916.00 53,916.00 55,881.62 5,578.77 276.00 103.65 (2,241.62) 200‐5330‐10‐08 Copier Expense 3,276.00 3,276.00 1,286.70 39.28 1,989.30 Subtotal object ‐ 05 3,276.00 3,276.00 1,286.70 39.28 1,989.30 200‐5400‐10‐08 Uniform Expense 225.00 225.00 210.53 93.57 14.47 200‐5418‐10‐08 IT Fees 8,000.00 8,000.00 9,993.00 594.50 124.91 (1,993.00) 200‐5419‐10‐08 IT Licenses 10,300.00 10,300.00 16,400.00 ‐ (6,100.00) 200‐5430‐10‐08 Legal Fees 2,500.00 2,500.00 152.00 6.08 2,348.00 200‐5470‐10‐08 Trash Collection 1,375,000.00 1,375,000.00 1,128,244.40 123,238.88 82.05 246,755.60 200‐5475‐10‐08 CREDIT CARD FEES 126,000.00 126,000.00 135,718.19 15,590.60 107.71 (9,718.19) 200‐5479‐10‐08 Household Haz. Waste Disposal 7,800.00 7,800.00 5,780.00 1,000.00 74.10 2,020.00 200‐5480‐10‐08 Contracted Services 33,963.00 33,963.00 7,600.00 38,500.00 22.38 (12,137.00) Subtotal object ‐ 05 1,563,788.00 1,563,788.00 1,287,698.12 140,423.98 54,900.00 82.35 221,189.88 200‐5520‐10‐08 Telephones 500.00 500.00 ‐ 500.00 200‐5530‐10‐08 Travel 1,735.00 1,735.00 ‐ 1,735.00 200‐5533‐10‐08 Mileage Expense 265.00 265.00 ‐ 265.00 200‐5536‐10‐08 Training/Seminars 1,050.00 1,050.00 ‐ 1,050.00 Subtotal object ‐ 05 3,550.00 3,550.00 ‐ 3,550.00 200‐5600‐10‐08 Special Events 900.00 900.00 698.00 77.56 202.00 Subtotal object ‐ 05 900.00 900.00 698.00 77.56 202.00 200‐7145‐10‐08 Transfer to VERF 1,438.00 1,438.00 1,318.13 119.83 91.66 119.87 200‐7147‐10‐08 Transfer to GF 43,494.00 43,494.00 39,869.50 3,624.50 91.67 3,624.50 Subtotal object ‐ 07 44,932.00 44,932.00 41,187.63 3,744.33 91.67 3,744.37 Program number: 8 UTILITY BILLING 1,946,422.00 3,327.83 1,949,749.83 1,636,599.16 170,519.97 55,176.00 83.94 257,974.67 200‐5110‐10‐99 Salaries & Wages (36,777.00) (19,903.00) (56,680.00) ‐ (56,680.00) 200‐5176‐10‐99 TML‐Prop & Liab Insurance 60,000.00 60,000.00 76,033.79 126.72 (16,033.79) Subtotal object ‐ 05 23,223.00 (19,903.00) 3,320.00 76,033.79 (72,713.79) 200‐5295‐10‐99 General Fund Franchise Fee 339,271.00 339,271.00 310,998.38 28,272.58 91.67 28,272.62 Subtotal object ‐ 05 339,271.00 339,271.00 310,998.38 28,272.58 91.67 28,272.62 200‐5410‐10‐99 Professional Services 25,000.00 25,000.00 24,880.00 99.52 120.00 200‐5415‐10‐99 Tuition Reimbursement 7,233.00 7,233.00 1,136.42 15.71 6,096.58 200‐5480‐10‐99 Contracted Services 5,800.00 5,800.00 ‐ 5,800.00 Subtotal object ‐ 05 38,033.00 38,033.00 26,016.42 68.41 12,016.58 200‐5930‐10‐99 Damage Claims Expense 8,941.92 ‐ (8,941.92) Subtotal object ‐ 05 8,941.92 ‐ (8,941.92) 200‐6186‐10‐99 2013 Bond Payment 225,000.00 225,000.00 225,000.00 225,000.00 100.00 200‐6193‐10‐99 2012 CO Bond Payment 298,800.00 298,800.00 298,800.00 100.00 Subtotal object ‐ 06 523,800.00 523,800.00 523,800.00 225,000.00 100.00 200‐6200‐10‐99 Bond Issuance Costs 750.00 310.00 ‐ (750.00) 200‐6201‐10‐99 2014 GO Bond Payment 385,000.00 385,000.00 385,000.00 385,000.00 100.00 200‐6202‐10‐99 2014 CO Bond Payment 505,000.00 505,000.00 505,000.00 505,000.00 100.00 200‐6203‐10‐99 2015 GO Debt payment 324,900.00 324,900.00 324,900.00 100.00 200‐6205‐10‐99 2016 GO Bond Payment 68,500.00 68,500.00 68,500.00 100.00 200‐6209‐10‐99 2018 GO Bond Payment 330,000.00 330,000.00 ‐ 330,000.00 200‐6210‐10‐99 2018 CO Bond Payment 330,000.00 ‐ (330,000.00) 200‐6211‐10‐99 2019 CO Debt Payment 327,247.00 327,247.00 327,247.00 100.00 200‐6299‐10‐99 Bond Interest Expense 1,465,790.00 1,465,790.00 1,465,791.50 647,967.25 100.00 (1.50) Subtotal object ‐ 06 3,406,437.00 3,406,437.00 3,407,188.50 1,538,277.25 100.02 (751.50) 200‐7000‐10‐99 Contingency 50,000.00 50,000.00 18,875.00 13,375.00 27,017.50 37.75 4,107.50 Subtotal object ‐ 07 50,000.00 50,000.00 18,875.00 13,375.00 27,017.50 37.75 4,107.50 42Page 59Item 3.
Program number: 99 NON‐DEPARTMENTAL 4,380,764.00 (19,903.00) 4,360,861.00 4,371,854.01 1,804,924.83 27,017.50 100.25 (38,010.51) Department number: 10 ADMINISTRATION 6,327,186.00 (16,575.17) 6,310,610.83 6,008,453.17 1,975,444.80 82,193.50 95.21 219,964.16 200‐5110‐50‐02 Salaries & Wages 1,186,709.00 29,787.39 1,216,496.39 1,086,872.23 89,444.51 89.34 129,624.16 200‐5115‐50‐02 Salaries ‐ Overtime 38,400.00 38,400.00 65,812.89 5,300.28 171.39 (27,412.89) 200‐5126‐50‐02 Salaries‐Vacation Buy‐Out 1,822.00 1,822.00 1,727.20 94.80 94.80 200‐5140‐50‐02 Salaries ‐ Longevity Pay 4,955.00 4,955.00 4,685.00 94.55 270.00 200‐5143‐50‐02 Cell Phone Allowance 420.00 60.00 ‐ (420.00) 200‐5145‐50‐02 Social Security Expense 76,377.00 76,377.00 68,772.85 5,560.49 90.04 7,604.15 200‐5150‐50‐02 Medicare Expense 17,863.00 17,863.00 16,143.23 1,300.46 90.37 1,719.77 200‐5155‐50‐02 SUTA Expense 4,050.00 4,050.00 3,448.61 85.15 601.39 200‐5160‐50‐02 Health Insurance 183,134.00 183,134.00 154,261.10 13,989.30 84.23 28,872.90 200‐5165‐50‐02 Dental Insurance 7,981.00 7,981.00 7,827.06 746.18 98.07 153.94 200‐5170‐50‐02 Life Insurance/AD&D 2,432.00 2,432.00 2,250.21 198.48 92.53 181.79 200‐5175‐50‐02 Liability (TML)/Workers' Comp 25,487.00 25,487.00 32,066.42 2,880.24 125.82 (6,579.42) 200‐5180‐50‐02 TMRS Expense 166,921.00 166,921.00 157,731.00 12,878.25 94.49 9,190.00 200‐5185‐50‐02 Long/Short Term Disability 2,255.00 2,255.00 1,826.87 160.31 81.01 428.13 200‐5186‐50‐02 WELLE‐Wellness Prog Reimb‐Empl 7,650.00 7,650.00 4,026.90 367.48 52.64 3,623.10 Subtotal object ‐ 05 1,726,036.00 29,787.39 1,755,823.39 1,607,871.57 132,885.98 91.57 147,951.82 200‐5210‐50‐02 Office Supplies 2,900.00 2,900.00 2,128.84 19.10 73.41 771.16 200‐5212‐50‐02 Building Supplies 3,800.00 3,800.00 3,905.91 151.20 102.79 (105.91) 200‐5220‐50‐02 Office Equipment 12,230.00 12,230.00 7,385.65 60.39 4,844.35 200‐5230‐50‐02 Dues,Fees,& Subscriptions 16,500.00 16,500.00 30,471.38 1,166.00 184.68 (13,971.38) 200‐5240‐50‐02 Postage and Delivery 1,000.00 1,000.00 425.55 23.00 42.56 574.45 200‐5260‐50‐02 Advertising 238.76 ‐ (238.76) 200‐5280‐50‐02 Printing and Reproduction 1,500.00 1,500.00 466.02 31.07 1,033.98 200‐5290‐50‐02 Other Charges and Services 61.48 ‐ (61.48) Subtotal object ‐ 05 37,930.00 37,930.00 45,083.59 1,359.30 118.86 (7,153.59) 200‐5310‐50‐02 Rental Expense 10,000.00 10,000.00 8,495.43 84.95 1,504.57 200‐5320‐50‐02 Repairs & Maintenance 3,600.00 3,600.00 162.84 4.52 3,437.16 200‐5330‐50‐02 Copier Expense 1,700.00 1,700.00 1,221.99 71.88 478.01 200‐5340‐50‐02 Building Repairs 35,000.00 35,000.00 845.71 2.42 34,154.29 200‐5350‐50‐02 Vehicle Expense 23,629.00 23,629.00 24,973.93 79.21 105.69 (1,344.93) 200‐5351‐50‐02 Equipment Expense/Repair 11,700.00 11,700.00 15,666.40 3,342.32 133.90 (3,966.40) 200‐5352‐50‐02 Fuel 24,300.00 24,300.00 21,266.80 87.52 3,033.20 200‐5353‐50‐02 Oil/Grease/Inspections 1,380.00 1,380.00 105.50 7.65 1,274.50 Subtotal object ‐ 05 111,309.00 111,309.00 72,738.60 3,421.53 65.35 38,570.40 200‐5400‐50‐02 Uniform Expense 17,750.00 17,750.00 17,500.13 3,005.89 98.59 249.87 200‐5410‐50‐02 Professional Services 6,000.00 (6,000.00) ‐ 200‐5419‐50‐02 IT Licenses 41,240.00 9,000.00 50,240.00 30,249.00 28,500.00 60.21 (8,509.00) 200‐5430‐50‐02 Legal Fees 500.00 500.00 322.99 64.60 177.01 200‐5480‐50‐02 Contracted Services 205,578.00 (25,105.59) 180,472.41 82,539.70 18,854.05 32,046.00 45.74 65,886.71 Subtotal object ‐ 05 271,068.00 (22,105.59) 248,962.41 130,611.82 21,859.94 60,546.00 52.46 57,804.59 200‐5520‐50‐02 Telephones 10,160.00 10,160.00 8,817.17 86.78 1,342.83 200‐5523‐50‐02 Water/Sewer Charges 6,000.00 6,000.00 5,520.14 505.63 92.00 479.86 200‐5524‐50‐02 Gas 2,000.00 2,000.00 608.36 30.42 1,391.64 200‐5525‐50‐02 Electricity 309,000.00 309,000.00 271,173.52 40,281.76 87.76 37,826.48 200‐5526‐50‐02 Data Network 4,000.00 4,000.00 8,739.99 1,265.15 218.50 (4,739.99) 200‐5530‐50‐02 Travel 2,300.00 2,300.00 384.80 16.73 1,915.20 200‐5533‐50‐02 Mileage Expense 100.00 100.00 ‐ 100.00 200‐5536‐50‐02 Training/Seminars 22,200.00 22,200.00 12,319.96 2,010.00 55.50 9,880.04 200‐5540‐50‐02 Water Testing 13,225.00 13,225.00 12,621.49 1,040.00 95.44 603.51 200‐5545‐50‐02 Meter Purchases 422,900.00 190,000.00 612,900.00 324,886.68 71,484.55 334,061.37 53.01 (46,048.05) 200‐5550‐50‐02 Water Purchases 5,690,642.00 (100,000.00) 5,590,642.00 4,338,538.24 433,854.00 77.60 1,252,103.76 Subtotal object ‐ 05 6,482,527.00 90,000.00 6,572,527.00 4,983,610.35 550,441.09 334,061.37 75.83 1,254,855.28 200‐5600‐50‐02 Special Events 8,000.00 8,000.00 1,423.42 17.79 6,576.58 200‐5620‐50‐02 Tools & Equipment 14,000.00 14,000.00 16,639.79 3,616.20 118.86 (2,639.79) 43Page 60Item 3.
200‐5630‐50‐02 Safety Equipment 12,500.00 12,500.00 10,136.24 3,134.94 81.09 2,363.76 200‐5640‐50‐02 Signs & Hardware 1,000.00 1,000.00 1,156.93 115.69 (156.93) 200‐5650‐50‐02 Maintenance Materials 7,000.00 7,000.00 3,845.94 54.94 3,154.06 200‐5660‐50‐02 Chemical Supplies 17,800.00 17,800.00 25,002.06 1,729.48 140.46 (7,202.06) 200‐5670‐50‐02 System Improvements 206,000.00 (122,126.75) 83,873.25 85,754.21 4,781.39 102.24 (1,880.96) Subtotal object ‐ 05 266,300.00 (122,126.75) 144,173.25 143,958.59 13,262.01 99.85 214.66 200‐6110‐50‐02 Capital Expenditure 54,232.34 54,232.34 43,632.34 10,600.00 80.45 200‐6160‐50‐02 Capital Expense‐Vehicles 81,736.00 81,736.00 83,313.45 101.93 (1,577.45) Subtotal object ‐ 06 81,736.00 54,232.34 135,968.34 126,945.79 10,600.00 93.36 (1,577.45) 200‐7145‐50‐02 Transfer to VERF 225,192.00 225,192.00 206,426.00 18,766.00 91.67 18,766.00 200‐7147‐50‐02 Transfer to GF 640,504.00 640,504.00 587,128.63 53,375.33 91.67 53,375.37 Subtotal object ‐ 07 865,696.00 865,696.00 793,554.63 72,141.33 91.67 72,141.37 Program number: 2 WATER 9,842,602.00 29,787.39 9,872,389.39 7,904,374.94 795,371.18 405,207.37 80.07 1,562,807.08 200‐5110‐50‐03 Salaries & Wages 557,709.00 18,925.61 576,634.61 459,829.43 42,113.73 79.74 116,805.18 200‐5115‐50‐03 Salaries ‐ Overtime 25,700.00 25,700.00 24,738.83 1,762.90 96.26 961.17 200‐5126‐50‐03 Salaries‐Vacation Buy‐Out 2,210.00 2,210.00 4,066.60 184.01 (1,856.60) 200‐5140‐50‐03 Salaries ‐ Longevity Pay 1,990.00 1,990.00 1,825.00 91.71 165.00 200‐5143‐50‐03 Cell Phone Allowance 360.00 60.00 ‐ (360.00) 200‐5145‐50‐03 Social Security Expense 36,432.00 36,432.00 28,069.95 2,461.27 77.05 8,362.05 200‐5150‐50‐03 Medicare Expense 8,520.00 8,520.00 6,564.76 575.61 77.05 1,955.24 200‐5155‐50‐03 SUTA Expense 2,268.00 2,268.00 2,011.36 88.68 256.64 200‐5160‐50‐03 Health Insurance 136,252.00 136,252.00 97,211.62 8,299.00 71.35 39,040.38 200‐5165‐50‐03 Dental Insurance 5,041.00 5,041.00 4,028.10 402.50 79.91 1,012.90 200‐5170‐50‐03 Life Insurance/AD&D 1,423.00 1,423.00 1,193.93 121.94 83.90 229.07 200‐5175‐50‐03 Liability (TML)/Workers' Comp 11,208.00 11,208.00 13,402.32 1,252.77 119.58 (2,194.32) 200‐5180‐50‐03 TMRS Expense 79,621.00 79,621.00 66,626.28 5,959.72 83.68 12,994.72 200‐5185‐50‐03 Long/Short Term Disability 1,060.00 1,060.00 756.20 75.32 71.34 303.80 200‐5186‐50‐03 WELLE‐Wellness Prog Reimb‐Empl 3,300.00 3,300.00 1,530.76 139.16 46.39 1,769.24 Subtotal object ‐ 05 872,734.00 18,925.61 891,659.61 712,215.14 63,223.92 79.88 179,444.47 200‐5210‐50‐03 Office Supplies 2,300.00 2,300.00 741.81 32.25 1,558.19 200‐5212‐50‐03 Building Supplies 600.00 600.00 1,073.81 178.97 (473.81) 200‐5220‐50‐03 Office Equipment 500.00 500.00 132.45 26.49 367.55 200‐5230‐50‐03 Dues,Fees,& Subscriptions 19,800.00 19,800.00 1,888.50 279.00 9.54 17,911.50 200‐5240‐50‐03 Postage and Delivery 900.00 900.00 14.98 1.66 885.02 200‐5280‐50‐03 Printing and Reproduction 50.00 ‐ (50.00) Subtotal object ‐ 05 24,100.00 24,100.00 3,901.55 279.00 16.19 20,198.45 200‐5310‐50‐03 Rental Expense 12,000.00 12,000.00 12,302.12 102.52 (302.12) 200‐5335‐50‐03 Radio/Video Repairs 500.00 500.00 375.00 75.00 125.00 200‐5340‐50‐03 Building Repairs 1,000.00 1,000.00 825.20 82.52 174.80 200‐5350‐50‐03 Vehicle Expense 16,000.00 16,000.00 17,263.97 129.69 107.90 (1,263.97) 200‐5351‐50‐03 Equipment Expense/Repair 3,000.00 3,000.00 18,265.20 7,822.15 608.84 (15,265.20) 200‐5352‐50‐03 Fuel 16,200.00 16,200.00 9,854.38 60.83 6,345.62 200‐5353‐50‐03 Oil/Grease/Inspections 1,180.00 1,180.00 145.50 80.00 12.33 1,034.50 Subtotal object ‐ 05 49,880.00 49,880.00 59,031.37 8,031.84 118.35 (9,151.37) 200‐5400‐50‐03 Uniform Expense 11,900.00 11,900.00 9,390.09 2,193.69 78.91 2,509.91 200‐5419‐50‐03 IT Licenses 13,100.00 13,100.00 13,000.00 ‐ 100.00 200‐5430‐50‐03 Legal Fees 500.00 500.00 ‐ 500.00 200‐5480‐50‐03 Contracted Services 104,465.00 2,405.34 106,870.34 14,610.09 76,844.50 13.67 15,415.75 Subtotal object ‐ 05 129,965.00 2,405.34 132,370.34 24,000.18 2,193.69 89,844.50 18.13 18,525.66 200‐5520‐50‐03 Telephones 3,850.00 3,850.00 2,790.44 72.48 1,059.56 200‐5523‐50‐03 Water/Sewer Charges 550.00 550.00 589.87 60.23 107.25 (39.87) 200‐5524‐50‐03 Gas 600.00 600.00 313.50 52.25 286.50 200‐5525‐50‐03 Electricity 45,000.00 45,000.00 31,263.06 3,815.64 69.47 13,736.94 200‐5526‐50‐03 Data Network 900.00 900.00 884.04 201.59 98.23 15.96 200‐5530‐50‐03 Travel 1,000.00 1,000.00 ‐ 1,000.00 200‐5533‐50‐03 Mileage Expense 200.00 200.00 ‐ 200.00 44Page 61Item 3.
200‐5536‐50‐03 Training/Seminars 10,800.00 10,800.00 12,455.00 1,650.00 115.32 (1,655.00) 200‐5560‐50‐03 Sewer Management Fees 3,441,392.00 3,441,392.00 2,756,421.12 166,965.00 80.10 684,970.88 Subtotal object ‐ 05 3,504,292.00 3,504,292.00 2,804,717.03 172,692.46 80.04 699,574.97 200‐5620‐50‐03 Tools & Equipment 9,000.00 9,000.00 9,433.94 403.96 104.82 (433.94) 200‐5630‐50‐03 Safety Equipment 11,000.00 11,000.00 7,302.81 2,431.97 66.39 3,697.19 200‐5650‐50‐03 Maintenance Materials 2,000.00 2,000.00 1,884.22 94.21 115.78 200‐5660‐50‐03 Chemical Supplies 1,000.00 1,000.00 1,590.60 159.06 (590.60) 200‐5670‐50‐03 System Improvements 145,000.00 145,000.00 107,555.53 6,739.67 74.18 37,444.47 200‐5680‐50‐03 Lift Station Expense 20,000.00 20,000.00 75,018.26 375.09 (55,018.26) Subtotal object ‐ 05 188,000.00 188,000.00 202,785.36 9,575.60 107.87 (14,785.36) 200‐5930‐50‐03 Damage Claims Expense 11,157.27 10,157.27 ‐ (11,157.27) Subtotal object ‐ 05 11,157.27 10,157.27 ‐ (11,157.27) 200‐6140‐50‐03 Capital Expense‐Equipment 103,000.00 4,810.66 107,810.66 81,805.62 75.88 26,005.04 200‐6160‐50‐03 Capital Expense‐Vehicles 200,000.00 200,000.00 199,752.24 ‐ 247.76 Subtotal object ‐ 06 303,000.00 4,810.66 307,810.66 81,805.62 199,752.24 26.58 26,252.80 200‐7145‐50‐03 Transfer to VERF 85,599.00 85,599.00 78,465.75 7,133.25 91.67 7,133.25 200‐7147‐50‐03 Transfer to GF 208,917.00 208,917.00 191,507.25 17,409.75 91.67 17,409.75 Subtotal object ‐ 07 294,516.00 294,516.00 269,973.00 24,543.00 91.67 24,543.00 Program number: 3 WASTEWATER 5,366,487.00 26,141.61 5,392,628.61 4,169,586.52 290,696.78 289,596.74 77.32 933,445.35 200‐5110‐50‐98 Salaries & Wages 214,858.00 9,192.17 224,050.17 175,930.95 13,027.20 78.52 48,119.22 200‐5115‐50‐98 Salaries ‐ Overtime 11,228.88 1,052.29 ‐ (11,228.88) 200‐5126‐50‐98 Salaries‐Vacation Buy‐Out 4,311.00 4,311.00 1,286.00 29.83 3,025.00 200‐5140‐50‐98 Salaries ‐ Longevity 920.00 920.00 915.00 99.46 5.00 200‐5145‐50‐98 Social Security Expense 13,646.00 13,646.00 11,101.43 797.30 81.35 2,544.57 200‐5150‐50‐98 Medicare Expense 3,192.00 3,192.00 2,596.31 186.48 81.34 595.69 200‐5155‐50‐98 SUTA Expense 648.00 648.00 576.00 88.89 72.00 200‐5160‐50‐98 Health Insurance 38,936.00 38,936.00 30,764.83 2,475.70 79.01 8,171.17 200‐5165‐50‐98 Dental Insurance 1,339.00 1,339.00 1,239.26 111.54 92.55 99.74 200‐5170‐50‐98 Life Insurance/ADD 902.00 902.00 328.30 28.14 36.40 573.70 200‐5175‐50‐98 Liability (TML)/Workers Comp 7,848.00 7,848.00 2,998.17 170.29 38.20 4,849.83 200‐5180‐50‐98 TMRS Expense 29,822.00 29,822.00 26,205.49 1,919.90 87.87 3,616.51 200‐5185‐50‐98 Long/Short Term Disability 409.00 409.00 308.94 24.75 75.54 100.06 200‐5186‐50‐98 WELLE‐Wellness Prog Reimb Empl 1,800.00 1,800.00 1,108.74 100.00 61.60 691.26 Subtotal object ‐ 05 318,631.00 9,192.17 327,823.17 266,588.30 19,893.59 81.32 61,234.87 200‐5210‐50‐98 Office Supplies 400.00 400.00 406.31 21.91 101.58 (6.31) 200‐5220‐50‐98 Office Equipment 1,600.00 1,600.00 ‐ 1,600.00 200‐5230‐50‐98 Dues, Fees, & Subscriptions 400.00 400.00 111.00 27.75 289.00 200‐5240‐50‐98 Postage and Delivery 100.00 100.00 ‐ 100.00 200‐5280‐50‐98 Printing and Reproduction 100.00 100.00 66.32 66.32 66.32 33.68 Subtotal object ‐ 05 2,600.00 2,600.00 583.63 88.23 22.45 2,016.37 200‐5330‐50‐98 Copier Expense 800.00 800.00 ‐ 800.00 200‐5350‐50‐98 Vehicle Expense 2,560.00 2,560.00 3,338.60 39.96 130.41 (778.60) 200‐5352‐50‐98 Fuel 5,600.00 5,600.00 2,981.35 53.24 2,618.65 200‐5353‐50‐98 Oil/Grease/Inspections 800.00 800.00 ‐ 800.00 Subtotal object ‐ 05 9,760.00 9,760.00 6,319.95 39.96 64.75 3,440.05 200‐5400‐50‐98 Uniform Expense 5,660.00 5,660.00 3,019.67 1,380.00 53.35 2,640.33 200‐5480‐50‐98 Contracted Services 25,000.00 25,000.00 48.00 0.19 24,952.00 Subtotal object ‐ 05 30,660.00 30,660.00 3,067.67 1,380.00 10.01 27,592.33 200‐5520‐50‐98 Telephones 1,200.00 1,200.00 121.77 10.15 1,078.23 200‐5526‐50‐98 Data Network 200.00 200.00 142.96 71.48 57.04 200‐5530‐50‐98 Travel 1,000.00 1,000.00 ‐ 1,000.00 200‐5536‐50‐98 Training/Seminars 1,600.00 1,600.00 94.80 5.93 1,505.20 Subtotal object ‐ 05 4,000.00 4,000.00 359.53 8.99 3,640.47 200‐5620‐50‐98 Tools & Equipment 1,000.00 1,000.00 1,295.85 129.59 (295.85) 200‐5630‐50‐98 Safety Equipment 2,000.00 2,000.00 1,777.13 540.00 88.86 222.87 Subtotal object ‐ 05 3,000.00 3,000.00 3,072.98 540.00 102.43 (72.98) 45Page 62Item 3.
200‐6610‐50‐98 CONSTRUCTION 3,051,275.00 (3,051,275.00) ‐ Subtotal object ‐ 06 3,051,275.00 (3,051,275.00) ‐ 200‐7144‐50‐98 Transfer to Capital Projects 4,126,507.00 4,126,507.00 4,126,507.00 100.00 Subtotal object ‐ 07 4,126,507.00 4,126,507.00 4,126,507.00 100.00 Program number: 98 CONSTRUCTION INSPECTIONS 3,419,926.00 1,084,424.17 4,504,350.17 4,406,499.06 21,941.78 97.83 97,851.11 Department number: 50 PUBLIC WORKS 18,629,015.00 1,140,353.17 19,769,368.17 16,480,460.52 1,108,009.74 694,804.11 83.36 2,594,103.54 Expense Subtotal ‐ ‐ ‐ ‐ ‐ ‐ 24,956,201.00 1,123,778.00 26,079,979.00 22,488,913.69 3,083,454.54 776,997.61 86.23 2,814,067.70 Fund number: 200 WATER/SEWER 2,575.00 31,296.00 33,871.00 1,111,188.54 198,308.33 776,997.61 (1,854,315.15) 300‐4105‐10‐00 Property Taxes ‐Delinquent (185,713.00) (185,713.00) (170,751.00) (9,339.85) 91.94 (14,962.00) 300‐4110‐10‐00 Property Taxes ‐Current (6,625,000.00) (6,625,000.00) (6,830,791.65) (5,014.43) 103.11 205,791.65 300‐4115‐10‐00 Taxes ‐Penalties (45,000.00) (45,000.00) (51,375.52) (2,719.38) 114.17 6,375.52 Subtotal object ‐ 04 (6,855,713.00) (6,855,713.00) (7,052,918.17) (17,073.66) 102.88 197,205.17 300‐4610‐10‐00 Interest Income (45,000.00) (45,000.00) (85,001.57) (3,221.58) 188.89 40,001.57 Subtotal object ‐ 04 (45,000.00) (45,000.00) (85,001.57) (3,221.58) 188.89 40,001.57 Program number: DEFAULT PROGRAM (6,900,713.00) (6,900,713.00) (7,137,919.74) (20,295.24) 103.44 237,206.74 Department number: 10 ADMINISTRATION (6,900,713.00) (6,900,713.00) (7,137,919.74) (20,295.24) 103.44 237,206.74 Revenue Subtotal ‐ ‐ ‐ ‐ ‐ ‐ (6,900,713.00) (6,900,713.00) (7,137,919.74) (20,295.24) 103.44 237,206.74 300‐5410‐10‐00 Professional Services 2,500.00 ‐ (2,500.00) Subtotal object ‐ 05 2,500.00 ‐ (2,500.00) 300‐6186‐10‐00 2013 GO Ref Bond 165,000.00 165,000.00 165,000.00 165,000.00 100.00 300‐6189‐10‐00 2012 GO TX Bond Payment 190,000.00 190,000.00 190,000.00 100.00 Subtotal object ‐ 06 355,000.00 355,000.00 355,000.00 165,000.00 100.00 300‐6200‐10‐00 Bond Administrative Fees 20,000.00 20,000.00 1,930.00 1,490.00 9.65 18,070.00 300‐6201‐10‐00 2014 GO Debt payment 280,000.00 280,000.00 280,000.00 280,000.00 100.00 300‐6203‐10‐00 2015 GO Debt Payment 500,100.00 500,100.00 500,100.00 100.00 300‐6204‐10‐00 2015 CO Debt Payment 215,000.00 215,000.00 215,000.00 100.00 300‐6205‐10‐00 2016 GO Debt Payment 616,500.00 616,500.00 616,500.00 100.00 300‐6206‐10‐00 2016 CO Debt Payment 45,000.00 45,000.00 45,000.00 100.00 300‐6208‐10‐00 2017 GO Bond Payment 405,000.00 405,000.00 405,000.00 100.00 300‐6209‐10‐00 2018 GO Bond Payment 135,000.00 135,000.00 135,000.00 100.00 300‐6210‐10‐00 2018 CO Bond Payment 160,000.00 160,000.00 160,000.00 100.00 300‐6211‐10‐00 2019 CO Debt Payment 967,754.00 967,754.00 967,753.00 1.00 100.00 300‐6212‐10‐00 2019 GO Debt Payment 140,000.00 140,000.00 140,000.00 100.00 300‐6299‐10‐00 Bond Interest Expense 3,183,386.00 3,183,386.00 3,183,384.65 1,620,146.51 1.35 100.00 Subtotal object ‐ 06 6,667,740.00 6,667,740.00 6,649,667.65 1,901,636.51 2.35 99.73 18,070.00 Program number: DEFAULT PROGRAM 7,022,740.00 7,022,740.00 7,007,167.65 2,066,636.51 2.35 99.78 15,570.00 Department number: 10 ADMINISTRATION 7,022,740.00 7,022,740.00 7,007,167.65 2,066,636.51 2.35 99.78 15,570.00 Expense Subtotal ‐ ‐ ‐ ‐ ‐ ‐ 7,022,740.00 7,022,740.00 7,007,167.65 2,066,636.51 2.35 99.78 15,570.00 Fund number: 300 INTEREST AND SINKING 122,027.00 122,027.00 (130,752.09) 2,046,341.27 2.35 252,776.74 410‐4510‐10‐99 Grant Revenue (182,788.00) (182,788.00) ‐ (182,788.00) Subtotal object ‐ 04 (182,788.00) (182,788.00) ‐ (182,788.00) 410‐4610‐10‐99 Interest (30,000.00) (30,000.00) (56,271.92) (4,377.91) 187.57 26,271.92 Subtotal object ‐ 04 (30,000.00) (30,000.00) (56,271.92) (4,377.91) 187.57 26,271.92 410‐4910‐10‐99 Other Reimbursements (124,600.00) (124,600.00) (75,428.92) 60.54 (49,171.08) 410‐4995‐10‐99 Transfer In (1,913,713.00) (108,969.00) (2,022,682.00) (1,854,125.13) (168,556.83) 91.67 (168,556.87) Subtotal object ‐ 04 (2,038,313.00) (108,969.00) (2,147,282.00) (1,929,554.05) (168,556.83) 89.86 (217,727.95) Program number: 99 NON‐DEPARTMENTAL (2,251,101.00) (108,969.00) (2,360,070.00) (1,985,825.97) (172,934.74) 84.14 (374,244.03) Department number: 10 ADMINISTRATION (2,251,101.00) (108,969.00) (2,360,070.00) (1,985,825.97) (172,934.74) 84.14 (374,244.03) Revenue Subtotal ‐ ‐ ‐ ‐ ‐ ‐ (2,251,101.00) (108,969.00) (2,360,070.00) (1,985,825.97) (172,934.74) 84.14 (374,244.03) 410‐5220‐10‐03 Office Equipment 1,800.00 1,800.00 889.11 49.40 910.89 Subtotal object ‐ 05 1,800.00 1,800.00 889.11 49.40 910.89 Program number: 3 FINANCE 1,800.00 1,800.00 889.11 49.40 910.89 410‐5220‐10‐05 Office Equipment 10,500.00 10,500.00 3,788.59 36.08 6,711.41 Subtotal object ‐ 05 10,500.00 10,500.00 3,788.59 36.08 6,711.41 410‐6125‐10‐05 Capital‐Equipment (Technology) 10,750.00 10,750.00 20,768.05 4,427.09 193.19 (14,445.14) Subtotal object ‐ 06 10,750.00 10,750.00 20,768.05 4,427.09 193.19 (14,445.14) 46Page 63Item 3.
Program number: 5 IT 21,250.00 21,250.00 24,556.64 4,427.09 115.56 (7,733.73) 410‐5220‐10‐07 Office Equipment 1,800.00 1,800.00 1,924.15 106.90 (124.15) Subtotal object ‐ 05 1,800.00 1,800.00 1,924.15 106.90 (124.15) Program number: 7 MUNICIPAL COURT 1,800.00 1,800.00 1,924.15 106.90 (124.15) 410‐5220‐10‐08 Office Equipment 2,700.00 2,700.00 2,667.33 98.79 32.67 Subtotal object ‐ 05 2,700.00 2,700.00 2,667.33 98.79 32.67 Program number: 8 UTILITY BILLING 2,700.00 2,700.00 2,667.33 98.79 32.67 Department number: 10 ADMINISTRATION 27,550.00 27,550.00 30,037.23 4,427.09 109.03 (6,914.32) 410‐5220‐20‐01 Office Equipment 3,600.00 3,600.00 3,702.37 102.84 (102.37) Subtotal object ‐ 05 3,600.00 3,600.00 3,702.37 102.84 (102.37) 410‐6125‐20‐01 Capital‐Equipment (Technology) 10,000.00 10,000.00 ‐ 10,000.00 410‐6140‐20‐01 CAPITAL EXPENSE‐EQUIPMENT 6,000.00 6,000.00 7,308.93 ‐ (1,308.93) 410‐6160‐20‐01 Capital‐Vehicles 91,966.00 91,966.00 95,049.83 52,907.50 103.35 (55,991.33) Subtotal object ‐ 06 107,966.00 107,966.00 95,049.83 60,216.43 88.04 (47,300.26) Program number: 1 OPERATIONS 111,566.00 111,566.00 98,752.20 60,216.43 88.52 (47,402.63) 410‐5220‐20‐05 Office Equipment 900.00 900.00 889.11 98.79 10.89 Subtotal object ‐ 05 900.00 900.00 889.11 98.79 10.89 410‐6125‐20‐05 Capital‐Equipment (Technology) 10,000.00 10,000.00 8,401.48 84.02 1,598.52 Subtotal object ‐ 06 10,000.00 10,000.00 8,401.48 84.02 1,598.52 Program number: 5 DISPATCH 10,900.00 10,900.00 9,290.59 85.24 1,609.41 Department number: 20 POLICE 122,466.00 122,466.00 108,042.79 60,216.43 88.22 (45,793.22) 410‐5220‐30‐01 Office Equipment 3,600.00 3,600.00 3,556.44 98.79 43.56 Subtotal object ‐ 05 3,600.00 3,600.00 3,556.44 98.79 43.56 410‐6160‐30‐01 Capital‐Vehicles 354,870.00 108,969.00 463,839.00 229,288.00 110,286.00 49.43 234,551.00 410‐6160‐30‐01‐1931‐EQ Replacement Fire Engine 415,305.57 415,305.57 415,305.57 100.00 Subtotal object ‐ 06 354,870.00 524,274.57 879,144.57 644,593.57 110,286.00 73.32 234,551.00 Program number: 1 OPERATIONS 358,470.00 524,274.57 882,744.57 648,150.01 110,286.00 73.42 234,594.56 410‐6160‐30‐05 Capital‐vehicles 40,823.00 40,823.00 41,596.40 101.90 (773.40) Subtotal object ‐ 06 40,823.00 40,823.00 41,596.40 101.90 (773.40) Program number: 5 MARSHAL 40,823.00 40,823.00 41,596.40 101.90 (773.40) Department number: 30 FIRE 399,293.00 524,274.57 923,567.57 689,746.41 110,286.00 74.68 233,821.16 410‐5220‐40‐01 Office Equipment 7,200.00 7,200.00 7,981.99 110.86 (781.99) Subtotal object ‐ 05 7,200.00 7,200.00 7,981.99 110.86 (781.99) Program number: 1 INSPECTIONS 7,200.00 7,200.00 7,981.99 110.86 (781.99) 410‐5220‐40‐02 Office Equipment 900.00 900.00 2,774.30 308.26 (1,874.30) Subtotal object ‐ 05 900.00 900.00 2,774.30 308.26 (1,874.30) Program number: 2 CODE COMPLIANCE 900.00 900.00 2,774.30 308.26 (1,874.30) 410‐5220‐40‐03 Office Equipment 3,600.00 3,600.00 1,924.15 53.45 1,675.85 Subtotal object ‐ 05 3,600.00 3,600.00 1,924.15 53.45 1,675.85 Program number: 3 PLANNING 3,600.00 3,600.00 1,924.15 53.45 1,675.85 Department number: 40 DEVELOPMENT SERVICES 11,700.00 11,700.00 12,680.44 108.38 (980.44) 410‐5220‐50‐01 Office Equipment 900.00 900.00 3,848.30 427.59 (2,948.30) Subtotal object ‐ 05 900.00 900.00 3,848.30 427.59 (2,948.30) 410‐6160‐50‐01 Capital‐Vehicles 58,129.00 58,129.00 58,057.00 44.20 99.88 27.80 Subtotal object ‐ 06 58,129.00 58,129.00 58,057.00 44.20 99.88 27.80 Program number: 1 STREETS 59,029.00 59,029.00 61,905.30 44.20 104.87 (2,920.50) 410‐5220‐50‐02 Office Equipment 3,600.00 3,600.00 6,144.17 170.67 (2,544.17) Subtotal object ‐ 05 3,600.00 3,600.00 6,144.17 170.67 (2,544.17) 410‐6140‐50‐02 Capital‐Equipment 20,000.00 20,000.00 25,948.00 129.74 (5,948.00) 410‐6160‐50‐02 Capital‐Vehicles 122,118.00 (31,196.00) 90,922.00 91,156.77 1.00 100.26 (235.77) Subtotal object ‐ 06 142,118.00 (31,196.00) 110,922.00 117,104.77 1.00 105.57 (6,183.77) Program number: 2 WATER 145,718.00 (31,196.00) 114,522.00 123,248.94 1.00 107.62 (8,727.94) 410‐5220‐50‐03 Office Equipment 900.00 900.00 3,476.58 386.29 (2,576.58) Subtotal object ‐ 05 900.00 900.00 3,476.58 386.29 (2,576.58) 410‐6160‐50‐03 Capital‐Vehicles 25,269.00 25,269.00 25,319.60 100.20 (50.60) Subtotal object ‐ 06 25,269.00 25,269.00 25,319.60 100.20 (50.60) 47Page 64Item 3.
Program number: 3 WASTEWATER 26,169.00 26,169.00 28,796.18 110.04 (2,627.18) 410‐6160‐50‐98 Capital Expense ‐ vehicles 31,196.00 31,196.00 31,333.00 100.44 (137.00) Subtotal object ‐ 06 31,196.00 31,196.00 31,333.00 100.44 (137.00) Program number: 98 CONSTRUCTION INSPECTIONS 31,196.00 31,196.00 31,333.00 100.44 (137.00) Department number: 50 PUBLIC WORKS 230,916.00 230,916.00 245,283.42 45.20 106.22 (14,412.62) 410‐5220‐60‐01 Office Equipment 2,700.00 2,700.00 889.11 32.93 1,810.89 Subtotal object ‐ 05 2,700.00 2,700.00 889.11 32.93 1,810.89 Program number: 1 PARK ADMINISTRATION 2,700.00 2,700.00 889.11 32.93 1,810.89 410‐6160‐60‐02 Capital‐vehicles 94,342.00 94,342.00 94,435.01 125.69 100.10 (218.70) Subtotal object ‐ 06 94,342.00 94,342.00 94,435.01 125.69 100.10 (218.70) Program number: 2 PARK OPERATIONS 94,342.00 94,342.00 94,435.01 125.69 100.10 (218.70) 410‐5220‐60‐05 Office Equipment 5,400.00 5,400.00 4,812.94 89.13 587.06 Subtotal object ‐ 05 5,400.00 5,400.00 4,812.94 89.13 587.06 Program number: 5 LIBRARY 5,400.00 5,400.00 4,812.94 89.13 587.06 Department number: 60 COMMUNITY SERVICES 102,442.00 102,442.00 100,137.06 125.69 97.75 2,179.25 410‐5220‐98‐01 Office Equipment 1,800.00 1,800.00 1,924.15 106.90 (124.15) Subtotal object ‐ 05 1,800.00 1,800.00 1,924.15 106.90 (124.15) Program number: 1 ENGINEERING 1,800.00 1,800.00 1,924.15 106.90 (124.15) Department number: 98 ENGINEERING 1,800.00 1,800.00 1,924.15 106.90 (124.15) Expense Subtotal ‐ ‐ ‐ ‐ ‐ ‐ 896,167.00 524,274.57 1,420,441.57 1,187,851.50 110,286.00 64,814.41 83.63 167,775.66 Fund number: 410 VEHICLE/EQUIPMENT REPLACEMENT (1,354,934.00) 415,305.57 (939,628.43) (797,974.47) (62,648.74) 64,814.41 84.92 (206,468.37) 450‐4001‐98‐02 Storm Drainage Utility Fee (627,156.00) (627,156.00) (611,180.74) (57,621.17) 97.45 (15,975.26) 450‐4002‐98‐02 Drainage Review Fee (6,000.00) (6,000.00) (1,710.00) 28.50 (4,290.00) Subtotal object ‐ 04 (633,156.00) (633,156.00) (612,890.74) (57,621.17) 96.80 (20,265.26) 450‐4610‐98‐02 Interest Storm Utility (5,000.00) (5,000.00) (7,905.98) (601.74) 158.12 2,905.98 Subtotal object ‐ 04 (5,000.00) (5,000.00) (7,905.98) (601.74) 158.12 2,905.98 Program number: 2 STORM DRAINAGE (638,156.00) (638,156.00) (620,796.72) (58,222.91) 97.28 (17,359.28) Department number: 98 ENGINEERING (638,156.00) (638,156.00) (620,796.72) (58,222.91) 97.28 (17,359.28) Revenue Subtotal ‐ ‐ ‐ ‐ ‐ ‐ (638,156.00) (638,156.00) (620,796.72) (58,222.91) 97.28 (17,359.28) 450‐5110‐98‐02 Salaries 114,200.00 721.00 114,921.00 108,705.40 9,047.14 94.59 6,215.60 450‐5115‐98‐02 Salaries‐Overtime 1,390.00 1,390.00 3,074.89 117.89 221.22 (1,684.89) 450‐5140‐98‐02 Salaries‐Longevity Pay 245.00 245.00 245.00 100.00 450‐5145‐98‐02 Social Security Expense 7,160.00 7,160.00 6,559.63 528.66 91.62 600.37 450‐5150‐98‐02 Medicare Expense 1,675.00 1,675.00 1,534.11 123.64 91.59 140.89 450‐5155‐98‐02 SUTA Expense 324.00 324.00 288.00 88.89 36.00 450‐5160‐98‐02 Health Insurance 21,843.00 21,843.00 15,966.26 1,344.28 73.10 5,876.74 450‐5165‐98‐02 Dental Expense 841.00 841.00 770.88 70.08 91.66 70.12 450‐5170‐98‐02 Life Insurance/AD&D 226.00 226.00 206.36 18.76 91.31 19.64 450‐5175‐98‐02 Liability (TML) Workers Comp 2,465.00 2,465.00 3,178.07 281.70 128.93 (713.07) 450‐5180‐98‐02 TMRS Expense 15,647.00 15,647.00 15,245.50 1,247.71 97.43 401.50 450‐5185‐98‐02 Long/Short Term Disability 217.00 217.00 182.38 16.86 84.05 34.62 450‐5186‐98‐02 WELLE‐Wellness Prog Reimb Empl 600.00 600.00 550.00 50.00 91.67 50.00 Subtotal object ‐ 05 166,833.00 721.00 167,554.00 156,506.48 12,846.72 93.41 11,047.52 450‐5210‐98‐02 Office Supplies 125.00 125.00 53.13 3.14 42.50 71.87 450‐5220‐98‐02 Office Equipment 75.00 75.00 30.03 40.04 44.97 450‐5230‐98‐02 Dues, Fees, & Subscriptions 1,370.00 1,370.00 527.00 38.47 843.00 450‐5240‐98‐02 Postage and Delivery 50.00 50.00 23.25 46.50 26.75 450‐5280‐98‐02 Printing and Reproduction 1,420.00 1,420.00 1,020.00 71.83 400.00 450‐5290‐98‐02 Other Charges and Services 13.49 ‐ (13.49) Subtotal object ‐ 05 3,040.00 3,040.00 1,666.90 3.14 54.83 1,373.10 450‐5310‐98‐02 Rental Expense 2,000.00 2,000.00 ‐ 2,000.00 450‐5330‐98‐02 Copier Expense 30.00 30.00 ‐ 30.00 450‐5350‐98‐02 Vehicle Expense 1,000.00 1,000.00 721.18 9.99 72.12 278.82 450‐5352‐98‐02 Fuel 1,800.00 1,800.00 940.48 52.25 859.52 450‐5353‐98‐02 Oil/Grease/Inspections 125.00 125.00 ‐ 125.00 Subtotal object ‐ 05 4,955.00 4,955.00 1,661.66 9.99 33.54 3,293.34 48Page 65Item 3.
450‐5400‐98‐02 Uniforms 1,100.00 1,100.00 1,334.88 185.00 121.35 (234.88) 450‐5410‐98‐02 Professional Services‐Storm Dr 500.00 500.00 ‐ 500.00 450‐5410‐98‐02‐2003‐DR Prof Svcs Frontier Pk/Prest Lk 100,000.00 100,000.00 ‐ 100,000.00 450‐5430‐98‐02 Legal Fees 1,000.00 1,000.00 ‐ 1,000.00 450‐5480‐98‐02 Contract Services 2,345.00 2,345.00 ‐ 2,345.00 450‐5490‐98‐02 Drainage Review Expense 6,000.00 6,000.00 2,518.75 41.98 3,481.25 Subtotal object ‐ 05 110,945.00 110,945.00 3,853.63 185.00 3.47 107,091.37 450‐5520‐98‐02 Telephones 1,200.00 1,200.00 696.06 58.01 503.94 450‐5526‐98‐02 Data Network 460.00 460.00 341.91 37.99 74.33 118.09 450‐5530‐98‐02 Travel/Lodging/Meals Expense 900.00 900.00 1,076.15 119.57 (176.15) 450‐5533‐98‐02 Mileage Expense 200.00 200.00 ‐ 200.00 450‐5536‐98‐02 Training/Seminars 1,500.00 1,500.00 1,257.05 50.00 83.80 242.95 Subtotal object ‐ 05 4,260.00 4,260.00 3,371.17 87.99 79.14 888.83 450‐5620‐98‐02 Tools & Equipment 500.00 500.00 293.93 58.79 206.07 450‐5630‐98‐02 Safety Equipment 1,000.00 1,000.00 584.96 180.00 58.50 415.04 450‐5640‐98‐02 Signs & Hardware 500.00 500.00 ‐ 500.00 450‐5650‐98‐02 Maintenance Materials 1,500.00 1,500.00 1,470.15 98.01 29.85 Subtotal object ‐ 05 3,500.00 3,500.00 2,349.04 180.00 67.12 1,150.96 450‐6193‐98‐02 2012 CO Bond Payment 61,200.00 61,200.00 61,200.00 100.00 Subtotal object ‐ 06 61,200.00 61,200.00 61,200.00 100.00 450‐6205‐98‐02 2016 CO Bond Payment 50,000.00 50,000.00 50,000.00 100.00 450‐6208‐98‐02 2017 CO Bond Payment 35,000.00 35,000.00 35,000.00 100.00 450‐6299‐98‐02 Bond Interest Expense 102,441.00 102,441.00 102,440.50 50,761.25 0.50 100.00 Subtotal object ‐ 06 187,441.00 187,441.00 187,440.50 50,761.25 0.50 100.00 450‐7145‐98‐02 Transfer to VERF 3,963.00 3,963.00 3,632.75 330.25 91.67 330.25 450‐7147‐98‐02 Transfer to GF 96,172.00 96,172.00 88,157.63 8,014.33 91.67 8,014.37 Subtotal object ‐ 07 100,135.00 100,135.00 91,790.38 8,344.58 91.67 8,344.62 Program number: 2 STORM DRAINAGE 642,309.00 721.00 643,030.00 509,839.76 72,418.67 0.50 79.29 133,189.74 Department number: 98 ENGINEERING 642,309.00 721.00 643,030.00 509,839.76 72,418.67 0.50 79.29 133,189.74 Expense Subtotal ‐ ‐ ‐ ‐ ‐ ‐ 642,309.00 721.00 643,030.00 509,839.76 72,418.67 0.50 79.29 133,189.74 Fund number: 450 STORM DRAINAGE UTILITY FUND 4,153.00 721.00 4,874.00 (110,956.96) 14,195.76 0.50 115,830.46 570‐4537‐10‐00 Court Technology Revenue (10,000.00) (10,000.00) (7,337.31) (616.00) 73.37 (2,662.69) Subtotal object ‐ 04 (10,000.00) (10,000.00) (7,337.31) (616.00) 73.37 (2,662.69) 570‐4610‐10‐00 Interest (300.00) (300.00) (367.32) (21.08) 122.44 67.32 Subtotal object ‐ 04 (300.00) (300.00) (367.32) (21.08) 122.44 67.32 Program number: DEFAULT PROGRAM (10,300.00) (10,300.00) (7,704.63) (637.08) 74.80 (2,595.37) Department number: 10 ADMINISTRATION (10,300.00) (10,300.00) (7,704.63) (637.08) 74.80 (2,595.37) Revenue Subtotal ‐ ‐ ‐ ‐ ‐ ‐ (10,300.00) (10,300.00) (7,704.63) (637.08) 74.80 (2,595.37) 570‐5203‐10‐00 Court Technology Expense 10,000.00 10,000.00 9,639.79 7,125.00 175.00 96.40 185.21 Subtotal object ‐ 05 10,000.00 10,000.00 9,639.79 7,125.00 175.00 96.40 185.21 Program number: DEFAULT PROGRAM 10,000.00 10,000.00 9,639.79 7,125.00 175.00 96.40 185.21 Department number: 10 ADMINISTRATION 10,000.00 10,000.00 9,639.79 7,125.00 175.00 96.40 185.21 Expense Subtotal ‐ ‐ ‐ ‐ ‐ ‐ 10,000.00 10,000.00 9,639.79 7,125.00 175.00 96.40 185.21 Fund number: 570 COURT TECHNOLOGY (300.00) (300.00) 1,935.16 6,487.92 175.00 (2,410.16) 575‐4539‐10‐00 Municipal Jury Revenue (76.90) (14.20) ‐ 76.90 Subtotal object ‐ 04 (76.90) (14.20) ‐ 76.90 Program number: DEFAULT PROGRAM (76.90) (14.20) ‐ 76.90 Department number: 10 ADMINISTRATION (76.90) (14.20) ‐ 76.90 Revenue Subtotal ‐ ‐ ‐ ‐ ‐ ‐ (76.90) (14.20) ‐ 76.90 Fund number: 575 MUNICIPAL JURY FUND (76.90) (14.20) ‐ 76.90 580‐4536‐10‐00 Court Security Revenue (8,500.00) (8,500.00) (6,965.18) (731.80) 81.94 (1,534.82) Subtotal object ‐ 04 (8,500.00) (8,500.00) (6,965.18) (731.80) 81.94 (1,534.82) 580‐4610‐10‐00 Interest (300.00) (300.00) (519.28) (41.28) 173.09 219.28 Subtotal object ‐ 04 (300.00) (300.00) (519.28) (41.28) 173.09 219.28 Program number: DEFAULT PROGRAM (8,800.00) (8,800.00) (7,484.46) (773.08) 85.05 (1,315.54) Department number: 10 ADMINISTRATION (8,800.00) (8,800.00) (7,484.46) (773.08) 85.05 (1,315.54) 49Page 66Item 3.
Revenue Subtotal ‐ ‐ ‐ ‐ ‐ ‐ (8,800.00) (8,800.00) (7,484.46) (773.08) 85.05 (1,315.54) 580‐5110‐10‐00 Salaries & Wages Payable 8,176.00 8,176.00 ‐ 8,176.00 580‐5145‐10‐00 Social Security Expense 507.00 507.00 ‐ 507.00 580‐5150‐10‐00 Medicare Expense 119.00 119.00 ‐ 119.00 580‐5155‐10‐00 SUTA expense 162.00 162.00 ‐ 162.00 580‐5175‐10‐00 Workers Comp 148.00 148.00 ‐ 148.00 Subtotal object ‐ 05 9,112.00 9,112.00 ‐ 9,112.00 580‐5204‐10‐00 Court Security Expense 1,141.00 ‐ (1,141.00) Subtotal object ‐ 05 1,141.00 ‐ (1,141.00) 580‐5536‐10‐00 Training/Seminars 1,000.00 1,000.00 ‐ 1,000.00 Subtotal object ‐ 05 1,000.00 1,000.00 ‐ 1,000.00 Program number: DEFAULT PROGRAM 10,112.00 10,112.00 1,141.00 11.28 8,971.00 Department number: 10 ADMINISTRATION 10,112.00 10,112.00 1,141.00 11.28 8,971.00 Expense Subtotal ‐ ‐ ‐ ‐ ‐ ‐ 10,112.00 10,112.00 1,141.00 11.28 8,971.00 Fund number: 580 COURT SECURITY 1,312.00 1,312.00 (6,343.46) (773.08) 7,655.46 590‐4915‐10‐00 Escrow Income (501,047.64) 3,611.14 ‐ 501,047.64 Subtotal object ‐ 04 (501,047.64) 3,611.14 ‐ 501,047.64 Program number: DEFAULT PROGRAM (501,047.64) 3,611.14 ‐ 501,047.64 Department number: 10 ADMINISTRATION (501,047.64) 3,611.14 ‐ 501,047.64 Revenue Subtotal ‐ ‐ ‐ ‐ ‐ ‐ (501,047.64) 3,611.14 ‐ 501,047.64 590‐7144‐10‐00 Transfer to CIP 1,354,577.00 1,354,577.00 501,047.64 (3,611.14) 36.99 853,529.36 Subtotal object ‐ 07 1,354,577.00 1,354,577.00 501,047.64 (3,611.14) 36.99 853,529.36 Program number: DEFAULT PROGRAM 1,354,577.00 1,354,577.00 501,047.64 (3,611.14) 36.99 853,529.36 Department number: 10 ADMINISTRATION 1,354,577.00 1,354,577.00 501,047.64 (3,611.14) 36.99 853,529.36 Expense Subtotal ‐ ‐ ‐ ‐ ‐ ‐ 1,354,577.00 1,354,577.00 501,047.64 (3,611.14) 36.99 853,529.36 Fund number: 590 ESCROW 1,354,577.00 1,354,577.00 ‐ 1,354,577.00 610‐4045‐60‐00 Park Dedication‐Fees (200,000.00) (200,000.00) ‐ (200,000.00) Subtotal object ‐ 04 (200,000.00) (200,000.00) ‐ (200,000.00) 610‐4610‐60‐00 Interest Income (25,000.00) (25,000.00) (25,813.08) (1,820.60) 103.25 813.08 Subtotal object ‐ 04 (25,000.00) (25,000.00) (25,813.08) (1,820.60) 103.25 813.08 Program number: DEFAULT PROGRAM (225,000.00) (225,000.00) (25,813.08) (1,820.60) 11.47 (199,186.92) Department number: 60 PARK DEDICATION (225,000.00) (225,000.00) (25,813.08) (1,820.60) 11.47 (199,186.92) Revenue Subtotal ‐ ‐ ‐ ‐ ‐ ‐ (225,000.00) (225,000.00) (25,813.08) (1,820.60) 11.47 (199,186.92) Fund number: 610 PARK DEDICATION FEE FUND (225,000.00) (225,000.00) (25,813.08) (1,820.60) 11.47 (199,186.92) 620‐4055‐60‐00 Park Improvement (100,000.00) (100,000.00) ‐ (100,000.00) Subtotal object ‐ 04 (100,000.00) (100,000.00) ‐ (100,000.00) 620‐4510‐60‐00 Grant Revenue (500,000.00) (500,000.00) ‐ (500,000.00) Subtotal object ‐ 04 (500,000.00) (500,000.00) ‐ (500,000.00) 620‐4610‐60‐00 Interest Income (15,000.00) (15,000.00) (22,335.06) (1,516.81) 148.90 7,335.06 Subtotal object ‐ 04 (15,000.00) (15,000.00) (22,335.06) (1,516.81) 148.90 7,335.06 Program number: DEFAULT PROGRAM (615,000.00) (615,000.00) (22,335.06) (1,516.81) 3.63 (592,664.94) Department number: 60 PARK IMPROVEMENT (615,000.00) (615,000.00) (22,335.06) (1,516.81) 3.63 (592,664.94) Revenue Subtotal ‐ ‐ ‐ ‐ ‐ ‐ (615,000.00) (615,000.00) (22,335.06) (1,516.81) 3.63 (592,664.94) 620‐5410‐60‐00‐1910‐PK Hike & Bike Master Plan 56,187.50 56,187.50 53,593.10 1,575.00 2,594.40 95.38 620‐5489‐60‐00 Developer Reimbursement 15,955.00 15,955.00 ‐ 15,955.00 Subtotal object ‐ 05 15,955.00 56,187.50 72,142.50 53,593.10 1,575.00 2,594.40 74.29 15,955.00 620‐6610‐60‐00‐1801‐PK Cockrell Park Trail Connection 500,000.00 35,200.00 535,200.00 20,665.00 3,620.00 503,736.00 3.86 10,799.00 620‐6610‐60‐00‐1802‐PK Hays Park 35,000.00 18,500.00 53,500.00 3,760.52 28,073.56 7.03 21,665.92 620‐6610‐60‐00‐1911‐PK Pecan Grove H&B Trail 30,000.00 30,000.00 ‐ 30,000.00 620‐6610‐60‐00‐2015‐PK Pecan Grove Park 85,000.00 85,000.00 ‐ 85,000.00 Subtotal object ‐ 06 650,000.00 53,700.00 703,700.00 24,425.52 3,620.00 531,809.56 3.47 147,464.92 Program number: DEFAULT PROGRAM 665,955.00 109,887.50 775,842.50 78,018.62 5,195.00 534,403.96 10.06 163,419.92 Department number: 60 PARK IMPROVEMENT 665,955.00 109,887.50 775,842.50 78,018.62 5,195.00 534,403.96 10.06 163,419.92 Expense Subtotal ‐ ‐ ‐ ‐ ‐ ‐ 665,955.00 109,887.50 775,842.50 78,018.62 5,195.00 534,403.96 10.06 163,419.92 Fund number: 620 PARK IMPROVEMENT 50,955.00 109,887.50 160,842.50 55,683.56 3,678.19 534,403.96 34.62 (429,245.02) 630‐4015‐50‐00 Impact Fees (3,000,000.00) (3,000,000.00) (3,549,838.33) (302,502.00) 118.33 549,838.33 50Page 67Item 3.
Subtotal object ‐ 04 (3,000,000.00) (3,000,000.00) (3,549,838.33) (302,502.00) 118.33 549,838.33 630‐4615‐50‐00 Interest (45,000.00) (45,000.00) (51,478.06) (4,880.99) 114.40 6,478.06 Subtotal object ‐ 04 (45,000.00) (45,000.00) (51,478.06) (4,880.99) 114.40 6,478.06 Program number: DEFAULT PROGRAM (3,045,000.00) (3,045,000.00) (3,601,316.39) (307,382.99) 118.27 556,316.39 Department number: 50 IMPACT FEES (3,045,000.00) (3,045,000.00) (3,601,316.39) (307,382.99) 118.27 556,316.39 Revenue Subtotal ‐ ‐ ‐ ‐ ‐ ‐ (3,045,000.00) (3,045,000.00) (3,601,316.39) (307,382.99) 118.27 556,316.39 630‐5489‐50‐00‐8002‐DV Dev Agrmt‐Prsp Prtnrs West 50,910.00 50,910.00 ‐ 50,910.00 630‐5489‐50‐00‐8006‐DV Dev Agrmnt‐Parks @ Legacy 150,000.00 150,000.00 321,962.00 214.64 (171,962.00) 630‐5489‐50‐00‐8010‐DV Dev Agrmnt‐Prosper Lakes 55,810.45 55,810.45 ‐ (55,810.45) 630‐5489‐50‐00‐8011‐DV Dev Agrment‐Star Trail 450,000.00 450,000.00 323,151.50 71.81 126,848.50 630‐5489‐50‐00‐8012‐DV Dev Agrmnt‐TVG Windsong 280,000.00 280,000.00 259,088.00 92.53 20,912.00 Subtotal object ‐ 05 930,910.00 930,910.00 960,011.95 55,810.45 103.13 (29,101.95) 630‐6610‐50‐00‐1715‐WA County Line Elevated Storage 55,970.29 55,970.29 55,726.27 244.02 99.56 630‐6610‐50‐00‐1716‐WA 24 WL Conn. Cnty Line EST/DNT 139,307.29 139,307.29 82,975.21 3,534.12 56,332.08 59.56 Subtotal object ‐ 06 195,277.58 195,277.58 138,701.48 3,534.12 56,576.10 71.03 Program number: DEFAULT PROGRAM 930,910.00 195,277.58 1,126,187.58 1,098,713.43 59,344.57 56,576.10 97.56 (29,101.95) Department number: 50 IMPACT FEES 930,910.00 195,277.58 1,126,187.58 1,098,713.43 59,344.57 56,576.10 97.56 (29,101.95) Expense Subtotal ‐ ‐ ‐ ‐ ‐ ‐ 930,910.00 195,277.58 1,126,187.58 1,098,713.43 59,344.57 56,576.10 97.56 (29,101.95) Fund number: 630 WATER IMPACT FEES (2,114,090.00) 195,277.58 (1,918,812.42) (2,502,602.96) (248,038.42) 56,576.10 130.43 527,214.44 640‐4020‐50‐00 Impact Fees (850,000.00) (850,000.00) (1,308,027.00) (129,736.00) 153.89 458,027.00 Subtotal object ‐ 04 (850,000.00) (850,000.00) (1,308,027.00) (129,736.00) 153.89 458,027.00 640‐4620‐50‐00 Interest (35,000.00) (35,000.00) (41,770.83) (3,457.52) 119.35 6,770.83 Subtotal object ‐ 04 (35,000.00) (35,000.00) (41,770.83) (3,457.52) 119.35 6,770.83 640‐4905‐50‐00 Equity Fee (200,000.00) (200,000.00) (283,000.00) (30,000.00) 141.50 83,000.00 Subtotal object ‐ 04 (200,000.00) (200,000.00) (283,000.00) (30,000.00) 141.50 83,000.00 Program number: DEFAULT PROGRAM (1,085,000.00) (1,085,000.00) (1,632,797.83) (163,193.52) 150.49 547,797.83 Department number: 50 IMPACT FEES (1,085,000.00) (1,085,000.00) (1,632,797.83) (163,193.52) 150.49 547,797.83 Revenue Subtotal ‐ ‐ ‐ ‐ ‐ ‐ (1,085,000.00) (1,085,000.00) (1,632,797.83) (163,193.52) 150.49 547,797.83 640‐5489‐50‐00 DEVELOPER AGREEMENT REIMBURSE 100,000.00 (100,000.00) ‐ 640‐5489‐50‐00‐1608‐WW Dev Reib LaCima #2 Interceptor 31,418.00 21,173.00 ‐ (31,418.00) 640‐5489‐50‐00‐8001‐DV Dev Agrmt TVG Westside Util 250,000.00 250,000.00 101,267.76 40.51 148,732.24 640‐5489‐50‐00‐8002‐DV Dev Agrmt Propser Partners 75,000.00 75,000.00 177,041.24 70,513.00 236.06 (102,041.24) 640‐5489‐50‐00‐8004‐DV Dev Agrmt Frontier Estates 51,225.00 51,225.00 27,280.50 4,098.00 53.26 23,944.50 640‐5489‐50‐00‐8005‐DV Dev Agrmnt LaCima 50,000.00 50,000.00 18,060.00 9,030.00 36.12 31,940.00 640‐5489‐50‐00‐8008‐DV Dev Agrmnt Brookhollow 25,000.00 25,000.00 ‐ 25,000.00 640‐5489‐50‐00‐8011‐DV Dev Agrment Star Trail 100,000.00 100,000.00 ‐ 100,000.00 640‐5489‐50‐00‐8012‐DV Dev Agrmnt TVG Windsong 200,000.00 200,000.00 193,225.00 96.61 6,775.00 640‐5489‐50‐00‐8013‐DV Dev Agrmnt All Storage 15,000.00 15,000.00 ‐ 15,000.00 640‐5489‐50‐00‐8014‐DV Dev Agrmnt Legacy Garden 100,000.00 100,000.00 8,879.00 8.88 91,121.00 Subtotal object ‐ 05 866,225.00 866,225.00 557,171.50 104,814.00 64.32 309,053.50 Program number: DEFAULT PROGRAM 866,225.00 866,225.00 557,171.50 104,814.00 64.32 309,053.50 Department number: 50 IMPACT FEES 866,225.00 866,225.00 557,171.50 104,814.00 64.32 309,053.50 Expense Subtotal ‐ ‐ ‐ ‐ ‐ ‐ 866,225.00 866,225.00 557,171.50 104,814.00 64.32 309,053.50 Fund number: 640 WASTEWATER IMPACT FEES (218,775.00) (218,775.00) (1,075,626.33) (58,379.52) 491.66 856,851.33 660‐4040‐50‐00 East Thoroughfare Impact Fees (1,000,000.00) (1,000,000.00) (1,167,916.33) (51,458.82) 116.79 167,916.33 Subtotal object ‐ 04 (1,000,000.00) (1,000,000.00) (1,167,916.33) (51,458.82) 116.79 167,916.33 660‐4610‐50‐00 Interest (25,000.00) (25,000.00) (30,185.13) (2,587.95) 120.74 5,185.13 Subtotal object ‐ 04 (25,000.00) (25,000.00) (30,185.13) (2,587.95) 120.74 5,185.13 660‐4910‐50‐00 Other Revenue (132,438.00) (132,438.00) ‐ (132,438.00) Subtotal object ‐ 04 (132,438.00) (132,438.00) ‐ (132,438.00) Program number: DEFAULT PROGRAM (1,157,438.00) (1,157,438.00) (1,198,101.46) (54,046.77) 103.51 40,663.46 Department number: 50 IMPACT FEES (1,157,438.00) (1,157,438.00) (1,198,101.46) (54,046.77) 103.51 40,663.46 Revenue Subtotal ‐ ‐ ‐ ‐ ‐ ‐ (1,157,438.00) (1,157,438.00) (1,198,101.46) (54,046.77) 103.51 40,663.46 660‐5489‐50‐00 DEVELOPER AGREEMENT REIMBURSE 300,000.00 (300,000.00) ‐ 660‐5489‐50‐00‐8015‐DV Dev Agrmnt Tanners Mill 300,000.00 300,000.00 ‐ 300,000.00 Subtotal object ‐ 05 300,000.00 300,000.00 ‐ 300,000.00 51Page 68Item 3.
660‐6610‐50‐00‐1709‐ST Prosper Trail (Coit ‐ Custer) 39,997.17 39,997.17 39,997.17 100.00 660‐6610‐50‐00‐1710‐ST Coit Road (First ‐ Frontier) 506,027.40 506,027.40 137,987.90 368,669.50 27.27 (630.00) 660‐6610‐50‐00‐1805‐ST FM2478 ROW (US380‐FM1461) 69,168.00 (69,168.00) ‐ 660‐6610‐50‐00‐1825‐ST COLEMAN (GORGEOUS‐PROSPER TRL) 250,000.00 250,000.00 ‐ 250,000.00 660‐6610‐50‐00‐1932‐ST Coit Rd and US380 35,000.00 (35,000.00) ‐ 660‐6610‐50‐00‐2005‐TR Traffic Signal‐Coit & Richland 300,000.00 160,000.00 460,000.00 27,204.40 134,599.25 5.91 298,196.35 660‐6610‐50‐00‐2018‐PK Coleman Med Lndsc (Talon‐Vict) 350,000.00 350,000.00 ‐ 350,000.00 Subtotal object ‐ 06 654,168.00 951,856.57 1,606,024.57 205,189.47 503,268.75 12.78 897,566.35 660‐7144‐50‐00 Transfer to Capital Proj Fund 104,168.00 104,168.00 104,168.00 100.00 Subtotal object ‐ 07 104,168.00 104,168.00 104,168.00 100.00 Program number: DEFAULT PROGRAM 954,168.00 1,056,024.57 2,010,192.57 309,357.47 503,268.75 15.39 1,197,566.35 Department number: 50 IMPACT FEES 954,168.00 1,056,024.57 2,010,192.57 309,357.47 503,268.75 15.39 1,197,566.35 Expense Subtotal ‐ ‐ ‐ ‐ ‐ ‐ 954,168.00 1,056,024.57 2,010,192.57 309,357.47 503,268.75 15.39 1,197,566.35 Fund number: 660 E THOROUGHFARE IMPACT FEES (203,270.00) 1,056,024.57 852,754.57 (888,743.99) (54,046.77) 503,268.75 1,238,229.81 670‐4530‐10‐00 Police Donation Inc (15,000.00) (15,000.00) (12,515.00) (1,270.00) 83.43 (2,485.00) 670‐4531‐10‐00 Fire Donations (13,200.00) (13,200.00) (12,349.00) (1,137.00) 93.55 (851.00) 670‐4535‐10‐00 Child Safety Inc (12,000.00) (12,000.00) (9,615.60) (3,045.09) 80.13 (2,384.40) 670‐4550‐10‐00 LEOSE Revenue (3,244.82) ‐ 3,244.82 Subtotal object ‐ 04 (40,200.00) (40,200.00) (37,724.42) (5,452.09) 93.84 (2,475.58) 670‐4610‐10‐00 Interest Income (5,400.00) (5,400.00) (6,254.30) (529.11) 115.82 854.30 Subtotal object ‐ 04 (5,400.00) (5,400.00) (6,254.30) (529.11) 115.82 854.30 670‐4761‐10‐00 Tree Mitigation Revenue (144,863.00) (5,150.00) ‐ 144,863.00 Subtotal object ‐ 04 (144,863.00) (5,150.00) ‐ 144,863.00 670‐4916‐10‐00 Cash Seizure Forfeit‐PD (8,829.00) ‐ 8,829.00 Subtotal object ‐ 04 (8,829.00) ‐ 8,829.00 Program number: DEFAULT PROGRAM (45,600.00) (45,600.00) (197,670.72) (11,131.20) 433.49 152,070.72 Department number: 10 ADMINISTRATION (45,600.00) (45,600.00) (197,670.72) (11,131.20) 433.49 152,070.72 Revenue Subtotal ‐ ‐ ‐ ‐ ‐ ‐ (45,600.00) (45,600.00) (197,670.72) (11,131.20) 433.49 152,070.72 670‐3140‐00‐00 Allow. for Uncollected Rece'ab 95.63 ‐ (95.63) Subtotal object ‐ 03 95.63 ‐ (95.63) Program number: DEFAULT PROGRAM 95.63 ‐ (95.63) Department number: NON DEPARTMENTAL 95.63 ‐ (95.63) 670‐5205‐10‐00 Police Donation Exp 60,416.00 60,416.00 51,668.74 9,936.00 85.52 (1,188.74) 670‐5206‐10‐00 Fire Dept Donation Exp 17,826.00 17,826.00 6,504.97 4,157.20 36.49 7,163.83 670‐5208‐10‐00 Child Safety Expense 5,000.00 5,000.00 575.00 11.50 4,425.00 670‐5212‐10‐00 Tree Mitigation Expense 50,000.00 50,000.00 ‐ 50,000.00 670‐5292‐10‐00 PD Seizure Expense 1,646.00 8,817.00 10,463.00 9,284.00 88.73 1,179.00 Subtotal object ‐ 05 134,888.00 8,817.00 143,705.00 68,032.71 14,093.20 47.34 61,579.09 Program number: DEFAULT PROGRAM 134,888.00 8,817.00 143,705.00 68,032.71 14,093.20 47.34 61,579.09 Department number: 10 ADMINISTRATION 134,888.00 8,817.00 143,705.00 68,032.71 14,093.20 47.34 61,579.09 Expense Subtotal ‐ ‐ ‐ ‐ ‐ ‐ 134,888.00 8,817.00 143,705.00 68,128.34 14,093.20 47.41 61,483.46 Fund number: 670 SPECIAL REVENUE‐DONATIONS 89,288.00 8,817.00 98,105.00 (129,542.38) (11,131.20) 14,093.20 213,554.18 675‐4510‐10‐00‐2019‐EM Grants ‐ Collin County (1,098,850.00) (1,098,850.00) (1,098,850.23) 100.00 0.23 675‐4510‐10‐00‐2022‐EM Grants ‐ Denton County (245,300.00) (245,300.00) (245,300.00) 100.00 675‐4510‐10‐00‐2023‐EM Grants ‐ HHS (8,091.78) ‐ 8,091.78 Subtotal object ‐ 04 (1,344,150.00) (1,344,150.00) (1,352,242.01) 100.60 8,092.01 675‐4610‐10‐00‐2019‐EM Interest Income‐Collin County (3,192.62) (1,031.51) ‐ 3,192.62 675‐4610‐10‐00‐2022‐EM Interest Income‐Denton County (359.68) (159.50) ‐ 359.68 675‐4610‐10‐00‐2023‐EM Interest Income‐HHS (23.62) (6.07) ‐ 23.62 Subtotal object ‐ 04 (3,575.92) (1,197.08) ‐ 3,575.92 Program number: DEFAULT (1,344,150.00) (1,344,150.00) (1,355,817.93) (1,197.08) 100.87 11,667.93 Department number: 10 ADMINISTRATION (1,344,150.00) (1,344,150.00) (1,355,817.93) (1,197.08) 100.87 11,667.93 Revenue Subtotal ‐ ‐ ‐ ‐ ‐ ‐ (1,344,150.00) (1,344,150.00) (1,355,817.93) (1,197.08) 100.87 11,667.93 675‐5110‐10‐00 Salaries & Wages 75,000.00 75,000.00 ‐ 75,000.00 Subtotal object ‐ 05 75,000.00 75,000.00 ‐ 75,000.00 675‐5210‐10‐00‐2019‐EM Office Supplies‐Collin Cnty 299.00 ‐ (299.00) 52Page 69Item 3.
675‐5210‐10‐00‐2022‐EM Office Supplies‐Denton Cnty 53.98 ‐ (53.98) 675‐5212‐10‐00 Building Supplies 15,000.00 15,000.00 ‐ 15,000.00 675‐5212‐10‐00‐2022‐EM Building Supplies‐Denton Cnty 9,915.32 2,226.30 ‐ (9,915.32) 675‐5213‐10‐00‐2022‐EM Custodial Supplies‐Denton Cnty 3,780.48 ‐ (3,780.48) 675‐5220‐10‐00 Office Equipment 59,650.00 59,650.00 ‐ 59,650.00 675‐5220‐10‐00‐2019‐EM Office Equipment‐Collin County 88,150.62 ‐ (88,150.62) 675‐5220‐10‐00‐2022‐EM Office Equipment‐Denton County 4,826.28 ‐ (4,826.28) 675‐5225‐10‐00‐2019‐EM Computer Hardware‐Collin Cnty 3,247.48 ‐ (3,247.48) 675‐5225‐10‐00‐2022‐EM Computer Hardware‐Denton Cnty 100,275.86 ‐ (100,275.86) Subtotal object ‐ 05 74,650.00 74,650.00 22,122.54 2,226.30 188,426.48 29.64 (135,899.02) 675‐5307‐10‐00‐2019‐EM Econ Dev Grant Exp‐Collin Cnty 103,500.00 103,500.00 101,000.00 97.59 2,500.00 675‐5310‐10‐00 Rental Expense 10,000.00 10,000.00 ‐ 10,000.00 675‐5310‐10‐00‐2022‐EM Rental Expense‐Denton Cnty 6,140.00 ‐ (6,140.00) 675‐5335‐10‐00‐2019‐EM Radio/Video Equip & Rprs‐Colln 15,084.93 15,084.93 ‐ (15,084.93) Subtotal object ‐ 05 113,500.00 113,500.00 122,224.93 15,084.93 107.69 (8,724.93) 675‐5410‐10‐00‐2022‐EM Professional Services‐Denton 1,425.00 ‐ (1,425.00) 675‐5418‐10‐00 IT Fees 5,000.00 5,000.00 ‐ 5,000.00 675‐5418‐10‐00‐2019‐EM IT Fees‐Collin Cnty 1,890.00 ‐ (1,890.00) 675‐5418‐10‐00‐2022‐EM IT Fees‐Denton Cnty 3,683.07 282.74 ‐ (3,683.07) 675‐5430‐10‐00 Legal Fees 25,000.00 25,000.00 ‐ 25,000.00 675‐5430‐10‐00‐2019‐EM Legal Fees‐Collin Cnty 25,806.00 1,026.00 ‐ (25,806.00) 675‐5440‐10‐00 Emergency Supplies 50,000.00 50,000.00 ‐ 50,000.00 675‐5440‐10‐00‐2022‐EM Emergency Supplies‐Denton Cnty 1,462.00 ‐ (1,462.00) 675‐5445‐10‐00‐2019‐EM Emergency Mgmt‐Collin Cnty 34.62 ‐ (34.62) 675‐5445‐10‐00‐2022‐EM Emergency Mgmt‐Denton Cnty 3,415.34 ‐ (3,415.34) 675‐5480‐10‐00‐2019‐EM Contracted Services‐Collin Cty 75.00 ‐ (75.00) 675‐5480‐10‐00‐2022‐EM Contracted Services‐Denton Cty 7,065.37 7,065.37 ‐ (7,065.37) Subtotal object ‐ 05 80,000.00 80,000.00 44,856.40 8,374.11 56.07 35,143.60 675‐5530‐10‐00 Travel 1,000.00 1,000.00 ‐ 1,000.00 675‐5530‐10‐00‐2022‐EM Travel‐Denton Cnty 934.85 ‐ (934.85) Subtotal object ‐ 05 1,000.00 1,000.00 934.85 93.49 65.15 675‐5630‐10‐00 Safety Equipment 350,000.00 350,000.00 ‐ 350,000.00 675‐5630‐10‐00‐2019‐EM Safety Equipment‐Collin Cnty 1,019.90 1,019.90 ‐ (1,019.90) 675‐5630‐10‐00‐2022‐EM Safety Equipment‐Denton Cnty 39,946.29 5,684.40 ‐ (39,946.29) 675‐5630‐10‐00‐2023‐EM Safety Equiipment ‐ HHS CARES 2,510.47 2,510.47 5,700.00 ‐ (8,210.47) 675‐5640‐10‐00‐2019‐EM Signs & Hardware‐Collin Cnty 394.44 4,532.29 ‐ (4,926.73) 675‐5640‐10‐00‐2022‐EM Signs & Hardware‐Denton Cnty 510.00 ‐ (510.00) Subtotal object ‐ 05 350,000.00 350,000.00 44,381.10 9,214.77 10,232.29 12.68 295,386.61 675‐6110‐10‐00 Capital Expenditure 650,000.00 650,000.00 ‐ 650,000.00 675‐6110‐10‐00‐2019‐EM Capital Expenditure‐CollinCnty 567,075.58 ‐ (567,075.58) 675‐6140‐10‐00‐2019‐EM Capital Expense‐Equip‐Collin 14,935.80 ‐ (14,935.80) 675‐6140‐10‐00‐2022‐EM Capital Expense‐Equip‐Denton 15,113.40 15,113.40 17,895.00 ‐ (33,008.40) Subtotal object ‐ 06 650,000.00 650,000.00 15,113.40 15,113.40 599,906.38 2.33 34,980.22 Program number: DEFAULT 1,344,150.00 1,344,150.00 249,633.22 50,013.51 798,565.15 18.57 295,951.63 Department number: 10 ADMINISTRATION 1,344,150.00 1,344,150.00 249,633.22 50,013.51 798,565.15 18.57 295,951.63 Expense Subtotal ‐ ‐ ‐ ‐ ‐ ‐ 1,344,150.00 1,344,150.00 249,633.22 50,013.51 798,565.15 18.57 295,951.63 Fund number: 675 CARES ACT FUND (1,106,184.71) 48,816.43 798,565.15 ‐ 307,619.56 680‐4041‐50‐00 W Thoroughfare Impact Fees (2,500,000.00) (2,500,000.00) (3,465,462.85) (276,254.63) 138.62 965,462.85 Subtotal object ‐ 04 (2,500,000.00) (2,500,000.00) (3,465,462.85) (276,254.63) 138.62 965,462.85 680‐4610‐50‐00 Interest (30,000.00) (30,000.00) (35,632.59) (3,444.58) 118.78 5,632.59 Subtotal object ‐ 04 (30,000.00) (30,000.00) (35,632.59) (3,444.58) 118.78 5,632.59 680‐4910‐50‐00 Other Revenue (110,980.00) (110,980.00) ‐ (110,980.00) Subtotal object ‐ 04 (110,980.00) (110,980.00) ‐ (110,980.00) Program number: DEFAULT PROGRAM (2,640,980.00) (2,640,980.00) (3,501,095.44) (279,699.21) 132.57 860,115.44 Department number: 50 IMPACT FEES (2,640,980.00) (2,640,980.00) (3,501,095.44) (279,699.21) 132.57 860,115.44 Revenue Subtotal ‐ ‐ ‐ ‐ ‐ ‐ (2,640,980.00) (2,640,980.00) (3,501,095.44) (279,699.21) 132.57 860,115.44 53Page 70Item 3.
680‐5410‐50‐00‐2012‐ST Fishtrap (Elem‐DNT) 100,000.00 (100,000.00) ‐ 680‐5410‐50‐00‐2013‐ST Prof. Svcs Teel 380 Inter Imp 100,000.00 100,000.00 1,045.43 94,939.57 1.05 4,015.00 680‐5489‐50‐00 DEVELOPER AGREEMENT REIMBURSE 750,000.00 (750,000.00) ‐ 680‐5489‐50‐00‐8006‐DV Development Agrmnt Parks/Legac 300,000.00 300,000.00 178,839.00 102,157.00 59.61 121,161.00 680‐5489‐50‐00‐8007‐DV TVG West Propser Rds Impact Fe 600,000.00 600,000.00 ‐ 600,000.00 680‐5489‐50‐00‐8011‐DV Dev Agrment Star Trail 750,000.00 750,000.00 725,543.00 293,373.00 96.74 24,457.00 680‐5489‐50‐00‐8012‐DV Dev Agrmnt Tellus Windsong 750,000.00 750,000.00 476,795.67 63.57 273,204.33 Subtotal object ‐ 05 2,500,000.00 2,500,000.00 1,382,223.10 395,530.00 94,939.57 55.29 1,022,837.33 680‐6410‐50‐00‐1708‐ST Land Acq. Cook Lane 0.86 ‐ (0.86) Subtotal object ‐ 06 0.86 ‐ (0.86) 680‐6610‐50‐00‐1708‐ST Cook Lane (First ‐ End) 667,822.26 667,822.26 109,020.95 488,320.81 16.33 70,480.50 680‐6610‐50‐00‐1928‐TR Traffic Signal (Fishtrap/Teel) 250,000.00 150,000.00 400,000.00 111,489.31 66,647.10 286,329.00 27.87 2,181.69 680‐6610‐50‐00‐2004‐TR Traffic Signal (Fishtrap/Gee) 300,000.00 300,000.00 17,240.00 77,102.00 5.75 205,658.00 680‐6610‐50‐00‐2006‐TR Traffic Signal(Fishtrap/Wndsn) 50,000.00 50,000.00 ‐ 50,000.00 680‐6610‐50‐00‐2013‐ST Teel ‐ 380 Intersection Imp 100,000.00 (100,000.00) ‐ Subtotal object ‐ 06 700,000.00 717,822.26 1,417,822.26 237,750.26 66,647.10 851,751.81 16.77 328,320.19 680‐7144‐50‐00 Transfer to Capital Proj Fund 100,000.00 100,000.00 100,000.00 100.00 Subtotal object ‐ 07 100,000.00 100,000.00 100,000.00 100.00 Program number: DEFAULT PROGRAM 3,200,000.00 817,822.26 4,017,822.26 1,719,974.22 462,177.10 946,691.38 42.81 1,351,156.66 Department number: 50 IMPACT FEES 3,200,000.00 817,822.26 4,017,822.26 1,719,974.22 462,177.10 946,691.38 42.81 1,351,156.66 Expense Subtotal ‐ ‐ ‐ ‐ ‐ ‐ 3,200,000.00 817,822.26 4,017,822.26 1,719,974.22 462,177.10 946,691.38 42.81 1,351,156.66 Fund number: 680 W THOROUGHFARE IMPACT FEES 559,020.00 817,822.26 1,376,842.26 (1,781,121.22) 182,477.89 946,691.38 2,211,272.10 730‐4530‐10‐00 Employee Health Contributions (555,930.00) (555,930.00) (524,120.16) (51,061.19) 94.28 (31,809.84) 730‐4531‐10‐00 Employee Dental Contributions (99,166.00) (99,166.00) (86,407.36) (8,737.29) 87.13 (12,758.64) 730‐4535‐10‐00 Employer Health Contributions (2,243,374.00) (2,243,374.00) (1,914,996.85) (170,096.49) 85.36 (328,377.15) 730‐4536‐10‐00 Employer Dental Contributions (92,591.00) (92,591.00) (80,478.29) (8,100.20) 86.92 (12,112.71) 730‐4537‐10‐00 Employer HSA Contributions (193,421.00) (193,421.00) ‐ (193,421.00) 730‐4540‐10‐00 Contractor Insurance Premium (20,841.02) (1,896.88) ‐ 20,841.02 Subtotal object ‐ 04 (3,184,482.00) (3,184,482.00) (2,626,843.68) (239,892.05) 82.49 (557,638.32) 730‐4610‐10‐00 Interest Income (7,000.00) (7,000.00) (9,414.23) (710.84) 134.49 2,414.23 Subtotal object ‐ 04 (7,000.00) (7,000.00) (9,414.23) (710.84) 134.49 2,414.23 Program number: DEFAULT PROGRAM (3,191,482.00) (3,191,482.00) (2,636,257.91) (240,602.89) 82.60 (555,224.09) Department number: 10 ADMINISTRATION (3,191,482.00) (3,191,482.00) (2,636,257.91) (240,602.89) 82.60 (555,224.09) Revenue Subtotal ‐ ‐ ‐ ‐ ‐ ‐ (3,191,482.00) (3,191,482.00) (2,636,257.91) (240,602.89) 82.60 (555,224.09) 730‐5160‐10‐00 Health Insurance 2,570,237.00 2,570,237.00 1,933,264.05 210,401.35 75.22 636,972.95 730‐5161‐10‐00 PCORI Fees 990.00 990.00 525.78 53.11 464.22 730‐5162‐10‐00 HSA Expense 193,421.00 193,421.00 182,119.20 2,219.00 94.16 11,301.80 730‐5165‐10‐00 Dental Insurance 191,758.00 191,758.00 159,833.47 83.35 31,924.53 730‐5170‐10‐00 Life Insurance/AD&D 42,000.00 42,000.00 33,367.54 79.45 8,632.46 730‐5185‐10‐00 Long/Short Term Disability 31,200.00 31,200.00 25,685.70 82.33 5,514.30 Subtotal object ‐ 05 3,029,606.00 3,029,606.00 2,334,795.74 212,620.35 77.07 694,810.26 730‐5410‐10‐00 Professional Services 25,000.00 25,000.00 31,750.00 127.00 (6,750.00) 730‐5480‐10‐00 Contract Services 45,335.00 3,800.00 49,135.00 40,169.45 1,804.60 81.75 8,965.55 Subtotal object ‐ 05 70,335.00 3,800.00 74,135.00 71,919.45 1,804.60 97.01 2,215.55 730‐5600‐10‐00 Special Events 12,000.00 12,000.00 ‐ 12,000.00 Subtotal object ‐ 05 12,000.00 12,000.00 ‐ 12,000.00 Program number: DEFAULT PROGRAM 3,111,941.00 3,800.00 3,115,741.00 2,406,715.19 214,424.95 77.24 709,025.81 Department number: 10 ADMINISTRATION 3,111,941.00 3,800.00 3,115,741.00 2,406,715.19 214,424.95 77.24 709,025.81 Expense Subtotal ‐ ‐ ‐ ‐ ‐ ‐ 3,111,941.00 3,800.00 3,115,741.00 2,406,715.19 214,424.95 77.24 709,025.81 Fund number: 730 EMPLOYEE HEALTH/INSURANCE FUND (79,541.00) 3,800.00 (75,741.00) (229,542.72) (26,177.94) 303.06 153,801.72 750‐4610‐10‐00 Interest Income (161,992.53) (5,913.51) ‐ 161,992.53 750‐4612‐10‐00 Interest‐2006 Bond (342.14) ‐ 342.14 750‐4618‐10‐00 Interest TXDOT Contributions (496.61) (7.57) ‐ 496.61 Subtotal object ‐ 04 (162,831.28) (5,921.08) ‐ 162,831.28 750‐4993‐10‐00 Transfer from Impact Fees (204,168.00) (204,168.00) (204,168.00) 100.00 750‐4995‐10‐00 Transfer In 393,598.00 (2,185,123.00) (1,791,525.00) (1,761,770.36) 3,611.14 98.34 (29,754.64) 54Page 71Item 3.
750‐4997‐10‐00 Transfers In ‐ Bond Funds (11,396,460.00) (4,111,134.08) ‐ 11,396,460.00 750‐4999‐10‐00 Bond Proceeds 12,390,000.00 (24,780,000.00) (12,390,000.00) ‐ (12,390,000.00) Subtotal object ‐ 04 12,783,598.00 (27,169,291.00) (14,385,693.00) (13,362,398.36) (4,107,522.94) 92.89 (1,023,294.64) Program number: DEFAULT PROGRAM 12,783,598.00 (27,169,291.00) (14,385,693.00) (13,525,229.64) (4,113,444.02) 94.02 (860,463.36) Department number: 10 CAPITAL PROJECTS 12,783,598.00 (27,169,291.00) (14,385,693.00) (13,525,229.64) (4,113,444.02) 94.02 (860,463.36) Revenue Subtotal ‐ ‐ ‐ ‐ ‐ ‐ 12,783,598.00 (27,169,291.00) (14,385,693.00) (13,525,229.64) (4,113,444.02) 94.02 (860,463.36) 750‐5405‐10‐00‐1507‐ST W Prosper Rd Land Acq Svcs 10,375.00 ‐ (10,375.00) 750‐5405‐10‐00‐1512‐ST Land Acq Svcs First St 1,800.00 ‐ (1,800.00) 750‐5405‐10‐00‐1710‐ST Coit Rd(First‐Frontier) 4 Lns 800,000.00 800,000.00 ‐ 800,000.00 750‐5405‐10‐00‐1823‐ST Victory Way Acq Svcs 30,000.00 ‐ (30,000.00) 750‐5405‐10‐00‐2008‐ST Acq Svcs‐Prspr Trl Coit‐Custer 1,000.00 ‐ (1,000.00) 750‐5410‐10‐00‐1512‐ST Prof Svcs First St (DNT‐Clmn) 599,971.00 ‐ (599,971.00) 750‐5410‐10‐00‐1723‐PK HWY 289 Gateway Monument 1,125.00 1,125.00 1,803.00 1,000.00 160.27 (1,678.00) 750‐5410‐10‐00‐1813‐PK US380 Median Design 18,000.00 18,000.00 875.00 15,575.00 4.86 1,550.00 750‐5410‐10‐00‐1823‐ST Victory Way (Coleman‐Frontier) 68,812.40 68,812.40 53,414.70 6,872.30 37,897.70 77.62 (22,500.00) 750‐5410‐10‐00‐1824‐ST Fishtrap ‐ Teel Int Improve 96,450.00 13,174.81 109,624.81 5,975.68 848.00 15,835.38 5.45 87,813.75 750‐5410‐10‐00‐1825‐ST Coleman (Gorgeous‐Prosper Trl) 4,585.41 4,585.41 4,585.41 100.00 750‐5410‐10‐00‐1830‐ST Prosper Trl (DNT Intersection) 4,804.80 4,804.80 4,804.80 100.00 750‐5410‐10‐00‐1904‐FC PS Facility Development Costs 550,000.00 550,000.00 52,077.96 9.47 497,922.04 750‐5410‐10‐00‐1921‐PK Town Hall Open Space Enhancemn 5,975.00 5,975.00 6,010.00 100.59 (35.00) 750‐5410‐10‐00‐1922‐PK Prof Svcs. Downtown Monument 2,500.00 ‐ (2,500.00) 750‐5410‐10‐00‐1923‐ST Fishtrap Section 1 & 4 202,500.00 202,500.00 165,500.00 56,200.00 81.73 (19,200.00) 750‐5410‐10‐00‐1926‐PK Whitley Place H&B Trail Extens 10,000.00 (10,000.00) ‐ 750‐5410‐10‐00‐1928‐TR Traffic Signal Fishtrap/Teel 21,122.00 21,122.00 15,100.00 7,022.00 71.49 (1,000.00) 750‐5410‐10‐00‐2012‐ST Fishtrap (Elem‐DNT) 4 Lanes 800,000.00 100,000.00 900,000.00 313,750.00 113,050.00 586,250.00 34.86 750‐5410‐10‐00‐2014‐ST First St (Coit‐Custer) 4 Lns 1,000,000.00 1,000,000.00 321,250.00 40,250.00 678,750.00 32.13 750‐5410‐10‐00‐2015‐PK Pecan Grove Phase II 67,000.00 67,000.00 50,940.00 ‐ 16,060.00 750‐5419‐10‐00‐1511‐ST Prosper Trail (Kroger to Coit) 17,915.00 17,915.00 17,915.00 ‐ 750‐5419‐10‐00‐1512‐ST First Street (DNT to Coleman) 118,546.49 118,546.49 118,546.49 ‐ 750‐5430‐10‐00‐1507‐ST Legal Fees‐W Prosper Rd Improv 40,602.73 76.00 ‐ (40,602.73) 750‐5430‐10‐00‐1511‐ST Legal Fees‐Prosper Trail (K‐C) 494.00 ‐ (494.00) 750‐5430‐10‐00‐1708‐ST Lgl Fees Cook Lane (First‐End) 779.00 ‐ (779.00) 750‐5430‐10‐00‐1713‐FC Legal ‐ PS Complex Ph1 19.00 ‐ (19.00) 750‐5430‐10‐00‐1721‐ST Acacia Parkway Legal Fees 67,147.92 12,524.09 ‐ (67,147.92) 750‐5430‐10‐00‐1830‐ST Legal ‐ Prosper Trl (DNT inte) 95.00 ‐ (95.00) 750‐5430‐10‐00‐1923‐ST Legal ‐ Fishtrap Sec. 1 and 4 8,434.20 ‐ (8,434.20) 750‐5430‐10‐00‐1932‐ST Legal ‐ Coit Rd/US 380 38.00 ‐ (38.00) 750‐5430‐10‐00‐1933‐ST Legal Fishtrap (seg 2) PISD 1,634.00 ‐ (1,634.00) 750‐5430‐10‐00‐2008‐ST Legal‐Prspr Trl (Coit‐Custer) 494.00 ‐ (494.00) 750‐5435‐10‐00‐1723‐PK Legal Notices ‐ 1723PK 58.00 ‐ (58.00) 750‐5435‐10‐00‐1823‐ST Legal Notices ‐ 1823ST 682.00 ‐ (682.00) Subtotal object ‐ 05 2,773,450.00 1,116,560.91 3,890,010.91 1,106,999.40 173,620.39 2,190,202.57 28.46 592,808.94 750‐6110‐10‐00‐1805‐ST FM2478 (US380‐FM1461) 243,373.00 243,373.00 68,832.15 28.28 174,540.85 750‐6140‐10‐00‐1901‐EQ Aerial Ladder Truck 227,305.28 227,305.28 240,334.37 739.36 4,391.99 105.73 (17,421.08) 750‐6160‐10‐00‐1901‐EQ Aerial Ladder Truck 982,701.29 982,701.29 982,701.29 100.00 Subtotal object ‐ 06 1,453,379.57 1,453,379.57 1,291,867.81 739.36 4,391.99 88.89 157,119.77 750‐6410‐10‐00‐1923‐ST Fishtrap Sec 1 & 4 Land Acq 346,985.50 ‐ (346,985.50) 750‐6410‐10‐00‐2008‐ST Land Acq ROW‐PrsprTrl Coit‐Cus 38,038.91 340.00 ‐ (38,038.91) Subtotal object ‐ 06 385,024.41 340.00 ‐ (385,024.41) 750‐6610‐10‐00‐1412‐ST Downtown Enhancements 20,040.00 20,040.00 1,040.00 6,000.00 5.19 13,000.00 750‐6610‐10‐00‐1507‐ST West Prosper Rd Improvements 3,404,618.00 82,032.24 3,486,650.24 1,343,668.28 20,363.42 256,153.80 38.54 1,886,828.16 750‐6610‐10‐00‐1511‐ST Prosper Trail (Kroger to Coit) 208,166.00 1,048,023.26 1,256,189.26 899,677.54 (24,073.52) 224,540.20 71.62 131,971.52 750‐6610‐10‐00‐1513‐ST Old Town Streets 15,903.99 15,903.99 11,460.30 6,794.29 72.06 (2,350.60) 750‐6610‐10‐00‐1701‐ST Eighth Street (Church‐PISD) 5,758.55 5,758.55 3,656.71 63.50 2,101.84 750‐6610‐10‐00‐1702‐ST Field Street (First‐Broadway) 1,547.20 1,547.20 1,557.25 100.65 (10.05) 750‐6610‐10‐00‐1708‐ST Cook Lane (First‐End) 2,100,000.00 2,100,000.00 727,630.84 299,392.60 392,513.54 34.65 979,855.62 55Page 72Item 3.
750‐6610‐10‐00‐1713‐FC Public Safety Complex, Ph 1 288,146.44 288,146.44 205,131.51 19,698.00 126,716.37 71.19 (43,701.44) 750‐6610‐10‐00‐1714‐FC Town Hall FFE 18,847.71 18,847.71 11,994.56 6,800.00 63.64 53.15 750‐6610‐10‐00‐1723‐PK HWY 289 Gateway Monument 164,987.38 164,987.38 164,987.38 100.00 750‐6610‐10‐00‐1801‐PK Whitley Place H&B Trail Extens 8,437.50 8,437.50 6,312.50 169,375.00 74.82 (167,250.00) 750‐6610‐10‐00‐1803‐ST Fifth St (Coleman‐Church) 2,511.69 2,511.69 7,191.09 286.31 (4,679.40) 750‐6610‐10‐00‐1804‐ST Third St (Main‐Coleman) 5,714.20 5,714.20 ‐ 5,714.20 750‐6610‐10‐00‐1809‐FC Parks and Public Works Complex 5.19 ‐ (5.19) 750‐6610‐10‐00‐1818‐PK Turf Irrigation SH289 68,000.00 68,000.00 48,934.93 ‐ 19,065.07 750‐6610‐10‐00‐1819‐ST Coleman Street (At Prosper HS) 90,000.00 90,000.00 ‐ 90,000.00 750‐6610‐10‐00‐1823‐ST Victory Way (Coleman‐Frontier) 2,250,000.00 2,250,000.00 462,607.88 405,201.05 1,528,796.37 20.56 258,595.75 750‐6610‐10‐00‐1824‐ST Fishtrap‐Teel Intersection Imp 1,350,000.00 50,000.00 1,400,000.00 1,124,891.72 442,792.71 275,091.38 80.35 16.90 750‐6610‐10‐00‐1825‐ST Coleman (Gorgeous‐Prosper Trl) 10,570.00 10,570.00 10,570.00 100.00 750‐6610‐10‐00‐1827‐TR US 380 Median Lighting 485,000.00 485,000.00 174,493.82 291,558.68 35.98 18,947.50 750‐6610‐10‐00‐1830‐ST Prosper Trl (DNT Intersection) 1,600,000.00 1,600,000.00 ‐ 1,600,000.00 750‐6610‐10‐00‐1905‐FC PS Facility‐Construction 10,391,848.82 10,391,848.82 9,504,572.15 526,461.13 685,142.67 91.46 202,134.00 750‐6610‐10‐00‐1906‐FC Public Safety Complex FFE 1,165,000.00 1,165,000.00 431,671.38 151,897.72 639,506.72 37.05 93,821.90 750‐6610‐10‐00‐1909‐TR Traffic Signal (Coit & First) 288,244.00 288,244.00 264,359.00 41,939.66 91.71 (18,054.66) 750‐6610‐10‐00‐1926‐PK Whitley Place H&B Trail Extens 270,000.00 10,000.00 280,000.00 15,725.00 ‐ 264,275.00 750‐6610‐10‐00‐1929‐ST BNSF Quiet Zone First/Fifth 145,000.00 145,000.00 ‐ 145,000.00 750‐6610‐10‐00‐1932‐ST Coit Road and US 380 125,000.00 125,000.00 53,653.76 53,653.76 67,360.14 42.92 3,986.10 750‐6610‐10‐00‐2008‐ST Prosper Trl(Coit‐Custer) 2Lns 4,750,000.00 1,372,000.00 6,122,000.00 111,341.27 2,212.17 5,246,989.78 1.82 763,668.95 750‐6610‐10‐00‐2009‐ST Fishtrap, Seg 1 (Teel‐Mid Sch) 1,190,000.00 1,190,000.00 1,441,092.13 1,441,092.13 121.10 (251,092.13) 750‐6610‐10‐00‐2016‐PK Frontier Park Storage 147,927.00 147,927.00 10,722.72 7.25 137,204.28 Subtotal object ‐ 06 14,962,784.00 18,170,539.98 33,133,323.98 16,974,288.98 3,338,691.17 10,029,938.53 51.23 6,129,096.47 750‐7142‐10‐00 Transfer to W/S 47,737.35 ‐ (47,737.35) Subtotal object ‐ 07 47,737.35 ‐ (47,737.35) Program number: DEFAULT PROGRAM 17,736,234.00 20,740,480.46 38,476,714.46 19,805,917.95 3,513,390.92 12,224,533.09 51.48 6,446,263.42 Department number: 10 CAPITAL PROJECTS 17,736,234.00 20,740,480.46 38,476,714.46 19,805,917.95 3,513,390.92 12,224,533.09 51.48 6,446,263.42 Expense Subtotal ‐ ‐ ‐ ‐ ‐ ‐ 17,736,234.00 20,740,480.46 38,476,714.46 19,805,917.95 3,513,390.92 12,224,533.09 51.48 6,446,263.42 Fund number: 750 CAPITAL PROJECTS 30,519,832.00 (6,428,810.54) 24,091,021.46 6,280,688.31 (600,053.10) 12,224,533.09 26.07 5,585,800.06 760‐4610‐10‐00 Interest Income (120,493.00) (7,706.89) ‐ 120,493.00 Subtotal object ‐ 04 (120,493.00) (7,706.89) ‐ 120,493.00 760‐4995‐10‐00 Transfers In (4,126,507.00) (4,126,507.00) (4,126,507.00) 100.00 760‐4997‐10‐00 Transfers In ‐ Bond Funds (6,073,231.83) (567,234.25) ‐ 6,073,231.83 Subtotal object ‐ 04 (4,126,507.00) (4,126,507.00) (10,199,738.83) (567,234.25) 247.18 6,073,231.83 Program number: DEFAULT PROGRAM (4,126,507.00) (4,126,507.00) (10,320,231.83) (574,941.14) 250.10 6,193,724.83 Department number: 10 CAPITAL PROJECTS‐W/S (4,126,507.00) (4,126,507.00) (10,320,231.83) (574,941.14) 250.10 6,193,724.83 Revenue Subtotal ‐ ‐ ‐ ‐ ‐ ‐ (4,126,507.00) (4,126,507.00) (10,320,231.83) (574,941.14) 250.10 6,193,724.83 760‐5430‐10‐00‐1613‐DR Legal Old Town Dr Church/Parvi 85.50 ‐ (85.50) 760‐5430‐10‐00‐1715‐WA Legal Fees ‐ Fishtrap EST 133.00 ‐ (133.00) 760‐5430‐10‐00‐1716‐WA Legal ‐ 24" WL Conn. Cnty Line 2,052.00 ‐ (2,052.00) 760‐5430‐10‐00‐1718‐DR Legal Old Town Regional Retent 85.50 ‐ (85.50) 760‐5430‐10‐00‐1902‐WA Legal Fees‐Custer Rd Meter Sta 133.00 ‐ (133.00) 760‐5435‐10‐00‐1613‐DR Legal Notices Church/Parvin 109.80 ‐ (109.80) 760‐5435‐10‐00‐1902‐WA Custer Rd Stat/Legal Filings 226.00 ‐ (226.00) Subtotal object ‐ 05 2,824.80 ‐ (2,824.80) 760‐6410‐10‐00‐1716‐WA Water Supply Line Ph I Esment 132.00 ‐ (132.00) 760‐6410‐10‐00‐1902‐WA Land Acq Custer Rd Meter Stat 53,244.00 53,244.00 ‐ 53,244.00 Subtotal object ‐ 06 53,244.00 53,244.00 132.00 0.25 53,112.00 760‐6610‐10‐00‐1501‐WA Lower Pressure Pln 42" Trns Ln 1,434,400.00 1,434,400.00 762,042.40 132,227.00 672,357.60 53.13 760‐6610‐10‐00‐1613‐DR Old Town Drainage‐Church/Parvi 427,564.00 9,800.00 437,364.00 6,000.00 338,646.40 1.37 92,717.60 760‐6610‐10‐00‐1708‐WA EW Collector (Cook ‐ DNT) 411,000.00 411,000.00 56,780.58 22,823.30 13.82 331,396.12 760‐6610‐10‐00‐1715‐WA Fishtrap Elevated Storage Tank 4,673,862.41 4,673,862.41 2,898,422.04 1,381,282.39 62.01 394,157.98 760‐6610‐10‐00‐1716‐WA Water Supply Line Phase I 4,806,792.64 4,806,792.64 3,199,710.00 134,739.00 66.57 1,472,343.64 760‐6610‐10‐00‐1718‐DR Old Town Regional Retention 479,365.00 21,400.00 500,765.00 7,400.00 491,604.00 1.48 1,761.00 760‐6610‐10‐00‐1902‐WA Custer Rd Meter Stat/WL Reloc 3,735,355.22 3,735,355.22 140,242.22 3,595,113.33 3.75 (0.33) 56Page 73Item 3.
760‐6610‐10‐00‐1903‐WW Church/Parvin WW Reconstruct 100,000.00 100,000.00 92,699.60 ‐ 7,300.40 760‐6610‐10‐00‐1924‐WA Fifth Street Water Line 6,830.00 6,830.00 7,540.00 110.40 (710.00) 760‐6610‐10‐00‐1930‐WA Broadway (Parvin‐Craig) 150,000.00 150,000.00 ‐ 150,000.00 760‐6610‐10‐00‐1932‐WA Coit Rd/US 380 Water Valve 7,275.70 ‐ (7,275.70) Subtotal object ‐ 06 1,006,929.00 15,249,440.27 16,256,369.27 7,078,137.24 132,227.00 6,736,541.32 43.54 2,441,690.71 Program number: DEFAULT PROGRAM 1,006,929.00 15,302,684.27 16,309,613.27 7,081,094.04 132,227.00 6,736,541.32 43.42 2,491,977.91 Department number: 10 CAPITAL PROJECTS‐W/S 1,006,929.00 15,302,684.27 16,309,613.27 7,081,094.04 132,227.00 6,736,541.32 43.42 2,491,977.91 Expense Subtotal ‐ ‐ ‐ ‐ ‐ ‐ 1,006,929.00 15,302,684.27 16,309,613.27 7,081,094.04 132,227.00 6,736,541.32 43.42 2,491,977.91 Fund number: 760 CAPITAL PROJECTS ‐ WATER/SEWER 1,006,929.00 11,176,177.27 12,183,106.27 (3,239,137.79) (442,714.14) 6,736,541.32 (26.59) 8,685,702.74 770‐4610‐10‐00 Interest Income (1,621.27) (29.95) ‐ 1,621.27 Subtotal object ‐ 04 (1,621.27) (29.95) ‐ 1,621.27 Program number: DEFAULT PROGRAM (1,621.27) (29.95) ‐ 1,621.27 Department number: 10 ADMINISTRATION (1,621.27) (29.95) ‐ 1,621.27 Revenue Subtotal ‐ ‐ ‐ ‐ ‐ ‐ (1,621.27) (29.95) ‐ 1,621.27 770‐7144‐10‐00 Transfer to Capital Projects 5,114.54 1,445.30 ‐ (5,114.54) Subtotal object ‐ 07 5,114.54 1,445.30 ‐ (5,114.54) Program number: DEFAULT PROGRAM 5,114.54 1,445.30 ‐ (5,114.54) Department number: 10 ADMINISTRATION 5,114.54 1,445.30 ‐ (5,114.54) Expense Subtotal ‐ ‐ ‐ ‐ ‐ ‐ 5,114.54 1,445.30 ‐ (5,114.54) Fund number: 770 2015 CERTIFICATES OF OBLIG 3,493.27 1,415.35 ‐ (3,493.27) 771‐4610‐10‐00 Interest Income (67.74) (4.36) ‐ 67.74 Subtotal object ‐ 04 (67.74) (4.36) ‐ 67.74 Program number: DEFAULT PROGRAM (67.74) (4.36) ‐ 67.74 Department number: 10 ADMINISTRATION (67.74) (4.36) ‐ 67.74 Revenue Subtotal ‐ ‐ ‐ ‐ ‐ ‐ (67.74) (4.36) ‐ 67.74 Fund number: 771 2016 CERTIFICATES OF OBLIG (67.74) (4.36) ‐ 67.74 772‐4610‐10‐00 Interest Income (103.05) ‐ 103.05 Subtotal object ‐ 04 (103.05) ‐ 103.05 Program number: DEFAULT PROGRAM (103.05) ‐ 103.05 Department number: 10 ADMINISTRATION (103.05) ‐ 103.05 Revenue Subtotal ‐ ‐ ‐ ‐ ‐ ‐ (103.05) ‐ 103.05 772‐7144‐10‐00 Transfer to Capital Projects 60,192.70 ‐ (60,192.70) Subtotal object ‐ 07 60,192.70 ‐ (60,192.70) Program number: DEFAULT PROGRAM 60,192.70 ‐ (60,192.70) Department number: 10 ADMINISTRATION 60,192.70 ‐ (60,192.70) Expense Subtotal ‐ ‐ ‐ ‐ ‐ ‐ 60,192.70 ‐ (60,192.70) Fund number: 772 2017 CERTIFICATES OF OBLIG 60,089.65 ‐ (60,089.65) 773‐4611‐98‐02 Interest ‐ 2016 CO Proceeds (3,290.25) (206.62) ‐ 3,290.25 Subtotal object ‐ 04 (3,290.25) (206.62) ‐ 3,290.25 Program number: 2 STORM DRAINAGE (3,290.25) (206.62) ‐ 3,290.25 Department number: 98 ENGINEERING (3,290.25) (206.62) ‐ 3,290.25 Revenue Subtotal ‐ ‐ ‐ ‐ ‐ ‐ (3,290.25) (206.62) ‐ 3,290.25 Fund number: 773 2016 CO BONDS ‐ DRAINAGE (3,290.25) (206.62) ‐ 3,290.25 774‐4612‐98‐02 Interest ‐ 2017 CO Proceeds (2,743.82) (57.75) ‐ 2,743.82 Subtotal object ‐ 04 (2,743.82) (57.75) ‐ 2,743.82 Program number: 2 STORM DRAINAGE (2,743.82) (57.75) ‐ 2,743.82 Department number: 98 ENGINEERING (2,743.82) (57.75) ‐ 2,743.82 Revenue Subtotal ‐ ‐ ‐ ‐ ‐ ‐ (2,743.82) (57.75) ‐ 2,743.82 Fund number: 774 2017 CO BOND ‐ DRAINAGE (2,743.82) (57.75) ‐ 2,743.82 775‐4610‐10‐00 Interest Income (4,960.43) (83.42) ‐ 4,960.43 Subtotal object ‐ 04 (4,960.43) (83.42) ‐ 4,960.43 Program number: DEFAULT PROGRAM (4,960.43) (83.42) ‐ 4,960.43 Department number: 10 ADMINISTRATION (4,960.43) (83.42) ‐ 4,960.43 Revenue Subtotal ‐ ‐ ‐ ‐ ‐ ‐ (4,960.43) (83.42) ‐ 4,960.43 775‐7144‐10‐00 Transfer to Capital Projects 12,551.35 ‐ (12,551.35) Subtotal object ‐ 07 12,551.35 ‐ (12,551.35) 57Page 74Item 3.
Program number: DEFAULT PROGRAM 12,551.35 ‐ (12,551.35) Department number: 10 ADMINISTRATION 12,551.35 ‐ (12,551.35) Expense Subtotal ‐ ‐ ‐ ‐ ‐ ‐ 12,551.35 ‐ (12,551.35) Fund number: 775 2018 CERTIFICATES OF OBLIG 7,590.92 (83.42) ‐ (7,590.92) 776‐4610‐10‐00 Interest Income (27,486.92) (331.53) ‐ 27,486.92 Subtotal object ‐ 04 (27,486.92) (331.53) ‐ 27,486.92 Program number: DEFAULT PROGRAM (27,486.92) (331.53) ‐ 27,486.92 Department number: 10 ADMINISTRATION (27,486.92) (331.53) ‐ 27,486.92 Revenue Subtotal ‐ ‐ ‐ ‐ ‐ ‐ (27,486.92) (331.53) ‐ 27,486.92 776‐7144‐10‐00 Transfer to Capital Projects 2,183,331.99 422,380.65 ‐ (2,183,331.99) Subtotal object ‐ 07 2,183,331.99 422,380.65 ‐ (2,183,331.99) Program number: DEFAULT PROGRAM 2,183,331.99 422,380.65 ‐ (2,183,331.99) Department number: 10 ADMINISTRATION 2,183,331.99 422,380.65 ‐ (2,183,331.99) Expense Subtotal ‐ ‐ ‐ ‐ ‐ ‐ 2,183,331.99 422,380.65 ‐ (2,183,331.99) Fund number: 776 2018 CO ‐ WATER 2,155,845.07 422,049.12 ‐ (2,155,845.07) 777‐4610‐10‐00 Interest Income (23,914.76) (156.14) ‐ 23,914.76 Subtotal object ‐ 04 (23,914.76) (156.14) ‐ 23,914.76 Program number: DEFAULT PROGRAM (23,914.76) (156.14) ‐ 23,914.76 Department number: 10 ADMINISTRATION (23,914.76) (156.14) ‐ 23,914.76 Revenue Subtotal ‐ ‐ ‐ ‐ ‐ ‐ (23,914.76) (156.14) ‐ 23,914.76 777‐7144‐10‐00 Transfer to Capital Projects 3,837,047.95 143,408.30 ‐ (3,837,047.95) Subtotal object ‐ 07 3,837,047.95 143,408.30 ‐ (3,837,047.95) Program number: DEFAULT PROGRAM 3,837,047.95 143,408.30 ‐ (3,837,047.95) Department number: 10 ADMINISTRATION 3,837,047.95 143,408.30 ‐ (3,837,047.95) Expense Subtotal ‐ ‐ ‐ ‐ ‐ ‐ 3,837,047.95 143,408.30 ‐ (3,837,047.95) Fund number: 777 CO BONDS ‐ WATER 3,813,133.19 143,252.16 ‐ (3,813,133.19) 779‐4610‐10‐00 Interest Income (119,043.19) (716.54) ‐ 119,043.19 Subtotal object ‐ 04 (119,043.19) (716.54) ‐ 119,043.19 Program number: DEFAULT PROGRAM (119,043.19) (716.54) ‐ 119,043.19 Department number: 10 ADMINISTRATION (119,043.19) (716.54) ‐ 119,043.19 Revenue Subtotal ‐ ‐ ‐ ‐ ‐ ‐ (119,043.19) (716.54) ‐ 119,043.19 779‐7144‐10‐00 Transfer to Capital Projects 10,016,251.20 3,900,607.17 ‐ (10,016,251.20) Subtotal object ‐ 07 10,016,251.20 3,900,607.17 ‐ (10,016,251.20) Program number: DEFAULT PROGRAM 10,016,251.20 3,900,607.17 ‐ (10,016,251.20) Department number: 10 ADMINISTRATION 10,016,251.20 3,900,607.17 ‐ (10,016,251.20) Expense Subtotal ‐ ‐ ‐ ‐ ‐ ‐ 10,016,251.20 3,900,607.17 ‐ (10,016,251.20) Fund number: 779 CO BONDS 9,897,208.01 3,899,890.63 ‐ (9,897,208.01) 780‐4610‐10‐00 Interest Income (7,783.21) (377.22) ‐ 7,783.21 Subtotal object ‐ 04 (7,783.21) (377.22) ‐ 7,783.21 Program number: DEFAULT PROGRAM (7,783.21) (377.22) ‐ 7,783.21 Department number: 10 ADMINISTRATION (7,783.21) (377.22) ‐ 7,783.21 Revenue Subtotal ‐ ‐ ‐ ‐ ‐ ‐ (7,783.21) (377.22) ‐ 7,783.21 780‐7144‐10‐00 Transfer to Capital Projects 95.00 (346,890.50) ‐ (95.00) Subtotal object ‐ 07 95.00 (346,890.50) ‐ (95.00) Program number: DEFAULT PROGRAM 95.00 (346,890.50) ‐ (95.00) Department number: 10 ADMINISTRATION 95.00 (346,890.50) ‐ (95.00) Expense Subtotal ‐ ‐ ‐ ‐ ‐ ‐ 95.00 (346,890.50) ‐ (95.00) Fund number: 780 2015 GENERAL OBLIGATIONS (7,688.21) (347,267.72) ‐ 7,688.21 782‐4610‐10‐00 Interest Income (3,970.30) (62.03) ‐ 3,970.30 Subtotal object ‐ 04 (3,970.30) (62.03) ‐ 3,970.30 Program number: DEFAULT PROGRAM (3,970.30) (62.03) ‐ 3,970.30 Department number: 10 ADMINISTRATION (3,970.30) (62.03) ‐ 3,970.30 Revenue Subtotal ‐ ‐ ‐ ‐ ‐ ‐ (3,970.30) (62.03) ‐ 3,970.30 782‐7144‐10‐00 Transfer to Capital Projects 109,952.34 ‐ (109,952.34) Subtotal object ‐ 07 109,952.34 ‐ (109,952.34) Program number: DEFAULT PROGRAM 109,952.34 ‐ (109,952.34) 58Page 75Item 3.
Department number: 10 ADMINISTRATION 109,952.34 ‐ (109,952.34) Expense Subtotal ‐ ‐ ‐ ‐ ‐ ‐ 109,952.34 ‐ (109,952.34) Fund number: 782 2018 GENERAL OBLIGATIONS 105,982.04 (62.03) ‐ (105,982.04) 785‐4610‐10‐00 Interest Income (39,278.22) (583.93) ‐ 39,278.22 Subtotal object ‐ 04 (39,278.22) (583.93) ‐ 39,278.22 Program number: DEFAULT PROGRAM (39,278.22) (583.93) ‐ 39,278.22 Department number: 10 ADMINISTRATION (39,278.22) (583.93) ‐ 39,278.22 Revenue Subtotal ‐ ‐ ‐ ‐ ‐ ‐ (39,278.22) (583.93) ‐ 39,278.22 785‐7144‐10‐00 Transfer to Capital Projects 1,197,417.41 557,417.41 ‐ (1,197,417.41) Subtotal object ‐ 07 1,197,417.41 557,417.41 ‐ (1,197,417.41) Program number: DEFAULT PROGRAM 1,197,417.41 557,417.41 ‐ (1,197,417.41) Department number: 10 ADMINISTRATION 1,197,417.41 557,417.41 ‐ (1,197,417.41) Expense Subtotal ‐ ‐ ‐ ‐ ‐ ‐ 1,197,417.41 557,417.41 ‐ (1,197,417.41) Fund number: 785 GENERAL OBLIGATION BONDS 1,158,139.19 556,833.48 ‐ (1,158,139.19) 800‐4120‐65‐00 Sales Taxes (2,750,000.00) (2,750,000.00) (2,905,450.97) (358,695.83) 105.65 155,450.97 Subtotal object ‐ 04 (2,750,000.00) (2,750,000.00) (2,905,450.97) (358,695.83) 105.65 155,450.97 800‐4610‐65‐00 Interest Income (100,000.00) (100,000.00) (89,935.51) (2,192.53) 89.94 (10,064.49) Subtotal object ‐ 04 (100,000.00) (100,000.00) (89,935.51) (2,192.53) 89.94 (10,064.49) 800‐4910‐65‐00 Other Revenue (133.78) ‐ 133.78 Subtotal object ‐ 04 (133.78) ‐ 133.78 Program number: DEFAULT PROGRAM (2,850,000.00) (2,850,000.00) (2,995,520.26) (360,888.36) 105.11 145,520.26 Department number: 65 ECONOMIC DEVELOPMENT (2,850,000.00) (2,850,000.00) (2,995,520.26) (360,888.36) 105.11 145,520.26 Revenue Subtotal ‐ ‐ ‐ ‐ ‐ ‐ (2,850,000.00) (2,850,000.00) (2,995,520.26) (360,888.36) 105.11 145,520.26 800‐5110‐65‐00 Salaries & Wages 384,092.00 384,092.00 308,052.62 26,773.54 80.20 76,039.38 800‐5140‐65‐00 Salaries ‐ Longevity Pay 320.00 320.00 320.00 100.00 800‐5141‐65‐00 Salary‐Incentive 25,000.00 25,000.00 ‐ 25,000.00 800‐5142‐65‐00 Car Allowance 14,400.00 14,400.00 14,300.00 1,300.00 99.31 100.00 800‐5143‐65‐00 Cell Phone Allowance 2,880.00 2,880.00 2,640.00 240.00 91.67 240.00 800‐5145‐65‐00 Social Security Expense 24,905.00 24,905.00 19,401.27 1,646.82 77.90 5,503.73 800‐5150‐65‐00 Medicare Expense 5,825.00 5,825.00 4,537.40 385.15 77.90 1,287.60 800‐5155‐65‐00 SUTA Expense 486.00 486.00 441.00 90.74 45.00 800‐5160‐65‐00 Health Insurance 35,381.00 35,381.00 19,080.60 3,046.80 53.93 16,300.40 800‐5165‐65‐00 Dental Insurance 1,398.00 1,398.00 849.96 108.72 60.80 548.04 800‐5170‐65‐00 Life Insurance/AD&D 517.00 517.00 136.18 12.38 26.34 380.82 800‐5175‐65‐00 Liability (TML)/Workers' Comp 764.00 764.00 810.99 75.93 106.15 (46.99) 800‐5180‐65‐00 TMRS Expense 54,430.00 54,430.00 43,772.05 3,807.92 80.42 10,657.95 800‐5185‐65‐00 Long/Short Term Disability 730.00 730.00 535.52 50.86 73.36 194.48 800‐5186‐65‐00 WELLE‐Wellness Prog Reimb‐Empl 1,200.00 1,200.00 550.00 50.00 45.83 650.00 800‐5189‐65‐00 Administrative Fees 15,000.00 15,000.00 13,750.00 1,250.00 91.67 1,250.00 800‐5190‐65‐00 Contract Labor 50,000.00 50,000.00 ‐ 50,000.00 Subtotal object ‐ 05 617,328.00 617,328.00 429,177.59 38,748.12 69.52 188,150.41 800‐5210‐65‐00 Office Supplies 2,500.00 2,500.00 2,535.71 216.77 101.43 (35.71) 800‐5212‐65‐00 Building Supplies 800.00 800.00 ‐ 800.00 800‐5220‐65‐00 Office Equipment 15,000.00 15,000.00 3,499.98 23.33 11,500.02 800‐5230‐65‐00 Dues,Fees,& Subscriptions 40,000.00 40,000.00 23,896.82 126.09 59.74 16,103.18 800‐5240‐65‐00 Postage and Delivery 1,000.00 1,000.00 762.50 76.25 237.50 800‐5265‐65‐00 Promotional Expense 85,000.00 85,000.00 17,771.24 5,359.24 20.91 67,228.76 800‐5280‐65‐00 Printing and Reproduction 5,000.00 (241.00) 4,759.00 830.87 17.46 3,928.13 Subtotal object ‐ 05 149,300.00 (241.00) 149,059.00 49,297.12 5,702.10 33.07 99,761.88 800‐5305‐65‐00 Chapt 380 Program Grant Exp 554,570.00 554,570.00 499,779.70 44,611.37 90.12 54,790.30 800‐5310‐65‐00 Rental Expense 60,000.00 60,000.00 52,342.87 4,757.71 87.24 7,657.13 800‐5330‐65‐00 Copier Expense 5,500.00 5,500.00 2,942.18 192.84 53.49 2,557.82 800‐5340‐65‐00 Building Repairs 500.00 500.00 ‐ 500.00 Subtotal object ‐ 05 620,570.00 620,570.00 555,064.75 49,561.92 89.44 65,505.25 800‐5410‐65‐00 Professional Services 225,000.00 225,000.00 54,859.05 4,120.00 11,250.00 24.38 158,890.95 800‐5412‐65‐00 Audit Fees 2,494.00 2,494.00 2,375.00 95.23 119.00 59Page 76Item 3.
800‐5430‐65‐00 Legal Fees 20,000.00 20,000.00 3,142.00 15.71 16,858.00 Subtotal object ‐ 05 247,494.00 247,494.00 60,376.05 4,120.00 11,250.00 24.40 175,867.95 800‐5520‐65‐00 Telephones 241.00 241.00 240.60 99.83 0.40 800‐5526‐65‐00 Data Network 1,000.00 1,000.00 684.12 75.98 68.41 315.88 800‐5530‐65‐00 Travel 30,000.00 30,000.00 2,689.88 8.97 27,310.12 800‐5531‐65‐00 Prospect Mtgs/Business Meals 10,000.00 10,000.00 3,938.49 354.28 39.39 6,061.51 800‐5533‐65‐00 Mileage Expense 500.00 500.00 125.50 25.10 374.50 800‐5536‐65‐00 Training/Seminars 15,000.00 15,000.00 713.00 4.75 14,287.00 Subtotal object ‐ 05 56,500.00 241.00 56,741.00 8,391.59 430.26 14.79 48,349.41 800‐6015‐65‐00 Project Incentives 100,000.00 100,000.00 ‐ 100,000.00 Subtotal object ‐ 06 100,000.00 100,000.00 ‐ 100,000.00 800‐7100‐65‐00 Operating Transfer Out 8,715.00 ‐ (8,715.00) Subtotal object ‐ 07 8,715.00 ‐ (8,715.00) Program number: DEFAULT PROGRAM 1,791,192.00 1,791,192.00 1,111,022.10 98,562.40 11,250.00 62.03 668,919.90 Department number: 65 ECONOMIC DEVELOPMENT 1,791,192.00 1,791,192.00 1,111,022.10 98,562.40 11,250.00 62.03 668,919.90 Expense Subtotal ‐ ‐ ‐ ‐ ‐ ‐ 1,791,192.00 1,791,192.00 1,111,022.10 98,562.40 11,250.00 62.03 668,919.90 Fund number: 800 ECONOMIC DEVELOPMENT CORPORATI (1,058,808.00) (1,058,808.00) (1,884,498.16) (262,325.96) 11,250.00 177.98 814,440.16 60Page 77Item 3.
Page 1 of 2
To: Mayor and Town Council
From: Betty Pamplin, Finance Director
Through: Harlan Jefferson, Town Manager
Chuck Springer, Executive Director of Administrative Services
Re: Town Council Meeting – October 13, 2020
Agenda Item:
Consider and act upon a resolution expressing official intent to reimburse costs of Town capital
improvement program projects that may be funded with proceeds of bonds or other obligations, if
those costs are paid prior to the issuance of such bonds or obligations. (BP)
Description of Agenda Item:
The attached resolution allows the Town to pay for the projects listed in the Fiscal Year 2020-2021
CIP, including costs associated with the construction of street improvements ($8,500,000), facility
improvements ($500,000), and drainage improvements ($1,000,000). The resolution provides for
up to $10,000,000 in capital project expenditures.
Budget Impact:
The reimbursement resolution itself has no budget impact; repayment of the expenditures will be
included in the debt service portion of the tax rate after the bonds are issued. Initial funding for the
work will come from the Capital Projects Fund.
Legal Obligations and Review:
Terrence Welch of Brown & Hofmeister, L.L.P. and Dan Culver of McCall, Parkhurst and Horton,
the Town’s bond counsel, have reviewed the resolution as to form and legality.
Attached Documents:
1. Resolution
2. Fiscal Year 2020-2021 Approved CIP
Town Staff Recommendation:
Town staff recommends the Town Council approve the reimbursement resolution.
Proposed Motion:
Prosper is a place where everyone matters.
FINANCE
Page 78
Item 4.
Page 2 of 2
I move to approve the resolution expressing official intent to reimburse costs of Town capital
improvement program projects that may be funded with proceeds of bonds or other obligations, if
those costs are paid prior to the issuance of such bonds or other obligations.
Page 79
Item 4.
TOWN OF PROSPER, TEXAS RESOLUTION NO. 2020-
RESOLUTION OF THE TOWN COUNCIL OF THE TOWN OF PROSPER,
TEXAS, EXPRESSING OFFICIAL INTENT TO REIMBURSE COSTS OF TOWN
FISCAL YEAR 2020-2021 CAPITAL IMPROVEMENT PROGRAM PROJECTS;
MAKING FINDINGS; AND PROVIDING AN EFFECTIVE DATE.
WHEREAS, the Town of Prosper, Texas (the "Issuer"), is a duly created governmental
body of the State of Texas; and
WHEREAS, the Issuer expects to pay, or have paid on its behalf, expenditures in
connection with the design, planning, acquisition and construction of portions of its Fiscal Year
2020-2021 capital improvement program projects, including costs associated with the
construction of street improvements, park improvements, public safety facilities, water and
wastewater infrastructure, storm drainage system improvements, and other related infrastructure
improvements (collectively, the "Project") prior to the issuance of tax-exempt obligations, tax-
credit obligations and/or obligations for which a prior expression of intent to finance or refinance
is required by Federal or state law (collectively and individually, the "Obligations") to finance the
Project; and
WHEREAS, the Issuer finds, considers, and declares that the reimbursement for the
payment of such expenditures will be appropriate and consistent with the lawful objectives of the
Issuer and, as such, chooses to declare its intention to reimburse itself for such payments at such
time as it issues Obligations to finance the Project.
THEREFORE, BE IT RESOLVED BY THE TOWN COUNCIL OF THE TOWN OF
PROSPER, TEXAS, THAT:
SECTION 1
All of the above premises are hereby found to be true and correct and are hereby approved
and incorporated into the body of this Resolution as if copied in their entirety.
SECTION 2
The Issuer reasonably expects to incur debt, as one or more series of Obligations, with an
aggregate maximum principal amount equal to $10,000,000 for the purpose of paying the costs
of the Project.
SECTION 3
All costs to be reimbursed pursuant hereto will be capital expenditures. No Obligations
will be issued by the Issuer in furtherance of this Statement after a date which is later than
eighteen (18) months after the later of (1) the date the expenditures are paid, or (2) the date on
which the property, with respect to which such expenditures were made, is placed in service.
SECTION 4
The foregoing notwithstanding, no Obligation will be issued pursuant to this Statement
more than three years after the date any expenditure which is to be reimbursed is paid.
Page 80
Item 4.
Resolution No. 2020- , Page 2
SECTION 5
The foregoing Sections 3 and 4 notwithstanding, all costs to be reimbursed with qualified
tax credit obligations shall not be paid prior to the date hereof and no tax credit obligations shall
be issued after eighteen (18) months of the date the original expenditure is made.
SECTION 6
To evidence the adoption of this Resolution on this, the 13th day of October, 2020, by the
Town Council of the Issuer, the signatures of the Town Secretary and Mayor are set forth below.
DULY PASSED AND APPROVED BY THE TOWN COUNCIL OF THE TOWN OF
PROSPER, TEXAS, THIS 13TH DAY OF OCTOBER, 2020.
_________________________________
Ray Smith, Mayor
ATTEST:
___________________________________
Melissa Lee, Town Secretary
Page 81
Item 4.
TotalIssued Debt Unissued Debt Unissued Debt IssuedPrior Years 2020-2021 2021-2022 2022-2023 2023-2024 2024-2025 2025-2030 CostAuthorized Authorized Unauthorized 2019-2020 2020-2021 2021-2022 2022-2023 2023-2024 2024-2025 2025-2030011836-STDNT Southbound Frontage Road17,000,00017,000,00017,000,000X01021511-STProsper Trail (Kroger - Coit): (Design)305,000305,000305,000A02031511-STProsper Trail (Kroger - Coit): (Construction)4,564,0554,564,0554,465,846A,D,K98,20903041512-STFirst Street (DNT - Coleman): (Design)2,786,5672,786,5672,439,915A,D346,65204051507-STWest Prosper Road Improvements, Segment D: (Construction)3,404,6183,404,6183,404,61805061708-STE-W Collector (Cook Lane - DNT); design done w/ Cook Lane1,455,000 1,455,0001,375,000A80,00006071820-STFirst Street/DNT Intersection Improvements: (Design)137,000137,000137,000D07081820-STFirst Street/DNT Intersection Improvements: (Construction)1,250,000 1,250,0001,250,000A08091823-STVictory Way (Coleman - Frontier) - 2 lanes: (Design)300,000300,000250,000D50,00009101823-STVictory Way (Coleman - Frontier) - 2 lanes: (Construction)2,200,000 2,200,0002,200,00010111709-STProsper Trail (Coit - Custer) - 4 lanes: (Design)810,000 810,000810,000A11122008-STProsper Trail (Coit - Custer) - 2 lanes: (Construction)6,300,000 6,300,0001,250,000D300,0004,750,000 4,750,00012131825-STColeman (Rogers MS - Turn Lane): (Design & Construction)375,000 375,000375,000D13141819-STColeman Street (at Prosper HS): (Design & Construction)790,000 790,000790,000C, K14151923-STFishtrap (Segments 1, 4); (Elem to DNT) schematic: (Design)778,900 778,900778,900D15162009-STFishtrap, Segment 1 (Teel - Middle School): (Construction)1,470,000 1,470,000280,0001,190,000 1,190,00016171932-STCoit Road and US 380 (SB Right Turn Lane): (Design)6,300 6,3006,300A,D17181932-STCoit Road and US 380 (SB Right Turn Lane): (Construction)125,000 125,00035,000A90,00018191830-STProsper Trail/DNT Intersection Improvements: (Design)88,00088,00088,000A,D19201830-STProsper Trail/DNT Intersection Improvements: (Construction)2,000,000 2,000,000400,000 1,600,000 1,600,00020211824-STFishtrap (Teel Intersection Improvements): (Design)150,000 150,000150,000D21221824-STFishtrap (Teel Intersection Improvements): (Construction)1,400,000 1,400,0001,400,00022231708-STCook Lane (First - End): (Design)150,000 150,000150,000A23241708-STCook Lane (First - End): (Construction)3,500,000 3,500,000600,000 2,900,000 2,900,00024252014-STFirst Street (Coit - Custer) - 4 lanes: (Design)1,000,000 1,000,0001,000,000 1,000,00025262010-STFishtrap (Teel - Gee Road): (Design)400,000 400,000400,000C26272011-STGee Road (Fishtrap - Windsong Retail): (Design)250,000 250,000250,000C27282012-STFishtrap (Elem - DNT) - 4 lanes: (Design)900,000 900,000300,000A,D,K600,000 600,00028291710-STCoit Road (First - Frontier) - 4 lanes: (Design)1,289,9001,289,9001,289,900A,X29302013-STTeel (US 380 Intersection Improvements): (Design)100,000 100,000100,000A,K30311307-STFrontier Parkway (BNSF Overpass)3,650,000 29,912,49633,562,49627,812,496A,X05,750,0005,750,00031321805-STFM 2478 (US 380 - FM 1461)391,869 57,000,00057,391,86957,391,869A,K,X32331934-STDNT Overpass at US38080,970,000 9,030,000 90,000,00083,970,000D,J,X6,030,0006,030,00033342017-STFishtrap, Segment 4 (Middle - Elem) - 4 lanes: (Construction)2,750,0002,750,0002,750,0002,750,00034351936-STUS 380 (US 377 - Denton County Line)178,105,000178,105,000178,105,000D,X35361938-STFM 1461 (SH 289 - CR 165)175,000 175,000 175,000 45,190,87045,715,87045,715,870A,X36371933-STFishtrap (Segment 2) - PISD reimbursement1,164,0001,164,0001,164,0001,164,00037381937-STDNT Main Lane (US 380 - FM 428)35,000,000 315,000,000350,000,000350,000,000X38140,297,209 267,942,496 45,369,000 175,000 360,190,870 0 0 813,974,575 776,991,096 9,249,4790 27,734,000 12,040,000 8,500,000 7,194,0000000Design9,451,6670000009,451,667Construction27,914,055 32,662,496 1,164,000000061,740,551Design & Construction102,931,487 235,280,000 44,205,000 175,000 360,190,87000 742,782,357Land/Easements0000000 0Funding SourcesTotal Other Issued Debt Unissued Debt Unissued Debt IssuedPrior Years 2020-2021 2021-2022 2022-2023 2023-2024 2024-2025 2025-2030 Cost Sources Authorized Authorized Unauthorized 2019-2020 2020-2021 2021-2022 2022-2023 2023-2024 2024-2025 2025-2030011929-STBNSF Quiet Zone First/Fifth145,000145,000145,000D01021909-TRTraffic Signal - Coit Rd & First Street: (Construction)306,299306,299306,299A,D02031939-TRTraffic Signal - DNT & Frontier: (Collin County)400,000400,000400,000X03041940-TRTraffic Signal - DNT & Prosper Trail: (Collin County)400,000400,000400,000X04051928-TRTraffic Signal - Fishtrap & Teel Parkway: (Design)34,10034,10034,100A05061928-TRTraffic Signal - Fishtrap & Teel Parkway: (Construction)400,000400,000400,000A06072004-TRTraffic Signal - Fishtrap & Gee Road: (Design)50,00050,00050,000A07082004-TRTraffic Signal - Fishtrap & Gee Road: (Construction)250,000250,000250,000A08092007-TRTraffic Signal - SH 289 & Lovers Lane (TIRZ #1)300,000300,000300,000H09102005-TRTraffic Signal - Coit Rd & Richland: (Design)50,00050,00050,000A10112005-TRTraffic Signal - Coit Rd & Richland: (Construction)410,000410,000410,000A11122101-TRTraffic Signal - Fishtrap & Artesia Boulevard: (Design)50,00050,00050,000A,C12132101-TRTraffic Signal - Fishtrap & Artesia Boulevard: (Construction)425,000425,000425,000A,C`13141935-TRTraffic Signal - FM 1385 & Fishtrap: (TxDOT)250,000250,000250,000X1415Traffic Signal - FM 2478 (Custer Rd) & First Street: (TxDOT) 500,000500,000500,000X1516Traffic Signal - First Street & La Cima: (Design) 50,00050,00050,000A1617Traffic Signal - First Street & La Cima: (Construction) 400,000400,000400,000A1718Traffic Signal - First Street & Coleman: (Design)50,00050,00050,000A1819Traffic Signal - First Street & Coleman: (Construction)425,000425,000425,000A192,745,399 725,000 950,000 475,0000004,895,399 4,895,399 0 0 00000000Design134,100 50,000 50,000 50,000000284,100Construction1,511,299 425,000 400,000 425,0000002,761,299Design & Construction1,100,000 250,000 500,00000001,850,000Land/Easements0000000 0General Fund Projects01Summary of Capital Improvement Program - 09/08 FINAL Subtotal Index
IndexIndex
Funding SourcesOtherSourcesUnissued Debt Schedule Subtotal Traffic ProjectsUnissued Debt ScheduleIndexStreet ProjectsEXHIBIT BPage 82Item 4.
Funding SourcesTotal Other Issued Debt Unissued Debt Unissued Debt IssuedPrior Years 2020-2021 2021-2022 2022-2023 2023-2024 2024-2025 2025-2030 Cost Sources Authorized Authorized Unauthorized 2019-2020 2020-2021 2021-2022 2022-2023 2023-2024 2024-2025 2025-2030Neighborhood Park01 Town Hall Open Space Park: (Design) 55,00055,00055,000D0102 Tanners Mill Park: (Construction) 468,000468,000468,000C0203 Star Trail Park #2 (7.5 Acres / No Lights): (Construction) 535,000535,000535,000C0304 Windsong Ranch Park #2 (7.5 Acres / No Lights): (Design) 30,00030,00030,000C0405 Windsong Ranch Park #2 (7.5 Acres / No Lights): (Construction) 230,000 230,000230,000C0506 Lakewood Preserve (22 Acres / Lights): Construction) 423,000 544,500 967,500967,500C06071802-PK Hays Park (2 Acres / No Lights): (Design ) 85,00085,00085,000G07081802-PK Hays Park (2 Acres / No Lights): (Construction) 375,000375,000375,000G0809 Pecan Grove Phase 2 (21.5 Acres / No Lights) (basketball, pavilion, parking, security lighting): (Design) 67,50067,500500G67,0000910 Pecan Grove Phase 2 (21.5 Acres / No Lights) (basketball, pavilion, parking, security lighting): (Construction) 575,000575,000575,000G1011 Prairie Park (6.7 Acres / No Lights) 300,000300,000600,000600,000C11Trails121801-PKWhitley Place H&B Trail Extension: (Design)70,00070,00070,000G12131910-PKHike and Bike Master Plan: (Design)68,00068,00068,000D1314Star Trail H&B Trail Phases 1, 2, 3, and 4: (Construction)200,000200,000200,000C14151926-PKWhitley Place H&B Trail (OH Easement): (Design)10,00010,00010,00015161926-PKWhitley Place H&B Trail (OH Easement): (Construction)270,000270,000270,00016171801-PKWhitley Place H&B Trail Extension: (Construction)680,000680,000500,000G180,0001718Windsong H&B Trail Ph 3C,5,6A, 6B, 7, 8, and 9: (Design)40,00040,00040,000C1819Windsong H&B Trail Ph 3C,5,6A, 6B, 7, 8, and 9: (Construction)1,351,572 435,000 495,0002,281,5722,281,572C19Community Park20Frontier Park Storage: (Design & Construction) 147,927147,927147,927D20Medians211723-PKState Highway 289 Gateway Monument474,752474,752474,752D21221818-PKAdditional Turf Irrigation SH 28980,00080,00080,000D22231813-PKSH 289/US 380 Green Ribbon Landscape Irrigation809,250809,250809,250B,D23242018-PKColeman Street Median Landscaping (Talon - Victory): (Design)30,00030,00030,000A24252018-PKColeman Street Median Landscaping (Talon - Victory): (Construction) 320,000320,000320,000A25261922-PKDowntown Monument (Broadway/Preston): (Design)16,000 75,00091,00091,000D26271922-PKDowntown Monument (Broadway/Preston): (Construction)380,000380,000380,000D,K276,461,001 2,684,500 795,00000009,940,501 9,413,501 527,000 0 00000000Design401,500 145,00000000546,500Construction5,911,574 2,539,500 795,00000009,246,074Design & Construction147,927000000147,927Land/Easements0000000 0Funding SourcesTotal Other Issued Debt Unissued Debt Unissued Debt IssuedPrior Years 2020-2021 2021-2022 2022-2023 2023-2024 2024-2025 2025-2030 Cost Sources Authorized Authorized Unauthorized 2019-2020 2020-2021 2021-2022 2022-2023 2023-2024 2024-2025 2025-2030011713-FCPolice Station and Dispatch - Professional Services1,644,6961,644,69631,293D1,613,40301021904-FCPolice Station and Dispatch - Development Costs550,000550,000550,00002031905-FCPolice Station and Dispatch - Construction12,645,80412,645,8041,435,000D11,210,80403041906-FCPolice Station and Dispatch - Furniture, Fixtures, and Equipment 1,165,0001,165,0001,165,000D04052102-FCWestside Radio Tower for Communications500,000500,000500,000500,0000516,005,500 500,0000000016,505,500 2,631,293 13,374,2070 500,0000 500,00000000Design2,194,6960000002,194,696Construction13,810,80400000013,810,804Design & Construction0 500,00000000500,000Land/Easements0000000 0165,509,109 271,851,996 47,114,000 650,000 360,190,87000 845,315,975 793,931,289#REF!23,150,6860 28,234,000 12,040,000 9,000,000 7,194,0000000Design12,181,963 195,000 50,000 50,00000012,476,963Construction49,147,732 35,626,996 2,359,000 425,00000087,558,728Design & Construction104,179,414 236,030,000 44,705,000 175,000 360,190,87000 745,280,284Land/Easements0000000 0##A Impact FeesD General FundG Park Development FundK Escrows##B Grant and Interlocal FundsE Water / Wastewater FundH TIRZ #1X Non-Cash Contributions##C Developer AgreementsF Stormwater Drainage FundJ TIRZ #2Z Other Sources (See Detail)IndexPark ProjectsIndexFacility ProjectsIndex IndexUnissued Debt ScheduleUnissued Debt Schedule02Summary of Capital Improvement Program - 09/08 FINALGeneral Fund Projects Subtotal Grand Total General Fund Description Codes - Other SourcesDesignConstructionDesign & Construction Subtotal EXHIBIT BPage 83Item 4.
Funding SourcesTotal Other Issued Debt Unissued Debt Unissued Debt IssuedPrior Years 2020-2021 2021-2022 2022-2023 2023-2024 2024-2025 2025-2030 Cost Sources Authorized Authorized Unauthorized 2019-2020 2020-2021 2021-2022 2022-2023 2023-2024 2024-2025 2025-2030011902-WACuster Road Meter Station and WL Relocations: (Design)359,225359,225359,225E01021902-WACuster Road Meter Station and WL Relocations: (Land/Easements)53,24453,24453,244E02031902-WACuster Road Meter Station and WL Relocations: (Construction)3,454,3633,454,3633,454,363E03041715-WAFishtrap 2.5 MG Elevated Storage Tank: (Design)325,700325,700325,700A04051715-WAFishtrap 2.5 MG Elevated Storage Tank: (Construction)6,108,0006,108,0003,143,000A2,965,00005061716-WALPP Water Line Phase 1a & 1b: (Design)829,850829,850829,850A06071716-WALPP Water Line Phase 1a & 1b: (Construction)10,658,20010,658,200175,000A10,483,20007081716-WALPP Water Line Phase 1 Easement Costs1,691,5001,691,5000A1,691,50008091501-WALPP Pump Station and LPP WL Phase 2: (Design)1,585,1001,585,100277,081A1,308,01909101501-WALPP Pump Station and LPP WL Phase 2: (Construction)15,200,00015,200,0004,000,000A11,200,0005,600,000 5,600,00010111810-WALPP Water Line Phase 2 Easement Costs1,000,0001,000,0001,000,000A11121708-WAE-W Collector (Cook Lane - DNT) Water Line: (Construction)295,775295,775289,750E6,02512131708-WACook Lane (First - End): (Construction)400,000400,000400,000E1314LPP Future Expansion (2026): (Design)1,400,0001,400,0001,400,0001,400,0001415LPP Future Expansion (2026): (Construction)12,600,00012,600,00012,600,00012,600,00015161930-WA Broadway (Parvin-Craig): (Construction) 150,000150,000150,000E1625,910,957 1,000,000 15,200,00000014,000,000 56,110,957 14,457,213 16,453,744 0 25,200,000 0 0 5,600,000 5,600,000 0 0 14,000,000Design3,099,875000001,400,000 4,499,875Construction21,066,3380 15,200,00000012,600,000 48,866,338Design & Construction0000000 0Land/Easements1,744,744 1,000,000000002,744,744Funding SourcesTotal Other Issued Debt Unissued Debt Unissued Debt IssuedPrior Years 2020-2021 2021-2022 2022-2023 2023-2024 2024-2025 2025-2030 Cost Sources Authorized Authorized Unauthorized 2019-2020 2020-2021 2021-2022 2022-2023 2023-2024 2024-2025 2025-2030011903-WWChurch / Parvin Wastewater Reconstruction: (Construction)100,000100,000100,000E01022103-WWDoe Branch Parallel Interceptor (2021): (Design)500,000500,000500,00002032103-WWDoe Branch Parallel Interceptor (2021): (Construction)4,500,0004,500,0001,000,0003,500,0003,500,0000304Doe Branch, Phase 3 WWTP (2025): (Design)1,450,00001,450,0001,450,000E00405Doe Branch, Phase 3 WWTP (2025): (Construction)13,050,00013,050,00013,050,000 13,050,00005100,000 0 5,000,000 14,500,00000019,600,000 3,050,000 0 0 16,550,000 0 0 3,500,000 13,050,000 0 0 0Design0 0 500,000 1,450,0000001,950,000Construction100,000 0 4,500,000 13,050,00000017,650,000Design & Construction0000000 0Land/Easements0000000 0Funding SourcesTotalOtherIssued Debt Unissued Debt Unissued Debt IssuedPrior Years 2020-2021 2021-2022 2022-2023 2023-2024 2024-2025 2025-2030 CostSourcesAuthorized Authorized Unauthorized 2019-2020 2020-2021 2021-2022 2022-2023 2023-2024 2024-2025 2025-2030011614-DRColeman Street Channel Improvements: (Construction)400,000400,000(0)400,000400,00001021613-DROld Town Drainage - Church & Parvin: (Design)40,00040,00040,000F02031613-DROld Town Drainage - Church & Parvin: (Construction)460,000 215,000675,000460,000215,00003041718-DROld Town Regional Retention - Broadway: (Design)25,00025,00025,000004051718-DROld Town Regional Retention - Broadway: (Construction)616,686616,686616,686215,00005062024-DR Old Town Regional Retention Pond #2 385,000385,000385,000385,00006072003-DRFrontier Park/Preston Lakes Drainage: (Design)100,000100,000100,000F07082003-DRFrontier Park/Preston Lakes Drainage: (Construction)985,000985,000985,000985,000081,241,686 1,000,000 985,00000003,226,686 140,000 1,101,6860 1,985,0000 1,000,000 985,0000000Design165,000000000165,000Construction1,076,686 615,000 985,00000002,676,686Design & Construction0000000 0Land/Easements0 385,00000000385,00027,252,643 2,000,000 21,185,000 14,500,00000 14,000,000 78,937,643 17,647,213 17,555,4300 43,735,0000 1,000,000 10,085,000 18,650,00000 14,000,000Design3,264,8750 500,000 1,450,00000 1,400,000 6,614,875Construction22,243,024 615,000 20,685,000 13,050,00000 12,600,000 69,193,024Design & Construction0000000 0Land/Easements1,744,744 1,385,000000003,129,744##A Impact FeesD General FundG Park Development FundK Escrows##B Grant and Interlocal FundsE Water / Wastewater FundH TIRZ #1X Non-Cash Contributions##C Developer AgreementsF Stormwater Drainage FundJ TIRZ #2Z Other Sources (See Detail)Unissued Debt Schedule Subtotal Subtotal Index
Subtotal Grand Total Enterprise Funds Wastewater ProjectsDrainage ProjectsIndex Unissued Debt ScheduleUnissued Debt ScheduleDesign & ConstructionIndex
Water ProjectsDesignConstructionIndex Index Index Description Codes - Other SourcesSummary of Capital Improvement Program - 09/08 FINAL03Enterprise Fund ProjectsEXHIBIT BPage 84Item 4.
Funding SourcesTotal Other Issued Debt Unissued Debt Unissued Debt IssuedPrior Years 2020-2021 2021-2022 2022-2023 2023-2024 2024-2025 2025-2030 Cost Sources Authorized Authorized Unauthorized 2019-2020 2020-2021 2021-2022 2022-2023 2023-2024 2024-2025 2025-2030165,509,109 271,851,996 47,114,000 650,000 360,190,870 0 0 845,315,975 793,931,289 23,150,6860 28,234,000 12,040,000 9,000,000 7,194,000000027,252,643 2,000,000 21,185,000 14,500,00000 14,000,000 78,937,643 17,647,213 17,555,4300 43,735,0000 1,000,000 10,085,000 18,650,00000 14,000,000192,761,752 273,851,996 68,299,000 15,150,000 360,190,8700 14,000,000 924,253,618 811,578,502 40,706,1160 71,969,000 12,040,000 10,000,000 17,279,000 18,650,00000 14,000,000Design15,446,838 195,000 550,000 1,500,00000 1,400,000 19,091,838Construction71,390,756 36,241,996 23,044,000 13,475,00000 12,600,000 156,751,752Design & Construction104,179,414 236,030,000 44,705,000 175,000 360,190,87000 745,280,284Land/Easements1,744,744 1,385,000000003,129,744 Enterprise Funds Capital Improvement Program Summary General Fund Summary of Capital Improvement Program - 09/08 FINALCapital Improvement Program Summary04 Grand Total Capital Improvement Program EXHIBIT BPage 85Item 4.
Page 1 of 2
Ty
To: Mayor and Town Council
From: Stuart Blasingame, Fire Chief
Through: Harlan Jefferson, Town Manager
Betty Pamplin, Finance Director
Re: Town Council Meeting – October 22, 2019
Agenda Item:
Consider and act upon authorizing the Town Manager to accept a grant award from the Federal
Emergency Management Agency (FEMA) through Texas Department of Emergency Management
(TDEM)
Description of Agenda Item:
TDEM has awarded the Town of Prosper the Emergency Management Performance Grant
(EMPG). The goal of this grant program is to enhance the ability of state, local, tribal, and territorial
governments to prevent, protect against, mitigate, respond to, and recover from potential terrorist
acts and other hazards. The EMPG program’s allowable costs support efforts to build and sustain
core capabilities. The funding is a 50/50 cost share match, which was made in-kind from
emergency preparedness resources purchased with FY19 funds. These items included a
Skywatch tower, cyber security enhancements, training and exercises, and police safety gear.
Budget Impact:
Upon acceptance, the grant reimburses the Town of Prosper $26,717.50 for emergency
preparedness resources and other qualified expenses related to public safety during the
performance period of October 1, 2018 to March 31, 2020. The towns match has already been
acknowledged by the state through the required quarterly financial reports.
Legal Obligations and Review:
This agreement has been previously reviewed and there have been no changes to the term and
conditions.
Attached Documents:
1. EMPG award letter
2. EMPG award terms and conditions
Prosper is a place where everyone matters.
FIRE
DEPARTMENT
Page 86
Item 5.
Page 2 of 2
Town Staff Recommendation:
Town staff recommends Town Council to consider and act upon authorizing the Town Manager to
accept and sign a grant awarded by Federal Emergency Management Agency (FEMA) through
Texas Department of Emergency Management (TDEM) for Emergency Management
Performance Grant (EMPG).
Proposed Motion:
I move to authorize the Town Manager to accept and sign a grant awarded by Federal Emergency
Management Agency (FEMA) through Texas Department of Emergency Management (TDEM) for
Emergency Management Performance Grant (EMPG).
Page 87
Item 5.
2020 EMPG Terms and Conditions Initial Here _______
Terms and Conditions
2020 Emergency Management Performance Grant (EMPG)
Purpose
The FY 2020 priority for this program is to advance “Whole Community” security and emergency
management. Grant funds will be used to support local comprehensive emergency management
programs to encourage improvement of mitigation, preparedness, response, and recovery capabilities
for all hazards. Funding may be used to support activities that contribute to the capability to manage
consequences from acts of terrorism. Funds provided may also be used to accomplish initiatives
described in the Federal Program Guidelines, including local implementation of the National Incident
Management System (NIMS), incorporation of appropriate references to the National Response
Framework (NRF) into local plans, homeland security assessment and strategy integration, and
assessment of local emergency management programs
Grant Conditions
Identify the source of funding under which this award is funded and reference the government code.
The federal grant terms and conditions are located at: https://www.fema.gov/media-library-
data/1581717192496-3736b5626f11012c3750de5efb6a4d37/FY_2020_EMPG_NOFO_FINAL_508SA2.pdf
Grant Acceptance
Notice of Subrecipient Grant Award remains an offer until the signed copy of the Acceptance of
Subrecipient Grant Award is received by the Texas Division of Emergency Management (TDEM) in
accordance with the instructions provided in the transmittal letter.
Task Requirements
The approved FY 2020 Statement of Work and Progress Report template outlines eight tasks that the
grantee must perform during the grant period. The following additional tasks are also required of
Subrecipients:
a. Implement (NIMS) at the local level.
b. Incorporate pertinent information concerning National Response Framework into the
local or inter-jurisdictional emergency management plan and its annexes.
c. Subrecipients must have a tracking system of record to organize and coordinate
resources in response to incidents.
Page 88
Item 5.
2020 EMPG Terms and Conditions Initial Here _______
d. During the performance period of this grant, Subrecipient must maintain an emergency
management, as prescribed by the TDEM. This may be accomplished by jurisdictions
maintaining their own emergency management plan or participating in an inter-
jurisdictional emergency management program that meets the required standards. If
TDEM identifies deficiencies in the Sub-recipient’s plan, Sub-recipient’s will correct
deficiencies within sixty (60) days of receiving notice of such deficiencies from TDEM.
e. Sub-recipient’s must maintain an updated inventory of equipment purchased through
this grant program in accordance 2 C.F.R. 200 Requirements, Reports, Records,
Retention, and Enforcement, Equipment and the Department of Homeland Security
(DHS).
f. The Subrecipient agrees that any equipment purchased with funds through this grant
program shall be prominently marked as follows: “Purchased with funds provided by the
U.S. Department of Homeland Security.” Exceptions to this requirement are limited to
items where placing of the marking is not possible due to the nature of the equipment.
Grant Funding
The amount of this grant may be less than the amount requested in your Application for Federal
Assistance due to limits on federal funding for the EMPG program. However, EMPG grant recipients
should report eligible expenses in quarterly financial reports. Any excess match reported, will be
used for TDEM match purposes and becomes 100% federalized, therefore cannot be used for any
other grant match purposes within your jurisdiction.
Financial and Administrative Requirements
In Accordance with 2 C.F.R. Part 200 Subpart F—Audit Requirements, Subrecipient agrees to comply
with the applicable financial and administrative requirements set forth in the Office of Justice
Programs (OJP) Financial Guide.
a. All emergency management program costs for which the Subrecipient seeks reimbursement must
be eligible in accordance with 2 CFR Part 200 as it applies to awards of Federal financial
assistance to all “non-federal entities”
b. Subrecipient will comply with the organizational audit requirements of super circular 2A
CFR 200 Audits of States, Local Governments, and Non-Profit Organizations.
c. When implementing Federal Emergency Management Agency (FEMA) National
Preparedness Directorate funded activities; the Subrecipient must comply with all
federal civil rights laws, to include Title VI of the Civil Rights Act, as amended. The
Subrecipient is required to take reasonable steps to ensure persons of limited English
proficiency have meaningful access to language assistance services regarding the
development of proposals and budgets and conducting FEMA funded activities.
d. Subrecipient will assist the awarding agency (if necessary) in assuring compliance with
the National Historic Preservation Act of 1966 Section 106 (16 U.S.C. § 470), Ex. Order
11593 (identification and protection of historic properties), the Archeological and
Page 89
Item 5.
2020 EMPG Terms and Conditions Initial Here _______
Historical Preservation Act of 1974 (16 U.S.C. § 469 a-1 et seq.), and the National
Environmental Policy Act of 1969 (42 U.S.C. § 4321). (Federal Assurance).
e. Subrecipient agrees to make no request for reimbursement for goods or services
procured by the Subrecipient either prior to the start of the period of performance stated
in this award document or after the end of the period of performance.
Notwithstanding any other provisions of this document, the parties understand and
agree that the obligations of TDEM under this Agreement are contingent upon the
availability of adequate funds to meet TDEM’s liabilities. TDEM shall not be liable to the
Subrecipient for costs under this agreement that exceed the amount specified in the
Notice of Subrecipient Grant Award.
f. Single Audit Act Requirements: For sub-recipients expending $750,000 or more in
federal annually, the Applicant will cause to be performed the required financials and
compliance audits in accordance with the Single Audit Act Amendments of 1996 and
Title 2 of the Code of Federal Regulations, Part 200, Subpart F Audit Requirements.
Reporting Requirements
Subrecipient agrees to comply with all reporting requirements and shall provide such information as
required by TDEM. Reporting requirements can be found in the 2020 Local Emergency Management
Performance Grant (EMPG) Guide. Sub-recipients may be required to submit additional information
and data requested by TDEM and after the end of the period of performance in order to close out the
grant. A copy of the 2020 Local Emergency Management Performance Grant (EMPG) Guide can
downloaded from the TDEM website at:https://tdem.texas.gov/emergency-management-performance-
grant/. Sub recipient must prepare and submit Semi-Annual Progress Reports to TDEM for the
duration of the grant performance period or until all grant activities are completed and the grant is
formally closed. The first performance-reporting period is October 1 to March 31 (progress report due
April 15) and the second reporting period is April 1 to September 30 (progress report due October
15). Subrecipient may also be required to submit additional information and data as requested by
TDEM.
Review of Work and Expenditures
TDEM may review the work of the Subrecipient with respect to approved program tasks and
expenditures for which reimbursement are requested to ensure the federal awards are used for
authorized purposes in compliance with laws, regulations, and the provisions of this contract or grant
agreement and that performance goals are achieved. These reviews may include, without limitation:
comparing actual Subrecipient activities to those approved in the sub-award application and
subsequent modifications if any; ensuring that grant funds have been expended in accordance with
applicable guidelines; confirming compliance with grant assurances, and verifying information
provided on performance reports and payment requests. All financial expenditures submitted for
match purposes will be verified. Any financial excess match submitted to TDEM for the EMPG
grant program cannot be used to match any other grant funded program and is considered
100% federalized for TDEM excess match purposes
Page 90
Item 5.
2020 EMPG Terms and Conditions Initial Here _______
Lobbying
As required by Section 1352, Title 31 of the U.S. Code, for persons entering into a contract, grant,
loan or cooperative agreement from an agency or requests or receives from an agency a commitment
providing for the United States to insure or guarantee a loan, the Applicant certifies that:
a. No Federal appropriated funds have been paid or will be paid, by or on behalf of the
Subrecipient, to any person for influencing or attempting to influence an officer or
employee of any agency, a Member of Congress, an officer or employee of Congress,
or an employee of a Member of Congress in connection with the making of any Federal
grant, the entering into of any cooperative agreement, and the extension, continuation,
renewal, amendment, or modification of any Federal grant or cooperative agreement;
b. If any funds other than Federal appropriated funds have been paid or will be paid to any
person for influencing or attempting to influence an officer or employee of any agency, a
Member of Congress, an officer or employee of Congress, or an employee of a Member
of Congress in connection with this Federal grant or cooperative agreement, the
undersigned shall complete and submit Standard Form - LLL, "Disclosure of Lobbying
Activities," in accordance with its instructions.
c. The Subrecipient will establish safeguards to prohibit employees from using their
positions for a purpose that constitutes or presents the appearance of personal or
organizational conflict of interest or personal gain.
Debarment, Suspension, and other Responsibility Matters
As required by Executive Order 12549, and 12689 and 2 C.F.R 200.213 and codified in the 2 C.F. R.
Part 180, Debarment and Suspension, the applicant will provide protection against waste, fraud, and
abuse by debarring or suspending those persons deemed irresponsible in their dealings with the
federal government. The applicant certifies that it and its principles, sub grantees, recipients or sub
recipients:
The Subrecipient certifies that it and its principals and vendors:
a) Are not presently debarred, suspended, proposed for debarment, declared ineligible,
sentenced to a denial of Federal benefits by a State or Federal court, or voluntarily
excluded from covered transactions by any Federal department or agency; Subrecipients
can access debarment information by going to www.epls.gov.
Page 91
Item 5.
2020 EMPG Terms and Conditions Initial Here _______
b) Have not, within a three-year period preceding this application, been convicted of or had a
civil judgment rendered against them for commission of fraud or a criminal offense in
connection with obtaining, attempting to obtain, or performing a public (Federal, State, or
local) transaction or contract under a public transaction; violation of Federal or State
antitrust statutes or commission of embezzlement, theft, forgery, bribery, falsification or
destruction of records, making false statements, or receiving stolen property;
c) Are not presently indicted for or otherwise criminally or civilly charged by a governmental
entity (Federal, State, or local) with commission of any of the offenses enumerated in
paragraph (1)(b) of this certification; and
d) Have not, within a three-year period preceding this application, had one or more public
transactions (Federal, State, or local) terminated for cause or default.
e) Where the applicant is unable to certify to any of the statements in this certification, he or
she shall attach an explanation to this application (Federal Certification).
Monitoring
a. Subrecipient will provide TDEM, State Auditor, DHS personnel or their authorized
representative, access to and the right to examine all paper or electronic records related
to financial assistance.
b. Subrecipient agrees to monitor their program to ensure that federal awards are used for
authorized purposes in compliance with laws, regulations, and the provisions of
contracts or grant agreements and that the performance goals are achieved.
TDEM may perform periodic reviews or sampling of Subrecipient performance of eligible
activities and approved projects. These reviews/sampling may include, without
limitation: performance of an on-site audit and compliance monitoring, including
inspection of all grant-related records and items, comparing actual.
Subrecipient activities to those approved in the sub-award application and subsequent
modifications if any, ensuring that advances have been disbursed in accordance with
applicable guidelines, confirming compliance with grant assurances, verifying
information provided in performance reports and reviewing payment requests, needs
and threat assessments and strategies.
c. Subrecipient understands and agrees that it cannot use any federal funds, either directly
or indirectly, in support of the enactment, repeal, modification or adoption of any law,
regulation or policy, at any level of government, without the express prior written
approval of FEMA National Preparedness Directorate.
Page 92
Item 5.
2020 EMPG Terms and Conditions Initial Here _______
d. The Subrecipient official certifies federal funds will be used to supplement existing funds
and will not replace (supplant) funds that have been appropriated for the same purpose.
Subrecipient may be required to supply documentation certifying that a reduction in non-
federal resources occurred for reasons other than the receipt or expected receipt of
federal funds.
e. All financial expenditures and excess match will be verified and validated by TDEM and
will become federalized funds and utilized by the Texas Division of Emergency
Management as match. Once these funds are utilized by the TDEM EMPG grant
program, your agency can no longer utilize them within for any other federal grant
match for the term of the grant performance year.
Reimbursement for Expenses
Reimbursement for expenses incurred during the second and fourth quarter of Fiscal Year 2020
will not be disbursed until TDEM receives the first and second semi-annual EMPG Progress
Reports, which are due on April 15, and October 15, respectively.
1. Choice of Law: This agreement shall be construed and governed by Texas law.
2. Changes to the Law: TDEM is a state agency whose authority and appropriations are subject to
the actions of the Texas Legislature and the United States Congress. If TDEM and/or the subject
matter of this contract become subject to a legislative or regulatory change, revocation of statutory or
regulatory authority, or lack of funds that would render the services and/or goods and/or payment to
be provided under this agreement impossible, unnecessary, void, or substantially amended, TDEM
may terminate this agreement without penalty to, or any liability whatsoever on the part of, TDEM, the
State of Texas, or the United States. This contract does not grant vendor a franchise or any other
vested property right.
3. Written Modification: No modification or amendment to this Agreement shall become valid unless
in writing and signed by both parties.
4. To the extent it applies, Subrecipient shall comply with Texas Government Code, Chapter 783, 1
Texas Administrative Code (TAC) §§ 5.141 et seq., and the Uniform Grant Management Standards,
State Uniform Administrative Requirements for Grants and Cooperative Agreements, Subpart B,
§_14.
5. To the extent it applies, Subrecipient shall comply with the General Appropriations Act, 80th
Legislature, Article IX, Part 17.
6. TDEM may suspend or terminate sub-recipient funding, in whole or in part, or other measures
may be imposed for any of the following reasons: failing to comply with the requirements or statutory
objectives of federal law, failing to make satisfactory progress toward the goals or objectives set forth
in the sub-award application, failing to follow grant agreement requirements or special conditions,
failing to submit required reports, or filing a false certification or other report or documentation.
Satisfactory progress is defined as accomplishing the following during the performance period of the
grant: requesting federal funds for purchases, training, etc. and deciding what purchases will be
made, ordering the equipment, ensuring the equipment is shipped and received, and training is
Page 93
Item 5.
2020 EMPG Terms and Conditions Initial Here _______
accomplished with the equipment (or readied for deployment). All of the aforementioned tasks must
be accomplished in a timely manner. Special Conditions may be imposed on Subrecipient’s use of
grant funds until problems identified during grant monitoring visits conducted by TDEM audit and
compliance personnel are resolved.
Page 94
Item 5.
September 21, 2020
Town of Prosper
P.O. Box 307
Prosper, TX 75078-0307
Re: Grant No: EMT-2020-EP-00004
Dear Town Manager Jefferson:
Congratulations, on behalf of the Texas Division of Emergency Management (TDEM), your application for
financial assistance submitted under the Federal Fiscal Year (FFY) 2020 Emergency Management
Performance Grant (EMPG) has been approved in the amount of $25,595.04. As a condition of this
grant, you are required to contribute a cost match in the amount of $25,595.04.
The period of performance for your FFY 2020 EMPG grant is October 1, 2019- March 31, 2021. This
period of performance reflects a 6- month PROGRAMMATIC EXTENSION ONLY to complete and close
out your FFY 2020 grant year task requirements.
Before you receive any of the federal funds awarded to you, you must establish acceptance of this grant
award. By accepting this award, you are acknowledging and accepting the terms and conditions of your
award, as well as the task requirements outlined in the FY 2020 Local Emergency Management
Performance Grant Guide and due dates outlined in the EMPG Application Timeline located on-line at
https://tdem.texas.gov/emergency-management-performance-grant/ . This grant award must be
signed and dated below by your jurisdiction’s “Authorized Official” indicated on the “Designation of EMPG
Grant Officials” form (TDEM 17B) and returned within 45 days from date received to
TDEM.EMPG@tdem.texas.gov. Failure to return documentation to TDEM within 45 days may result in
reallocation of funds.
The 2020 Terms and Conditions are enclosed for your review. Once reviewed, please initial and submit to
TDEM.EMPG@tdem.texas.gov with this signed EMPG grant award letter.
If you have any questions, please contact the EMPG Unit Chief Lisa Resendez at
Lisa.Resendez@tdem.texas.gov or 512-424-7511/512-574-1473 or your District Coordinator.
Respectfully-
W.Nim Kidd MPA, CPA
Chief-Texas Division of Emergency Management
Vice Chancellor for Disaster and Emergency
Services
Texas A&M University System
Authorized Official Signature: Date:
___________________________________________ __________________
Page 95
Item 5.
Page 96
Item 5.
Page 1 of 2
To: Mayor and Town Council
From: Hulon T. Webb, Jr., Director of Engineering Services
Through: Harlan Jefferson, Town Manager
Rebecca Zook, Executive Director of Development and Infrastructure Services
Re: Town Council Meeting – October 13, 2020
Agenda Item:
Consider and act upon authorizing the Town Manager to execute an Escrow Agreement between
the Prosper Independent School District and the Town of Prosper, Texas, related to the future
construction of improvements on Frontier Parkway and Fishtrap Road.
Description of Agenda Item:
In conjunction with the development of the Prosper Independent School District (PISD) Stadium
and Natatorium, and Stuber Elementary, the PISD was required to provide funds to the Town of
Prosper for construction of future improvements on Frontier Parkway adjacent to the Stadium and
Natatorium and on Fishtrap Road adjacent to Stuber Elementary. These improvements are listed
as follows:
Frontier Parkway: $168,870.00
o Future construction of turn lanes and a median opening to serve the PISD Stadium
and Natatorium. Costs include the future construction of the sidewalk adjacent to
the PISD property. Engineering design fees are also included.
Fishtrap Road: $45,609.60
o Future construction of turn lanes to serve Stuber Elementary. Engineering design
fees are included.
While the Town’s Thoroughfare and Circulation Design Requirements allows for the escrow of the
future improvements prior to the occupancy of its facilities, it does not allow the escrow of these
improvements to be delayed until the construction of the improvements. Staff has discussed this
issue with the PISD and is in support of delaying the receipt of the escrow funds until such time
as these improvements are to be constructed. The proposed agreement to delay the receipt of
escrow funds until the improvements are to be constructed is similar to the Escrow Agreement
between the PISD and the Town related to the future construction of improvements adjacent to
Prosper High School, approved in 2011.
Prosper is a place where everyone matters.
ENGINEERING
SERVICES
Page 97
Item 6.
Page 2 of 2
The attached agreement between the Town of Prosper and the PISD obligates the PISD to deposit
with the Town an estimated $214,479.60 towards the construction of the improvements listed on
the previous page. The agreement states that the PISD shall deposit the Escrow Funds within 15
days after receiving written notice from the Town of the intent to bid out the contract to construct
Frontier Parkway adjacent to the Stadium and Natatorium and/or construct Fishtrap Road adjacent
to Stuber Elementary. In the event there are cost overruns, the Town will work with the PISD on
approval and receipt of the additional payment for the cost overruns. Any remaining escrow funds
left after the Town has accepted the improvements shall be returned to the PISD, along with any
interest that may have accrued.
Legal Obligations and Review:
Terrence Welch of Brown & Hofmeister, L.L.P., has approved the Escrow Agreement as to form
and legality.
Attached Documents:
1. Escrow Agreement
Town Staff Recommendation:
Town staff recommends that the Town Council authorize the Town Manager to execute an Escrow
Agreement between the Prosper Independent School District and the Town of Prosper, Texas,
related to the future construction of improvements on Frontier Parkway and Fishtrap Road.
Proposed Motion:
I move to authorize the Town Manager to execute an Escrow Agreement between the Prosper
Independent School District and the Town of Prosper, Texas, related to the future construction of
improvements on Frontier Parkway and Fishtrap Road.
Page 98
Item 6.
Page 99Item 6.
Page 100Item 6.
Page 101Item 6.
Page 102Item 6.
Page 103Item 6.
Page 104Item 6.
Page 105Item 6.
Page 106Item 6.
Page 107Item 6.
Page 108Item 6.
Page 109Item 6.
Page 110Item 6.
Page 111Item 6.
Page 112Item 6.
Page 1 of 2
To: Mayor and Town Council
From: Alex Glushko, AICP, Planning Manager
Through: Harlan Jefferson, Town Manager
Rebecca Zook, P.E., Executive Director of Development & Infrastructure
Services
Re: Town Council Meeting – October 13, 2020
Agenda Item:
Conduct a Public Hearing and consider and act upon an ordinance rezoning 1.4± acres from
Single Family-15 (SF-15) to Downtown Single Family (DTSF), located on the south side of Third
Street, east of Coleman Street. (Z20-0017).
Description of Agenda Item:
The zoning and land use of the surrounding properties are as follows:
Zoning Current Land Use Future Land
Use Plan
Subject
Property Single Family-15 Single Family Residential Old Town Single
Family
North Downtown Single Family
and Single Family-15 Single Family Residential Old Town Single
Family
East Single Family-15 Single Family Residential Old Town Single
Family
South Single Family-15 Single Family Residential Old Town Single
Family
West Downtown Single Family Single Family Residential Old Town Single
Family
Requested Zoning – The purpose of this request is to rezone the property to the Downtown Single
Family District to allow for development of approximately six (6) single family downtown
residences in the future. The existing house will be demolished. At the time of an application for
“straight” zoning, the applicant is not required to submit an exhibit depicting how the property will
Prosper is a place where everyone matters.
PLANNING
Page 113
Item 7.
Page 2 of 2
be specifically developed or elevations of the proposed building. Prior to development, the
developer will be required to submit a plat for review and approval. The applicant has been
advised of the standards necessary for development.
Future Land Use Plan – The Future Land Use Plan recommends Old Town Single Family. The
proposed zoning request conforms to the Future Land Use Plan.
Legal Obligations and Review:
Notification was provided to neighboring property owners as required by State Law. To date,
Town staff has not received any Public Hearing Notice Reply Forms. Town Attorney, Terrence
Welch of Brown & Hofmeister, L.L.P., has approved the standard ordinance as to form and legality.
Attached Documents:
1. Aerial and Zoning Maps
2. Ordinance
3. Exhibit A
Planning & Zoning Commission Recommendation:
At their September 15, 2020 meeting, the Planning & Zoning Commission recommended the Town
Council approve the request, by a vote of 7-0.
Town Staff Recommendation:
Staff recommends approval of an ordinance rezoning 1.4± acres from Single Family-15 (SF-15)
to Downtown Single Family (DTSF), located on the south side of Third Street, east of Coleman
Street.
Proposed Motion:
I move to approve an ordinance rezoning 1.4± acres from Single Family-15 (SF-15) to Downtown
Single Family (DTSF), located on the south side of Third Street, east of Coleman Street.
SUBJECT PROPERTY
Page 114
Item 7.
FM 1385W UNIVERSITY DR
E FIRST ST
PARVIN RD
E UNIVERSITY DR N CUSTER RDE PROSPER TRL
W FIRST ST
W FRONTIER PKWY E FRONTIER PKWY
PROSPER RD
N PRESTON RDN DALLAS PKWYS PRESTON RDFISHTRAP RD
GEE RDFIRST ST
THIRD ST
BROADWAY ST
SECOND STMAIN STCHURCH STCOLEMAN STFIFTH ST
LANE STPARVIN STMCKINLEY STFIELD STPECAN STCROCKETT STPARVIN STFIFTH ST
FIELD ST0 500250Feet
µ
Z20-0017 - 206 East Third Street
This map is for illustration purposes only.
Page 115
Item 7.
FM 1385W UNIVERSITY DR
E FIRST ST
PARVIN RD
E UNIVERSITY DR N CUSTER RDE PROSPER TRL
W FIRST ST
W FRONTIER PKWY E FRONTIER PKWY
PROSPER RD
N PRESTON RDN DALLAS PKWYS PRESTON RDFISHTRAP RD
GEE RDS-3PD-80
PD-67
PD-84
PD-102
PD-45
PD-67
PD-81
PD-100
PD-78
SF-15
DTC
DTR
SF-15
DTO
M
DTO
SF-15
DTO
DTO
C
DTO
C
DTR
DTR
C
M
C
C
DTO DTO
DTSF
DTO
C
R
DTO
DTR
DTO
DTO
DTO
DTO
DTO
DTO DTSF
DTSF
DTO DTO
C
DTO
DTR
DTR DTO
DTO
DTO
DTO
DTSF
DTO
DTODTR
DTSF
SF-15
DTO
DTO
FIRST ST
THIRD ST
BROADWAY ST
SECOND STMAIN STCHURCH STCOLEMAN STFIFTH ST
LANE STPARVIN STMCKINLEY STFIELD STPECAN STCROCKETT STPARVIN STFIFTH ST
FIELD ST0 500250Feet
µ
Z20-0017 - 206 East Third Street
This map is for illustration purposes only.
Page 116
Item 7.
TOWN OF PROSPER, TEXAS ORDINANCE NO. 2020-___
AN ORDINANCE OF THE TOWN OF PROSPER, TEXAS, AMENDING
PROSPER’S ZONING ORDINANCE BY REZONING A TRACT OF LAND
CONSISTING OF 1.405 ACRES, SITUATED IN THE BRYANS 1ST ADDITION,
COLLIN COUNTY SCHOOL LAND, ABSTRACT NO. 147, IN THE TOWN OF
PROSPER, COLLIN COUNTY, TEXAS FROM SINGLE FAMILY-15 (SF-15) TO
DOWNTOWN SINGLE FAMILY (DTSF); DESCRIBING THE TRACT TO BE
REZONED; PROVIDING FOR A PENALTY FOR THE VIOLATION OF THIS
ORDINANCE; PROVIDING FOR REPEALING, SAVING AND SEVERABILITY
CLAUSES; PROVIDING FOR AN EFFECTIVE DATE OF THIS ORDINANCE;
AND PROVIDING FOR THE PUBLICATION OF THE CAPTION HEREOF.
WHEREAS, the Town Council of the Town of Prosper, Texas (the “Town Council”) has
investigated and determined that the Zoning Ordinance should be amended; and
WHEREAS, the Town of Prosper, Texas (“Prosper”) has received a request (Z20-0017)
from MLD Homes (“Applicant”), to rezone 1.405 acres of land, more or less, in the Bryans 1st
Addition, Collin County School Land Survey, Abstract No. 147, in the Town of Prosper, Collin
County, Texas, from Single Family-15 (SF-15) to Downtown Single Family (DTSF) and being
more particularly described in Exhibit “A,” attached hereto and incorporated herein for all
purposes; and
WHEREAS, the Town Council has investigated and determined that the facts contained
in the request are true and correct; and
WHEREAS, all legal notices required for rezoning have been given in the manner and
form set forth by law, Public Hearings have been held, and all other requirements of notice and
completion of such procedures have been fulfilled; and
WHEREAS, the Town Council has further investigated into and determined that it will be
advantageous and beneficial to Prosper and its inhabitants to rezone this property as set forth
below.
NOW, THEREFORE, BE IT ORDAINED BY THE TOWN COUNCIL OF THE TOWN OF
PROSPER, TEXAS:
SECTION 1
Findings Incorporated. The findings set forth above are incorporated into the body of this
Ordinance as if fully set forth herein.
SECTION 2
Amendment to the Town’s Zoning Ordinance. The Town’s Zoning Ordinance, adopted
by Ordinance No. 05-20 is amended as follows: The zoning designation of the below described
property containing 1.405 acres of land, more or less, in the Bryans 1st Addition, Collin County
School Land Survey, Abstract No. 147, in the Town of Prosper, Collin County, Texas, (the
“Property”) and all streets, roads, and alleyways contiguous and/or adjacent thereto is hereby
zoned as Downtown Single Family (DTSF) and being more particularly described in Exhibit “A,”
attached hereto and incorporated herein for all purposes as if set forth verbatim.
Page 117
Item 7.
Ordinance No. 2020-__, Page 2
All development plans, standards, and uses for the Property shall comply fully with the
requirements of all ordinances, rules, and regulations of the Town of Prosper, as they currently
exist or may be amended.
Two (2) original, official, and identical copies of the zoning exhibit map are hereby
adopted and shall be filed and maintained as follows:
a. One (1) copy shall be filed with the Town Secretary and retained as an original
record and shall not be changed in any manner.
b. One (1) copy shall be filed with the Building Official and shall be maintained up-to-
date by posting thereon all changes and subsequent amendments for observation,
issuing building permits, certificates of compliance and occupancy, and enforcing the
zoning ordinance. Reproduction for information purposes may from time-to-time be
made of the official zoning district map.
SECTION 3
No Vested Interest/Repeal. No developer or property owner shall acquire any vested
interest in this Ordinance or in any other specific regulations contained herein. Any portion of
this Ordinance may be repealed by the Town Council in the manner provided for by law.
SECTION 4
Unlawful Use of Premises. It shall be unlawful for any person, firm or corporation to
make use of said premises in some manner other than as authorized by this Ordinance, and
shall be unlawful for any person, firm or corporation to construct on said premises any building
that is not in conformity with the permissible uses under this Zoning Ordinance.
SECTION 5
Penalty. Any person, firm, corporation or business entity violating this Ordinance or any
provision of Prosper’s Zoning Ordinance No. 05-20, or as amended, shall be deemed guilty of a
misdemeanor, and upon conviction thereof shall be fined any sum not exceeding Two Thousand
Dollars ($2,000.00). Each continuing day’s violation under this Ordinance shall constitute a
separate offense. The penal provisions imposed under this Ordinance shall not preclude
Prosper from filing suit to enjoin the violation. Prosper retains all legal rights and remedies
available to it pursuant to local, state and federal law.
SECTION 6
Severability. Should any section, subsection, sentence, clause or phrase of this
Ordinance be declared unconstitutional or invalid by a court of competent jurisdiction, it is
expressly provided that any and all remaining portions of this Ordinance shall remain in full force
and effect. Prosper hereby declares that it would have passed this Ordinance, and each
section, subsection, clause or phrase thereof irrespective of the fact that any one or more
sections, subsections, sentences, clauses and phrases be declared unconstitutional or invalid.
Page 118
Item 7.
Ordinance No. 2020-__, Page 3
SECTION 7
Savings/Repealing Clause. Prosper’s Zoning Ordinance No. 05-20 shall remain in full
force and effect, save and except as amended by this or any other Ordinance. All provisions of
any ordinance in conflict with this Ordinance are hereby repealed to the extent they are in
conflict; but such repeal shall not abate any pending prosecution for violation of the repealed
ordinance, nor shall the appeal prevent a prosecution from being commenced for any violation if
occurring prior to the repealing of the ordinance. Any remaining portions of said ordinances
shall remain in full force and effect.
SECTION 8
Effective Date. This Ordinance shall become effective from and after its adoption and
publications as required by law.
DULY PASSED, APPROVED, AND ADOPTED BY THE TOWN COUNCIL OF THE
TOWN OF PROSPER, TEXAS, ON THIS 13th DAY OF OCTOBER, 2020.
______________________________
Ray Smith, Mayor
ATTEST:
_________________________________
Robyn Battle, Town Secretary
APPROVED AS TO FORM AND LEGALITY:
_________________________________
Terrence S. Welch, Town Attorney
Page 119
Item 7.
LEGENDEXISTINGPROPOSEDPROPERTY LINEPAVEMENTCONTOURWATER LINEEXHIBIT "A"
664-02\dwg\ZONING EXHIBIT.dwgEX-ADesigned by:SHEET1" = 30'
JJV
Checked by:
Scale:
Drawn by:
vasquez engineering, L.L.C.
1919 S. Shiloh Road
Suite 440, LB 44
Garland, Texas 75042
Ph: 972-278-2948
TX Registration # F-12266
THIS DOCUMENT IS FOR
INTERIM REVIEW AND IS
NOT INTENDED FOR
CONSTRUCTION, PERMITTING
OR BIDDING PURPOSES
JUAN J. VASQUEZ, P.E.
TEXAS NO. 85852
DATED 09/28/2020
VASQUEZ ENGINEERING, L.L.C.
TX REG. F-12266
DRS
JJV
09/28/2020Date:
LOTS 1-6, BLOCK 14
BRYANS 1ST ADDITION
TOWN OF PROSPER, TEXAS LOCATION MAPDEVELOPER:
MLD HOMES
31 STEEL RD
WYLIE, TX. 75098-7048 PROJECTLOCATIONZONING LEGALPage 120Item 7.
Page 1 of 2
To: Mayor and Town Council
From: Alex Glushko, AICP, Planning Manager
Through: Harlan Jefferson, Town Manager
Rebecca Zook, P.E., Executive Director of Development & Infrastructure
Services
Re: Town Council Meeting – October 13, 2020
Agenda Item:
Consider and act upon authorizing the Town Manager to execute an Interlocal Agreement for
Geographic Information System (GIS) services between the Town of Prosper and the City of
Frisco.
Description of Agenda Item:
Since 2003, the Town of Prosper has contracted with the City of Frisco for the provision of GIS
services to the Town. The current Interlocal Agreement (ILA) with Frisco expired on September
30, 2020.
During discussions leading into the FY2020-21 budget process, the Town was informed by Frisco
that the cost of GIS services was proposing to increase from $80,000 to $240,000, annually. As
a result, the Town evaluated options for GIS services during FY2020-21 and in the future. Upon
a determination of the most appropriate course of action, in conjunction with the FY2020-21
budget process, staff proposed hiring in-house GIS staff as a solution. To assist with the transition
from contract to in-house GIS operations, an ILA with Frisco was included to ensure a seamless
transition to in-house staff.
The attached ILA with Frisco is to provide transitional GIS services through May 31, 2021 for a
cost of $80,000. In the event the transition is incomplete by that date, the ILA allows Prosper to
request additional services at a rate of $20,000 per month until September 30, 2021. A Statement
of Work is attached to the ILA.
Local governments are authorized by the Interlocal Cooperation Act, V.T.C.A. Government Code,
Chapter 791, to enter into joint contracts and agreements for the performance of governmental
functions and services, including administrative functions normally associated with the operation
of government.
Frisco is tentatively scheduled to consider this ILA at their Regular City Council meeting on
October 20, 2020.
Prosper is a place where everyone matters.
PLANNING
Page 121
Item 8.
Page 2 of 2
Budget Impact:
Approval of this agreement obligates the Town to pay Frisco $80,000 divided into eight (8) equal
monthly payments for the provision of transitional GIS services. This amount was approved by
Council with adoption of the FY 2020-2021 budget in 100-5410-40-03 for Professional Services.
Legal Obligations and Review:
The ILA was prepared by the City of Frisco; Terrence Welch of Brown & Hofmeister, L.L.P., has
approved the ILA as to form and legality.
Attached Documents:
1. Interlocal Agreement
Town Staff Recommendation:
Town staff recommends that the Town Council authorize the Town Manager to execute an
Interlocal Agreement for GIS services between the Town of Prosper and the City of Frisco.
Proposed Motion:
I move to authorize the Town Manager to execute an Interlocal Agreement for Geographic
Information System (GIS) Services between the Town of Prosper and the City of Frisco.
Page 122
Item 8.
Page 1
INTERLOCAL AGREEMENT BY AND BETWEEN THE CITY OF FRISCO, TEXAS
AND THE TOWN OF PROSPER, TEXAS
(Geographic Information Systems Services)
THIS AGREEMENT (the “Agreement”), made and entered into this _____ day of October,
2020, by and between the CITY OF FRISCO, TEXAS (“Frisco”), a municipal corporation, and
the TOWN OF PROSPER, TEXAS (“Prosper”), a municipal corporation.
WHEREAS, Frisco has investigated and determined that it would be advantageous and
beneficial to Frisco and its citizens to provide Geographic Information System (“GIS”) services
and process training to Prosper; and
WHEREAS, Frisco has investigated and determined that it would be advantageous and
beneficial to Frisco and its citizens to provide process training for a Prosper-employed FTE
dedicated to GIS (“Prosper FTE”), including training regarding GIS services historically provided
by Frisco to Prosper; and
WHEREAS, Frisco and Prosper have determined that it would be advantageous and
beneficial to transition full-time GIS responsibilities to Prosper prior to May 31, 2021 and Frisco
will assist in the interviewing and process training of Prosper GIS staff; and
WHEREAS, Prosper has investigated and determined that it would be beneficial to Prosper
and its citizens to retain Frisco for the purpose of providing GIS services and process training for
the Prosper FTE; and
WHEREAS, Prosper has investigated and determined that GIS services and process
training will be used to develop and maintain a database and materials that will be beneficial in
attracting future economic development to Prosper; and
WHEREAS, Prosper has investigated and determined that Frisco has adequate personnel
and equipment to provide the necessary GIS services and process training; and
WHEREAS, Prosper has investigated and determined that obtaining GIS services and
process training from Frisco, as set forth below, will be the most efficient use of funds for GIS
services; and
WHEREAS, the Interlocal Cooperation Act, Chapter 791 of the Texas Government Code
(the “Act”), provides the authority to political subdivisions for contracts by and between each other
to facilitate the governmental functions and services of said political subdivisions under the terms
of the Act.
NOW, THEREFORE, in consideration of the covenants and conditions contained in this
Agreement, Frisco and Prosper agree as follows:
1. Obligations of Prosper.
A. Prosper will provide to Frisco the materials included in the Statement of Work, attached
hereto as Exhibit “A” and incorporated herein for all purposes, in accordance with the
project schedule included in Exhibit “A”.
Page 123
Item 8.
Page 2
B. Prosper will hire a suitable FTE at or before the effective date of this Agreement. Prosper
will adhere to the agreed upon Gantt chart (Exhibit B) indicating target training/transition
target dates or earlier.
2. Obligations of Frisco.
A. Frisco will provide the GIS services and process training to the designated Prosper FTE
outlined in Exhibit “A” in accordance with the project schedule included in Exhibit “B”.
B. The electronic data created by Frisco as outlined in Exhibit “A” and Exhibit “B” will be
the property of Prosper and Frisco and shall be provided to Prosper periodically upon
written request and/or upon termination of this Agreement.
3. Compensation. Prosper shall pay to Frisco $80,000.00 as compensation for the GIS services
and process training. The compensation shall be divided into eight (8) equal installments,
payable on a monthly basis. In the event the training/transition is not complete by May 31,
2021, Prosper may make a written request for Frisco to continue to provide services to Prosper
at a rate of $20,000 per month until September 30, 2021.
4. Term/Termination. The term of this Agreement shall commence on the date established
above and shall continue in effect until May 31, 2021, or as otherwise agreed by the parties in
writing. The transition of GIS from Frisco to Prosper, including all work and process training
provided by Frisco, is to be completed by May 31, 2021.
5. Notice. Any notice required or permitted to be delivered hereunder shall be deemed to be
delivered, whether or not actually received, when deposited in the United States Mail, postage
pre-paid, certified mail, return receipt requested, addressed to either party, as the case may be,
at the addresses contained below:
City: City of Frisco
Attn: City Manager
6101 Frisco Square Blvd
Frisco, Texas 75034
Town: Town of Prosper
Attn: Town Manager
P.O. Box 307
Prosper, TX 75078
6. Miscellaneous.
A. Assignment. This Agreement is not assignable without the prior written consent of the
Parties.
B. Entire Agreement. This Agreement contains the entire agreement of the parties with
respect to the matters contained herein and may not be modified or terminated except upon
the provisions hereof or by the mutual written agreement of the parties hereto.
Page 124
Item 8.
Page 3
C. Venue. This Agreement shall be construed in accordance with the laws of the State of
Texas and shall be performable in Collin County, Texas.
D. Consideration. This Agreement is executed by the parties hereto without coercion or
duress and for substantial consideration, the sufficiency of which is forever confessed.
E. Counterparts. This Agreement may be executed in a number of identical counterparts,
each of which shall be deemed an original for all purposes.
F. Authority to Execute. The individuals executing this Agreement on behalf of the
respective parties below represent to each other and to others that all appropriate and
necessary action has been taken to authorize the individual who is executing this
Agreement to do so for and on behalf of the party for which his or her signature appears,
that there are no other parties or entities required to execute this Agreement in order for the
same to be an authorized and binding agreement on the party for whom the individual is
signing this Agreement and that each individual affixing his or her signature hereto is
authorized to do so, and such authorization is valid and effective on the date hereof.
G. Savings/Severability. In case any one or more of the provisions contained in this
Agreement shall for any reason be held to be invalid, illegal or unenforceable in any
respect, such invalidity, illegality or unenforceability shall not affect any other provision
thereof, and this Agreement shall be construed as if such invalid, illegal or unenforceable
provision had never been contained herein.
H. Representations. Each signatory represents this Agreement has been read by the party for
which this Agreement is executed and that such party has had an opportunity to confer with
its counsel.
I. Miscellaneous Drafting Provisions. This Agreement shall be deemed drafted equally by
all parties hereto. The language of all parts of this Agreement shall be construed as a whole
according to its fair meaning, and any presumption or principle that the language herein is
to be construed against any party shall not apply. Headings in this Agreement are for the
convenience of the parties and are not intended to be used in construing this document.
J. Pursuit of a Governmental Function. Both Frisco and Prosper have determined by their
execution of this Agreement that this Agreement and the obligations of the parties
contained herein are in discharge of a governmental function as set forth in the Interlocal
Cooperation, Chapter 791, Texas Government Code, and the participation by either party
in the terms of this Agreement shall not make such party an agent or representative of the
other party.
K. Sovereign Immunity. The parties agree that neither Frisco nor Prosper has waived its
sovereign immunity by entering into and performing their respective obligations under this
Agreement.
L. Binding Agreement. This Agreement shall be binding upon and shall inure to the benefit
of the parties hereto and their respective successors and assigns. No third party shall have
any rights herein.
Page 125
Item 8.
Page 4
IN WITNESS WHEREOF, the parties have executed this Agreement and caused this
Agreement to be effective on the latest date as reflected by the signatures below.
THE CITY OF FRISCO, TEXAS
By: ________________________
Name: ______________________
Title: _______________________
Date: ___________
THE TOWN OF PROSPER, TEXAS
By: ________________________
Name:______________________
Title: _______________________
Date: ___________
Page 126
Item 8.
Page 5
STATE OF TEXAS §
§
COUNTY OF COLLIN §
BEFORE ME, the undersigned authority, on this day personally appeared
____________________________ known to me to be one of the persons whose names are
subscribed to the foregoing instrument; he/she acknowledged to me he/she is the duly authorized
representative for the TOWN OF PROSPER, TEXAS, and he/she executed said instrument for
the purposes and consideration therein expressed.
GIVEN UNDER MY HAND AND SEAL OF OFFICE this ____ day of __________,
2020.
_______________________________________
Notary Public in and for the State of Texas
My Commission Expires:
_______________________________________
STATE OF TEXAS §
§
COUNTY OF COLLIN §
BEFORE ME, the undersigned authority, on this day personally appeared
_________________________, known to me to be one of the persons whose names are subscribed
to the foregoing instrument; he/she acknowledged to me he/she is the duly authorized
representative for the CITY OF FRISCO, TEXAS, and he/she executed said instrument for the
purposes and consideration therein expressed.
GIVEN UNDER MY HAND AND SEAL OF OFFICE this ____day of ___________,
2020.
_______________________________________
Notary Public in and for the State of Texas
My Commission Expires:
_______________________________________
Page 127
Item 8.
Page 6
EXHIBIT A
Statement of Work
GIS Services for Town of Prosper
City of Frisco, GIS
FY21
Introduction
This Statement of Work sets forth requirements of the City of Frisco (Frisco) to provide GIS Services and Training to
the Town of Prosper (Prosper) for the transition of GIS to Prosper, implementation of work, including the maintenance
of GIS Layers, maintenance of Web-based Applications, and third-party cooperatives.
Contacts
In support of GIS Services to be performed:
Frisco shall designate the GIS Manager as the sole point of contact for all requests. The
GIS Manager will assign tasks to Frisco staff accordingly.
Prosper shall designate [employee] as the sole point of contact for all requests.
[Employee] and GIS Manager will work in conjunction with appropriate staff and act as liaisons for their
respective entities.
When appropriate, [employee] and/or GIS Manager will hand off communication to internal staff for
continued correspondence.
Frisco GIS Staff will work with designated Prosper FTE to train and transition GIS duties
Work To Be Performed
Create/Maintain GIS Layers
Prosper has requested the following data layers/groups be created and/or maintained:
1. Abandoned Sanitary Sewer*
2. Abandoned Water*
3. Abstracts†
4. Address Grid†
5. Address Points
6. Annexation
7. Annexation Agreements
8. Bridges*
9. Contours†
10. County Lines†
11. Current Aerials†
12. Current Land Use†
13. Developer Agreements
14. Franchise Electric Providers*†
15. Elevation Models†
16. ETJ
17. FEMA†
18. Fire Map Book Grid†
19. Future Land Use Plan†
20. Franchise Natural Gas Providers*†
21. Hike & Bike Trails
22. Historical Aerials†
23. Hunting Layer
24. Limited Purpose Annexations
25. Parcel
26. Parks
27. Ponds & Lakes
28. Pre-Construction Parcels*
29. Pre-Construction Roads*
30. Public Facilities
31. Roads
32. Sanitary Sewer*
33. School Districts†
34. Schools
35. Sex Offender Free Zones
36. Special Districts
37. Storm*
38. Streams†
39. Subdivision
40. Thoroughfare Plan†
41. Town Limits
42. Warning Sirens
43. Wastewater CIP†
44. Water CIP†
45. Water*
46. Wet/Dry Alcohol Sales
47. Zip Codes
48. Zoning
*Denotes sensitive layer that will not be available for public viewing
Page 128
Item 8.
Page 7
†Denotes sourced data not maintained by Frisco
Training To Be Conducted
Train and Transition the following items related to the attached Gantt chart
1. Assisting with the hiring process for the dedicated Prosper FTE
2. Assisting with the design and 3rd-party integration during the transition
3. Providing a historical overview of the Prosper GIS environment
4. Review Prosper GIS database
5. Review services used by Prosper
a. Map services
b. GeoCoding service(s)
c. GeoProcessing service(s)
d. Print service(s)
6. Describing all data integrations
7. GPS data collection, processing, and post-processing
8. Data conversion process
a. Public utilities
i. Water system
ii. Reclaimed water system
iii. Wastewater system
iv. Storm drainage system
b. Land development
i. Parcels
ii. Subdivisions
iii. Zoning
iv. Annexations
c. Street centerlines
d. NextGen 9-1-1
9. Fire Map Book
10. FEMA quarterly update
11. US Census update
12. Standard Maps
13. Hunting Area update
14. Sex Offender update
15. Network Analyst Fire District update
In order to maintain the layers, Prosper will provide Frisco with:
1. Approved Final Plats, Re-plats, Conveyance Plats, Amending Plats and Site Plans in both PDF and AutoCAD formats;
2. PDF and AutoCAD (verified to be inclusive of all relevant data) construction documents and as built drawings in accordance
with the guidelines set within the “Non-governmental Cooperatives” section of this document;
3. Zoning and Specific Use Permit legal description boundaries and/or adopted ordinances, with an average of three (3) per month;
and
4. Annexation legal description boundaries and/or adopted ordinances, with an average of two (2) per month.
Create Standard Maps
Frisco will create and deliver pdf files of the following maps one time during FY21. Any additional deliveries will come fro m the
Prosper FTE:
Map Size (in) Scale
Page 129
Item 8.
Aerial 30 x 78 1 in = 750 ft
Aerial Prosper ISD 42 x 84 1 in = 750 ft
Annexation* 16.5 x 39 1 in = 1500 ft
Annexation* 30 x 78 1 in = 750 ft
Hunting 16.5 x 39 1 in = 1500 ft
Sex Offender 16.5 x 39 1 in = 1500 ft
Streets and Subdivisions 25 x 55.5 1 in = 1000 ft
Streets with Grid and Hydrants 42 x 92 1 in = 600 ft
Streets with Grid and No Hydrants 42 x 92 1 in = 600 ft
Thoroughfare Plan* 16.5 x 39 1 in = 1500 ft
Wet/Dry* 16.5 x 39 1 in = 1500 ft
Zoning 16.5 x 39 1 in = 1500 ft
Zoning 24 x 58 1 in = 1000 ft
Zoning 30 x 78 1 in = 750 ft
Fire Map Book 8 x 11 1 in = 500 ft
* Maps whose creation could be transitioned to Prosper, which if executed Frisco would provide up to 4-hours of support
and training at no additional cost.
Maintain Web-based Applications
Frisco will maintain two (2) online mapping applications; one (1) for internal/staff access and use only, which will contain the noted
sensitive layers, and one (1) for external/public access and use, which will not contain the noted sensitive layers. The a verage
maintenance shall not exceed 10-hours per month.
Prosper may provide Frisco up to eight (8) layers (maximum of one per month) to be uploaded to the interactive maps, provided the
layers (including schema, required fields, field aliases, and symbology) are created an d maintained by Prosper.
Inter-agency Cooperatives
Frisco will work with the following governmental agencies on Prosper’s behalf to fulfill GIS data requests: Collin County, De nton
County, Collin Central Appraisal District (CCAD), Denton Central Appraisal District (DCAD), the US Census Bureau, and the North
Central Texas Council of Governments (NCTCOG).
Non-governmental Cooperatives
Frisco will work with the following entities supporting Prosper’s GIS efforts: NewEdge Services and Esri. No other entitie s or
integrations will be taken on as part of this Statement of Work.
Frisco will provide data exports of all requested GIS layers on a monthly basis for use by Town Staff and New Edge Services f or
Cityworks integration.
Frisco will use the existing processes and schema to continue providing monthly tax roll information to Central Square for TRAKiT
consumption through May 31st, 2021 at which time Prosper will need a process in place for business continuity.
Page 130
Item 8.
Frisco will engage RAMTeCH Corporation for a continuation of the current data conversion contract. Prosper will provide Frisco as
built drawings, in both PDF and AutoCAD formats (verified to include all relevant data), along with any GPS data collected, t o be
converted by RAMTeCH or Frisco GIS staff within two-weeks of receipt by Prosper; with RAMTeCH conversion costs not to exceed
5,600 through May 31st, 2021. There shall be an annual maximum of sixteen (16) project as built drawings provided from Prosper to
Frisco for data conversion by RAMTeCH or Frisco GIS staff, delivered to Frisco at a rate of no more than four per month, which does
not include redundant deliveries for project as built drawings with missing and/or inaccurate information. Any project rejec ted more
than once for missing and/or inaccurate information shall be counted as an additional project for the purposes of the submittal tally.
In Support of Data Conversion
Prosper will:
Work with developers to ensure accurate and complete submittals
Provide Frisco with as built construction plans within two-weeks of receipt by Prosper
Frisco will:
Receive and process as built documents from Prosper
Populate Prosper’s GIS geodatabase with the newest available data
Frisco will not:
Engage in conversations with developers or architectural and engineering firms on Prosper’s behalf
Page 131
Item 8.
Exhibit B
(Transition Timeline)
TASK ASSIGNED TO PROGRESS START END
RO
M
MIN
RO
M
MAX
SIGN
-OFF
COF
SIGN
-OFF
TOP
Draft Job Description AG, JJ 31-Aug-
20
27-Sep-
20 4 8
Post Job Description AG 28-Sep-
20
4-Oct-
20 0 1
Hiring Process
Review Resumes AG, JJ 5-Oct-
20
25-Oct-
20 8 16
Complete First Interviews AG, JJ 26-Oct-
20
15-Nov-
20 8 16
Complete Second Interviews AG, JJ 16-Nov-
20
29-Nov-
20 4 8
Onboard - Prosper AG 30-Nov-
20
27-Dec-
20 0 1
Onboard - Frisco GIS
Installation of Esri Products MA 28-Dec-
20
3-Jan-
21 1 2
High Level review of GIS Environment JJ, MA, CS,
BV, TC 4-Jan-
21
17-Jan-
21 20 40
ArcGIS Online MA, TC 18-Jan-
21
24-Jan-
21 2 4
Review Layers MA 25-Jan-
21
31-Jan-
21 2 4
Explanation of Integrations MA, TC 1-Feb-
21
7-Feb-
21 2 4
Initiate Training Program
Data Collection
GPS Field Work & Post-Processing BV 23-Jan-
21
19-Mar-
21 12 24
Data Conversion BV 30-Jan-
21
19-Mar-
21 12 24
Quality Control BV 30-Jan-
21
19-Mar-
21 6 12
Public Utilities
Water BV 30-Jan-
21
26-Feb-
21 4 12
Wastewater BV 6-Feb-
21
5-Mar-
21 8 16
Storm BV 13-Feb-
21
12-Mar-
21 4 8
Reclaimed BV 30-Jan-
21
26-Feb-
21 2 4
Zoning MA 1-Mar-
21
4-Mar-
21 6 12
Annexation MA 1-Mar-
21
4-Mar-
21 2 4
US Census BAS Update, Annually MA 1-Mar-
21
4-Mar-
21 2 4
Standard Map Documents Explained MA 4-Mar-
21
7-Mar-
21 4 8
FEMA, Quarterly Update (Models) CS 8-Mar-
21
8-Mar-
21 2 4
Missing Tax Roll Parcels (Models) CS 8-Mar-
21
10-Mar-
21 6 12
Page 132
Item 8.
Address Points CS 11-Mar-
21
11-Mar-
21 1 2
Parcels
Pre-Construction CS 15-Mar-
21
25-Mar-
21 4 8
Non-Pre-Construction CS 15-Mar-
21
25-Mar-
21 4 8
Subdivisions CS 15-Mar-
21
25-Mar-
21 2 4
Roads CS, BM 26-Mar-
21
1-Apr-
21 4 8
Fire Map Book BM 2-Apr-
21
11-Apr-
21 2 4
Sex Offender Map BM 2-Apr-
21
11-Apr-
21 2 4
Hunting Areas BM 2-Apr-
21
11-Apr-
21 2 4
NextGen 9-1-1 BM 12-Apr-
21
19-Apr-
21 4 8
Network Analyst/Proposed Fire Dist BM 12-Apr-
21
19-Apr-
21 4 8
Agency Cooperatives MA 1-Mar-
21
7-Mar-
21 1 4
New Edge Data Migration
Planning AG, NE, TC, JJ 5-Oct-
20
1-Nov-
20 20 60
Service Reconstruction TC, NE 2-Nov-
20
22-Nov-
20 8 16
Implementing TC, NE 23-Nov-
20
20-Dec-
20 2 4
Testing MA, CS, BV 21-Dec-
20
17-Jan-
21 12 24
Going Live TC, NE 18-Jan-
21
31-Jan-
21 2 4
195 418
Page 133
Item 8.
Page 1 of 2
To: Mayor and Town Council
From: Alex Glushko, AICP, Planning Manager
Through: Harlan Jefferson, Town Manager
Rebecca Zook, P.E., Executive Director of Development & Infrastructure
Services
Re: Town Council Meeting – October 13, 2020
Agenda Item:
Consider and act upon a Site Plan, Landscape Plan, and Façade Plan for an auto parts retail store
(AutoZone), on 1.0± acre, located on the east side of Preston Road, north of Prosper Trail. The
property is zoned Planned Development-68 (PD-68). (D20-0028).
Description of Agenda Item:
In December 2019, Planned Development-68 (PD-68) for the Shops at Prosper Trail was
amended to modify the layout of Lots 6-8 and to allow for flat roof architecture for AutoZone on
Lot 7. In conjunction with the rezoning request, building elevations for AutoZone were included
with PD-68, and a Development Agreement related to building materials and design. The building
elevations in PD-68 and the Development Agreement depict the front of the proposed AutoZone
building facing westward, toward Preston Road. With this request the applicant is proposing to
reorient the building such that the rear of the building faces Preston Road. The applicant has
indicated the developer has requested to orient the AutoZone building eastward toward the interior
of the development in order to be consistent with the proposed orientation of the adjacent Ebby
Halliday building to the north. They have also included a line-of-sight exhibit depicting the look of
the rear of the building from Preston Road. Staff believes the landscaping and berms along
Preston Road provide adequate screening of the rear elevation of the building.
PD-68 requires Planning & Zoning Commission and Town Council approval of the Site Plan,
Landscape Plan, and Façade Plan for this property. The Zoning Ordinance allows for the
proposed modification to the building orientation in conjunction with Site Plan and Façade Plan
approval. However, the Development Agreement with MQ Prosper Retail is required to be
amended to allow for the modification of the building orientation. An amendment to the
Development Agreement is also on the October 13, 2020, agenda for Town Council consideration.
The Site Plan shows the proposed 6,925 square-foot AutoZone building, the Landscape Plan
show the proposed landscaping, and the Façade Plan shows the flat roof architecture. Access is
provided from Preston Road through the development. The depicted number of off-street parking
spaces meets the minimum standards of the Zoning Ordinance. The Site Plan, Landscape Plan,
and Façade Plan conform to the PD-68 development standards.
Prosper is a place where everyone matters.
PLANNING
Page 134
Item 9.
Page 2 of 2
Attached Documents:
1. Aerial Location Map
2. Site Plan
3. Landscape Plan
4. Façade Plan
5. Line of Sight Exhibit
Planning & Zoning Commission Recommendation:
At their September 15, 2020 meeting, the Planning & Zoning Commission recommended the Town
Council approve the request, by a vote of 7-0, subject to the following:
1. Town Council approval of the Site Plan, Landscape Plan, and Façade Plan.
2. Town Council approval of an amendment to the Development Agreement with MQ Prosper
Retail regarding building reorientation.
Staff Recommendation:
Staff recommends approval of the request subject to:
1. Town Council approval of an amendment to the Development Agreement with MQ Prosper
Retail regarding building reorientation.
Proposed Motion:
I move to approve the Site Plan, Landscape Plan, and Façade Elevations for an auto parts retailer
(AutoZone), on 1.0± acre, located on the east side of Preston Road, north of Prosper Trail, subject
to:
1. Approval of an amendment to the Development Agreement with MQ Prosper Retail regarding
building reorientation.
Page 135
Item 9.
FM 1385W UNIVERSITY DR
E FIRST ST
PARVIN RD
E UNIVERSITY DR N CUSTER RDE PROSPER TRL
W FIRST ST
W FRONTIER PKWY E FRONTIER PKWY
PROSPER RD
N PRESTON RDN DALLAS PKWYS PRESTON RDFISHTRAP RD
GEE RDPROSPER TRL PRESTON RDCIRCLE J TRL
CLIPSTON DRWATERTON DR
PACKSADDLE TRL
VISTA RUN DRDOUBLE B TRL
ST PETER LN
OLYMPIA LNLAKEFRONT DRCOPPER PTSADDLE CREEK DRCONCHO TRLSHASTA LNSHADYBANK CT
LAUREL VISTA CT
SHAVANO WAY
NEWPARK WAYBLACKPOOL LNPARADA PLST CLAIRE CT
ST PETER LN
PRESTON RD0 500250Feet
µ
D20-0028 - Autozone in Shops at Prosper Trail
This map is for illustration purposes only.
Page 136
Item 9.
47962ARCHITECT:DRAFTSMAN:CHECKED BY:7.6.5.4.3.2.1.SCALE:REVISIONSPROTOTYPE SIZEDATE123 S. FRONT STREET, 3rd FLOOR
MEMPHIS, TENNESSEE 38103
CONTACT:
PHONE: 901-495-8994
PREPARED FOR:AutoZoneSTORE DEVELOPMENT
Store No.:
OWNER:
AutoZone, Inc.1718 Dry Creek Way, Suite 110 San Antonio, Texas 78259Tel: 210.265.8300 Fax: 210.855.5530www.westwoodps.comTBPE Firm No. F-11756 TBPLS Firm No. F-10194064a division ofWestwood08-10-2020OVERALL SITE PLAN1.02(NOT TO SCALE)VICINITY MAPPROSPER TRAILSITEHWY 289 (PRESTON ROAD)1Page 137Item 9.
Page 138Item 9.
LEFT SIDE WALL
RIGHT SIDE WALL
(LOW SIDE)
REAR WALL
21'-0"21'- 0"21'- 0"+15'-10"
ROOF LINE
+17'-10"
ROOF LINE
+15'-10"
ROOF LINE
+15'-10"
ROOF LINE
+17'-10"
ROOF LINE +15'-10"
ROOF LINE
AUTOZONE STORE NO. 6029
NORTH PRESTON RD.
PROSPER TX 75078
FACADE PLAN PREPARATION DATE: 7-7-20 REV 9-2-20
THE SHOPS AT PROSPER TRAIL, COLLIN COUNTY, TX
LOT 7, BLOCK A
TOWN PROJECT NUMBER:
1/8"=1'-0"
SCALE:
NORTH
WEST
SOUTH
ARCHITECT:APPLICANT:
GEORGE CALLOW
123 SOUTH FRONT STREET
MEMPHIS, TN 38103
901-495-8705
CAROLYN THAEMERT
123 SOUTH FRONT STREET
MEMPHIS, TN 38103
901-495-8994
LANDLORD:
MQ PROSPER RETAIL, LLC C/O DON
SILVERMAN, MANAGER
4622 MAPLE AVENUE, SUITE 200
DALLAS, TX 75219
214-393-3983
AUTOZONE, INC.
72'-0"
·THIS FACADE PLAN IS FOR CONCEPTUAL PURPOSES ONLY. ALL BUILDING PLANS
REQUIRE REVIEW AND APPROVAL FROM THE BUILDING INSPECTIONS DIVISION.
·ALL MECHANICAL EQUIPMENT SHALL BE SCREENED FROM PUBLIC VIEW. ROOFTOP
MOUNTED EQUIPMENT SHALL BE SCREENED BY PARAPET WALL OR SCREENING WALL.
SCREENING WALLS SHALL BE THE SPECIFICATIONS OF THE ZONING ORDINANCE.
·WHEN PERMITTED, EXPOSED UTILITY BOXES AND CONDUITS SHALL BE PAINTED TO
MATCH THE BUILDING.
·ALL SIGNAGE AREAS AND LOCATIONS ARE SUBJECT TO APPROVAL BY THE BUILDING
INSPECTIONS DIVISION.
·WINDOWS SHALL HAVE A MAXIMUM EXTERIOR VISIBLE REFLECTIVITY OF TEN 10 PERCENT.
·ANY DEVIATION FROM THE APPROVED FACADE PLAN WILL REQUIRE RE-APPROVAL BY
THE TOWN OF PROSPER.
DUMPSTER ENCLOSURE 6'-0"2112 GROSS SQ.FT.
120 WINDOWS/DOOR SQ.FT.
127 TRIM
161 WINDOWS/DOORS SQ.FT.
1610 GROSS SQ.FT.
97 TRIM
1992 NET SQ.FT.
6%
1449 NET SQ.FT.
6%2'-6"11'-0"
126 WINDOWS SQ.FT.
1610 GROSS SQ.FT.
48 TRIM
1484 NET SQ.FT.
3%
177 Split Face CMU
327 STONE
12%
22%
932 Thin Brick 63%
234 Split Face CMU
451 STONE
12%
22%
1180 Thin Brick 60%
151 Split Face CMU
323 STONE
11%
23%
850 Thin Brick 60%
+17'-10"
(HIGH SIDE)
FRONT WALL
ROOF LINE
LINE OF FINISHED
FLOOR21'-0"+17'-10"
ROOF LINE 34'-9"21'-0"EAST
2112 GROSS SQ.FT.
518 WINDOWS/DOORS SQ.FT.
219 Split Face CMU
715 STONE
65 TRIM
1594 NET SQ.FT.
14%
44%
5%
595 Thin Brick 37%
6
FOAM CORNICE PAINT: RELIABLE WHITE
GLASS AND ALUMINUM DOORS - CLEAR BRONZE FINISH
PIPE GUARD WITH BEIGE SLEEVE
WALL MOUNTED LIGHT FIXTURE BRONZE
TOILET WALL VENTS PAINT TO MATCH WALL BEHIND
19
ALUMINUM STOREFRONT - BRONZE FINISH
DO NOT PAINT OVERHEAD DOOR PAINT ANGLES BRONZE
PAINT MAN DOOR TO MATCH WALL & METAL FRAMES BRONZE
THIN BRICK COLOR: OLDCASTLE TIMBERLAND WITH RED FLASH
TWO PIECE COMPRESSION TRIM COLOR: BLACK
17
16
11
12
8
15
14
4
13
3
2
1
SCUPPERS AND DOWNSPOUTS. BRONZE
7
10
18
5
9
STORE ADDRESS - 6" WHITE REFLECTIVE NUMBERS
8" SPLIT FACE CMU BLOCK INTEGRAL COLOR:
THOMAS TAN NO. 1103
1
1
1
5
5
5
2
2
2
3
3
7
8
8
8
12
1315
17
16
18
18
18
19
19
19
20 CLEARESTORY WINDOW - EVERGREEN GLASS
21 FAUX WINDOW - OPAQUE BLACK GLASS
21
21
21
22 STANDING SEAM METAL ROOF - BLACK
23 CANOPY - BLACK
22
22
22
23
METALGATE
THIN BRICK AND SPLIT FACE
CMU BASE TO MATCH BUILDING
6
NOT USED
NOT USED
NOT USED
NOT USED
3'-4" PILASTER WITH ENVIORNMENTAL STONEWORKS
AUTUMN/BUCKEYE
ENVIORNMENTAL STONEWORKS AUTUMN/BUCKEYE
21 21
5
12
3
4
8
9 10 14 182
20
21 21
20
22 23
19
Page 139
Item 9.
Page 140Item 9.
Page 1 of 3
To: Mayor and Town Council
From: Alex Glushko, AICP, Planning Manager
Through: Harlan Jefferson, Town Manager
Rebecca Zook, P.E., Executive Director of Development & Infrastructure
Services
Re: Town Council Meeting – October 13, 2020
Agenda Item:
Consider and act upon authorizing the Town Manager to execute a First Amended Development
Agreement between MQ Prosper Retail LLC and the Town of Prosper, Texas, related to the Shops
at Prosper Trail retail development.
Description of Agenda Item:
In December 2019, Planned Development-68 (PD-68) for the Shops at Prosper Trail was
amended to modify the layout of Lots 6-8 and to allow for flat roof architecture for AutoZone on
Lot 7. Approval of the rezoning request was subject to approval of a Development Agreement
related to exterior building materials and architectural design. A Development Agreement was
prepared accordingly and approved by the Town Council.
The approved Development Agreement depicted the front of the proposed AutoZone building
facing westward, toward Preston Road. However, when the Site Plan application was received
by the Town, it depicted the building facing eastward, toward the interior of the development rather
than Preston Road. While the Zoning Ordinance allows the Site Plan to be approved with a
reorientation of the building, the Development Agreement is required to be amended. With this
request the applicant is proposing to amend the Development Agreement to allow for the
reorientation of the AutoZone to face eastward. The applicant has included a line-of-sight exhibit
depicting the look of the rear of the building from Preston Road.
Legal Obligations and Review:
Town Attorney, Terrence Welch of Brown & Hofmeister, L.L.P., has reviewed the agreement as to
form and legality.
Attached Documents:
1. Development Agreement First Amendment
2. Exhibits A and B
3. Line of Sight Exhibit
Prosper is a place where everyone matters.
PLANNING
Page 141
Item 10.
Page 2 of 3
Town Staff Recommendation:
Staff recommends the Town Council authorize the Town Manager to execute an amendment to
the Development Agreement between MQ Prosper Retail LLC and the Town of Prosper, Texas,
related to the Shops at Prosper Trail retail development.
Page 142
Item 10.
Page 3 of 3
Proposed Motion:
I move to authorize the Town Manager to execute an amendment to the Development Agreement
between MQ Prosper Retail LLC and the Town of Prosper, Texas, related to the Shops at Prosper
Trail retail development.
Page 143
Item 10.
1
FIRST AMENDMENT TO DEVELOPMENT AGREEMENT
THIS FIRST AMENDMENT TO DEVELOPMENT AGREEMENT (“First Amendment to
Development Agreement”) is entered into by and between the Town of Prosper, Texas (“Town”),
and MQ Prosper Retail LLC (“Owner”) (individually, a “Party” and collectively, the “Parties”) to be
effective (the “Effective Date”) on the latest date executed by a Party.
WHEREAS, the Town is a home-rule municipal corporation, located in Collin County and
Denton County, Texas, organized and existing under the laws of the State of Texas; and
WHEREAS, Owner is a Texas limited liability company qualified to do business in the State
of Texas; and
WHEREAS, Owner has developed the Shops at Prosper Trail located in Collin County in
the Town, and more particularly described in Exhibit A, attached hereto and incorporated by
reference (the “Property”); and
WHEREAS, in 2014 the Town approved Planned Development 68 (“PD-68”) relative to the
development of the Property as a retail shopping center and has approved certain amendments
to PD-40 subsequent thereto; and
WHEREAS, on or about December 10, 2019, the Town approved certain amendments to
PD-68, as more fully described in the applicable zoning ordinance, and further, the Parties agreed
to certain other matters, including architectural features and building materials to be utilized for
structures on the Property; and
WHEREAS, the foregoing was memorialized in a Development Agreement (“Development
Agreement”) approved by the Town Council on or about December 10, 2019, and subsequently
filed in the Collin County Real Property records on or about December 16, 2019, as Document #
20191216001599640; and
WHEREAS, on or about October 13, 2020, the Town Council considered and approved a
Site Plan and Façade Elevations, and authorized the execution of this First Amendment to
Development Agreement on or about October 13, 2020; and
WHEREAS, this First Amendment to Development Agreement seeks to incorporate, in
part, the negotiated and agreed upon development standards contained in PD-68, as amended,
and to recognize Owner’s reasonable investment-backed expectations in PD-68, as amended;
and
WHEREAS, subject to the terms of this First Amendment to Development Agreement,
Owner agrees and acknowledges that it will construct on the Property structures in accordance
with the provisions, standards and notes reflected in the Development Agreement executed on or
about December 10, 2019, as amended by this First Amendment to Development Agreement.
NOW, THEREFORE, in consideration of the foregoing premises, and for other good and
valuable consideration the receipt and adequacy of which are hereby acknowledged, the Parties
to this Agreement agree as follows:
1. Architectural Standards and Building Materials. For any structure built on the
Property following the Effective Date, it shall comply with the applicable requirements contained
Page 144
Item 10.
2
in Exhibit B, “Architectural Standards and Building Materials,” attached hereto and incorporated
by reference, and Owner agrees to construct those structures in compliance therewith. The
Parties agree and acknowledge that the provisions of this Paragraph shall apply to any structure
constructed subsequent to the execution of this Agreement. Nothing in this Agreement shall be
deemed to modify or otherwise amend any zoning regulation duly adopted by the Town, previously
or in the future.
2. Effect of Development Agreement. Except to the extent referenced in Exhibit B,
attached hereto and incorporated by reference, all other terms and conditions contained in the
Development Agreement executed on or about December 10, 2019, shall remain in full force and
effect.
IN WITNESS WHEREOF, the parties hereto have caused this document to be executed
as of the date referenced herein.
TOWN:
THE TOWN OF PROSPER, TEXAS
By: ___________________________
Name: Harlan Jefferson
Title: Town Manager, Town of Prosper
STATE OF TEXAS )
)
COUNTY OF COLLIN )
This instrument was acknowledged before me on the ___ day of _______________, 2020,
by Harlan Jefferson, Town Manager of the Town of Prosper, Texas, on behalf of the Town of
Prosper, Texas.
______________________________
Notary Public, State of Texas
My Commission Expires: _________________
Page 145
Item 10.
3
OWNER:
MQ Prosper Retail LLC,
a Texas limited liability company
By: ________________________________
Name: Donald L. Silverman
Title: Manager
STATE OF TEXAS )
)
COUNTY OF COLLIN )
This instrument was acknowledged before me on the ___ day of _______________, 2020,
by Donald L. Silverman, in his capacity as Manager of MQ Prosper Retail LLC, a Texas limited
liability company, known to be the person whose name is subscribed to the foregoing instrument,
and that he executed the same on behalf of and as the act of Owner.
______________________________
Notary Public, State of Texas
My Commission Expires: _________________
Page 146
Item 10.
4
EXHIBIT A
(Property Description)
Page 147
Item 10.
5
EXHIBIT B
ARCHITECTURAL STANDARDS AND BUILDING MATERIALS
Page 148
Item 10.
Page 149Item 10.
LEFT SIDE WALL
RIGHT SIDE WALL
(LOW SIDE)
REAR WALL
21'-0"21'- 0"21'- 0"+15'-10"
ROOF LINE
+17'-10"
ROOF LINE
+15'-10"
ROOF LINE
+15'-10"
ROOF LINE
+17'-10"
ROOF LINE +15'-10"
ROOF LINE
AUTOZONE STORE NO. 6029
NORTH PRESTON RD.
PROSPER TX 75078
FACADE PLAN PREPARATION DATE: 7-7-20 REV 9-2-20
THE SHOPS AT PROSPER TRAIL, COLLIN COUNTY, TX
LOT 7, BLOCK A
TOWN PROJECT NUMBER:
1/8"=1'-0"
SCALE:
NORTH
WEST
SOUTH
ARCHITECT:APPLICANT:
GEORGE CALLOW
123 SOUTH FRONT STREET
MEMPHIS, TN 38103
901-495-8705
CAROLYN THAEMERT
123 SOUTH FRONT STREET
MEMPHIS, TN 38103
901-495-8994
LANDLORD:
MQ PROSPER RETAIL, LLC C/O DON
SILVERMAN, MANAGER
4622 MAPLE AVENUE, SUITE 200
DALLAS, TX 75219
214-393-3983
AUTOZONE, INC.
72'-0"
·THIS FACADE PLAN IS FOR CONCEPTUAL PURPOSES ONLY. ALL BUILDING PLANS
REQUIRE REVIEW AND APPROVAL FROM THE BUILDING INSPECTIONS DIVISION.
·ALL MECHANICAL EQUIPMENT SHALL BE SCREENED FROM PUBLIC VIEW. ROOFTOP
MOUNTED EQUIPMENT SHALL BE SCREENED BY PARAPET WALL OR SCREENING WALL.
SCREENING WALLS SHALL BE THE SPECIFICATIONS OF THE ZONING ORDINANCE.
·WHEN PERMITTED, EXPOSED UTILITY BOXES AND CONDUITS SHALL BE PAINTED TO
MATCH THE BUILDING.
·ALL SIGNAGE AREAS AND LOCATIONS ARE SUBJECT TO APPROVAL BY THE BUILDING
INSPECTIONS DIVISION.
·WINDOWS SHALL HAVE A MAXIMUM EXTERIOR VISIBLE REFLECTIVITY OF TEN 10 PERCENT.
·ANY DEVIATION FROM THE APPROVED FACADE PLAN WILL REQUIRE RE-APPROVAL BY
THE TOWN OF PROSPER.
DUMPSTER ENCLOSURE 6'-0"2112 GROSS SQ.FT.
120 WINDOWS/DOOR SQ.FT.
127 TRIM
161 WINDOWS/DOORS SQ.FT.
1610 GROSS SQ.FT.
97 TRIM
1992 NET SQ.FT.
6%
1449 NET SQ.FT.
6%2'-6"11'-0"
126 WINDOWS SQ.FT.
1610 GROSS SQ.FT.
48 TRIM
1484 NET SQ.FT.
3%
177 Split Face CMU
327 STONE
12%
22%
932 Thin Brick 63%
234 Split Face CMU
451 STONE
12%
22%
1180 Thin Brick 60%
151 Split Face CMU
323 STONE
11%
23%
850 Thin Brick 60%
+17'-10"
(HIGH SIDE)
FRONT WALL
ROOF LINE
LINE OF FINISHED
FLOOR21'-0"+17'-10"
ROOF LINE 34'-9"21'-0"EAST
2112 GROSS SQ.FT.
518 WINDOWS/DOORS SQ.FT.
219 Split Face CMU
715 STONE
65 TRIM
1594 NET SQ.FT.
14%
44%
5%
595 Thin Brick 37%
6
FOAM CORNICE PAINT: RELIABLE WHITE
GLASS AND ALUMINUM DOORS - CLEAR BRONZE FINISH
PIPE GUARD WITH BEIGE SLEEVE
WALL MOUNTED LIGHT FIXTURE BRONZE
TOILET WALL VENTS PAINT TO MATCH WALL BEHIND
19
ALUMINUM STOREFRONT - BRONZE FINISH
DO NOT PAINT OVERHEAD DOOR PAINT ANGLES BRONZE
PAINT MAN DOOR TO MATCH WALL & METAL FRAMES BRONZE
THIN BRICK COLOR: OLDCASTLE TIMBERLAND WITH RED FLASH
TWO PIECE COMPRESSION TRIM COLOR: BLACK
17
16
11
12
8
15
14
4
13
3
2
1
SCUPPERS AND DOWNSPOUTS. BRONZE
7
10
18
5
9
STORE ADDRESS - 6" WHITE REFLECTIVE NUMBERS
8" SPLIT FACE CMU BLOCK INTEGRAL COLOR:
THOMAS TAN NO. 1103
1
1
1
5
5
5
2
2
2
3
3
7
8
8
8
12
1315
17
16
18
18
18
19
19
19
20 CLEARESTORY WINDOW - EVERGREEN GLASS
21 FAUX WINDOW - OPAQUE BLACK GLASS
21
21
21
22 STANDING SEAM METAL ROOF - BLACK
23 CANOPY - BLACK
22
22
22
23
METALGATE
THIN BRICK AND SPLIT FACE
CMU BASE TO MATCH BUILDING
6
NOT USED
NOT USED
NOT USED
NOT USED
3'-4" PILASTER WITH ENVIORNMENTAL STONEWORKS
AUTUMN/BUCKEYE
ENVIORNMENTAL STONEWORKS AUTUMN/BUCKEYE
21 21
5
12
3
4
8
9 10 14 182
20
21 21
20
22 23
19
EXHIBIT B
Page 150
Item 10.
Page 151Item 10.
Page 1 of 2
To: Mayor and Town Council
From: Alex Glushko, AICP, Planning Manager
Through: Harlan Jefferson, Town Manager
Rebecca Zook, P.E., Executive Director of Development & Infrastructure
Services
Re: Town Council Meeting – October 13, 2020
Agenda Item:
Consider and act upon whether to direct staff to submit a written notice of appeal on behalf of the
Town Council to the Development Services Department, pursuant to Chapter 4, Section 1.5(C)(7)
and 1.6(B)(7) of the Town’s Zoning Ordinance, regarding action taken by the Planning & Zoning
Commission on any Site Plan or Preliminary Site Plan.
Description of Agenda Item:
Attached are the Site Plans that were acted on by the Planning & Zoning Commission at their
October 6, 2020 meeting. Per the Zoning Ordinance, the Town Council has the ability to direct
staff to submit a written notice of appeal on behalf of the Town Council to the Development
Services Department for any Preliminary Site Plan or Site Plan acted on by the Planning & Zoning
Commission.
Regarding the Site Plan for Ford, in August 2019, the Town Council approved a rezoning request
for Ford, generally to:
Allow for an increased property area, with the addition of three (3) acres on the north side of the
property;
Allow for an increased building area and an increased number of parking spaces; and
Allow for the modification of the open space along US 380, including a reduction in the depth of the
open space.
The rezoning was approved subject to berms a minimum of 36 inches in height being provided in
four (4) designated locations along US 380. (The location of the berms is depicted on the
proposed Site Plan.)
In conjunction with rezoning consideration, “water features” were shown on Exhibit G (Conceptual
Landscape Plan) and referred to during Public Hearings as “fountains.” Exhibit D (Conceptual
Prosper is a place where everyone matters.
PLANNING
Page 152
Item 11.
Page 2 of 2
Site Plan) notes that “plaza improvements within City of Irving water transmission pipeline
easement shall be coordinated with and approved by the City of Irving prior to final design.
The proposed Site Plan (and associated Landscape Plans) do not include water features/fountains
as shown on the zoning exhibits. The applicant stated the City of Irving has denied such features
within their easement.
Attached Documents:
1. Site Plan for a Downtown Office (705 First Street)
2. Site Plan for Dunkin’ (Prosper Commons)
3. Site Plan for Ford
4. Site Plan for SHB Offices (Prosper Town Center)
Town Staff Recommendation:
Town staff recommends the Town Council take no action on this item.
Page 153
Item 11.
OU OU OU OU OU OU OU OU OUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUJOB NO.
DRAWN BY:
DESIGNED BY:
CHECKED BY:
DATE:
SHEET:REVISIONSDESCRIPTIONDATENO.5711.001
RW
09-22-20C.SAUNDERSADDITIONLOT1,BLOCK1705E.FIRSTSTREETPROSPERTEXAS75078LEGAL DESCRIPTION
SITE DATA SUMMARY
ZONING DTO
PROPOSED USE: PROF. OFFICE
LOT AREA 21,900 SQ FT
0.5028 ACRES,
BUILDING AREA 2013 SF
BUILDING HEIGHT APPOX. 22'
1 STORY
LOT COVERAGE 11.7%
FLOOR AREA RATIO 0.12:1
PARKING REQUIRED 1:350 SF
PARKING PROVIDED 7
HANDICAPPED PARKING REQUIRED 1
HANDICAPPED PARKING PROVIDED 1
ORIGINAL SQUARE FOOTAGE OF
IMPERVIOUS SURFACE 9,100 SQ FT
INCREASE IN IMPERVIOUS SURFACE 6,547 SQ FT
TOTAL AVAILABLE OPEN SPACE 16,365 SQ FT
(WITHIN LANDSCAPE EASEMENT AND LANDSCAPE SETBACK)
INCREASED IMPERVIOUS AREA OVERALL
(PAVEMENT, SIDEWALK)
5300 SQ FT
REQUIRED OPEN SPACE (7%)1,533 SQ FT
PROVIDED OPEN SPACE 7,879 SQ FT
EXISTING LANDSCAPING TO BE PRESERVED.
REQUIRED LANDSCAPING 14 CALIPER IN (TREES)
NOTES
1. ACCORDING TO MAP NO 48085C0235J, DATED JUNE 2, 2009 OF
THE NATIONAL FLOOD INSURANCE PROGRAM MAP, FLOOD
INSURANCE RATE MAP OF COLLIN COUNTY, TEXAS, FEDERAL
EMERGENCY MANAGEMENT AGENCY, FEDERAL INSURANCE
ADMINISTRATION, THIS PROPERTY IS WITHIN ZONE "X"
(UNSHADED) AND IS NOT WITHIN A SPECIAL FLOOD HAZARD
AREA.
2. THE APPROVAL OF A SITE PLAN SHALL BE EFFECTIVE FOR A
PERIOD OF EIGHTEEN (18) MONTHS FROM THE DATE OF
APPROVAL BY THE PLANNING AND ZONING COMMISSION, AT
THE END OF WHICH TIME THE APPLICANT MUST HAVE
SUBMITTED AND RECEIVED APPROVAL OF ENGINEERING PLANS
AND BUILDING PERMITS. IF THE ENGINEERING PLANS AND
BUILDING PERMITS ARE NOT APPROVED, THE SITE PLAN
APPROVAL, TOGETHER WITH ANY PRELIMINARY SITE PLAN FOR
THE PROPERTY, IS NULL AND VOID.
3. GARBAGE TOTES TO BE STORED IN REAR YARD BEHIND
EXISTING WOOD FENCE.
4. LOT LOCATED IN DOWNTOWN OFFICE DISTRICT. ALL
ADJACENT LOTS OCCUPIED BY SINGLE FAMILY HOUSES OR
SIMILAR OFFICE USES.
5. NO SCREENING WALLS REQUIRED.
6. ONCOR EASEMENT TO THE EAST OF THE SITE.
TOWN OF PROSPER SITE PLAN GENERAL NOTES
1. DUMPSTERS AND TRASH COMPACTORS SHALL BE SCREENED IN
ACCORDANCE WITH THE ZONING ORDINANCE.
2. OPEN STORAGE, WHERE PERMITTED, SHALL BE SCREENED IN
ACCORDANCE WITH THE ZONING ORDINANCE.
3. OUTDOOR LIGHTING SHALL COMPLY WITH THE LIGHTING AND
GLARE STANDARDS CONTAINED WITHIN THE ZONING ORDINANCE
AND SUBDIVISION ORDINANCE.
4. LANDSCAPING SHALL CONFORM TO LANDSCAPE PLANS APPROVED
BY THE TOWN.
5. ALL ELEVATIONS SHALL COMPLY WITH THE STANDARDS CONTAINED
WITHIN THE ZONING ORDINANCE.
6. BUILDINGS OF 5,000 SQUARE FEET OR GREATER SHALL BE 100%
FIRE SPRINKLED. ALTERNATIVE FIRE PROTECTION MEASURES MAY
BE APPROVED BY THE FIRE DEPARTMENT.
7. FIRE LANES SHALL BE DESIGNED AND CONSTRUCTED PER TOWN
STANDARDS OR AS DIRECTED BY THE FIRE DEPARTMENT.
8. TWO POINTS OF ACCESS SHALL BE MAINTAINED FOR THE
PROPERTY AT ALL TIMES.
9. SPEED BUMPS/HUMPS ARE NOT PERMITTED WITHIN A FIRE LANE.
10. HANDICAPPED PARKING AREAS AND BUILDING ACCESSIBILITY
SHALL CONFORM TO THE AMERICANS WITH DISABILITIES ACT (ADA)
AND WITH THE REQUIREMENTS OF THE CURRENT ADOPTED
BUILDING CODE.
11. ALL SIGNAGE IS SUBJECT TO BUILDING OFFICIAL APPROVAL.
12. ALL FENCES AND RETAINING WALLS SHALL BE SHOWN ON THE SITE
PLAN AND ARE SUBJECT TO BUILDING OFFICIAL APPROVAL.
13. ALL EXTERIOR BUILDING MATERIALS ARE SUBJECT TO BUILDING
OFFICIAL APPROVAL AND SHALL CONFORM TO THE APPROVED
FACADE PLAN.
14. SIDEWALKS OF NOT LESS THAN SIX (6') FEET IN WIDTH ALONG
THOROUGHFARES AND COLLECTORS AND FIVE (5') FEET IN WIDTH
ALONG RESIDENTIAL STREETS, AND BARRIER FREE RAMPS AT ALL
CURB CROSSINGS SHALL BE PROVIDED PER TOWN STANDARDS.
15. APPROVAL OF THE SITE PLAN IS NOT FINAL UNTIL ALL ENGINEERING
PLANS ARE APPROVED BY THE ENGINEERING DEPARTMENT.
16. SITE PLAN APPROVAL IS REQUIRED PRIOR TO GRADING RELEASE.
17. ALL NEW ELECTRICAL LINES SHALL BE INSTALLED AND'/OR
RELOCATED UNDERGROUND. NO NEW ELECTRIC LINES ARE
PLANNED TO BE INSTALLED ON THIS PROJECT.
18. ALL MECHANICAL EQUIPMENT SHALL BE SCREENED FROM PUBLIC
VIEW IN ACCORDANCE WITH THE ZONING ORDINANCE. NO NEW
MECHANICAL EQUIPMENT PLANNED.
19. IMPACT FEES WILL BE ASSESSED IN ACCORDANCE WITH THE LAND
USE CLASSIFICATIONS IDENTIFIED ON THE SITE DATA SUMMARY
TABLE; HOWEVER, CHANGES TO THE PROPOSED LAND USE AT THE
TIME CO AN/OR FINISH-OUT PERMIT MAY RESULT IN ADDITIONAL
IMPACT FEES AND/OR PARKING REQUIREMENTS.
20. ALL DIMENSIONS ARE TO FACE OF CURB UNLESS OTHERWISE
NOTED.
E FIRST STLANEAVEE 3RD ST
SCRAIGSTREETE 3RD ST
SITE
SITE LOCATION MAP
NOT TO SCALE
NORTH
0 20 4020
GRAPHIC SCALE IN FEET
HORIZONTAL
C2.0
+/- 92 CALIPER INCHES
Page 154
Item 11.
DUNKIN’SET REVISIONSDATESCALENODESCRIPTIONDATEDRAWNCKDAPPDSHEET REVISIONSCITY PROJECT NO. D20-0075ALSOFN1"=20’----PROSPER COMMONSTOWN OF PROSPER, TEXASBLOCK B, LOTS 5SITE PLANPLANNERSSURVEYORSENGINEERS FAX:(817)335-9955PHONE:(817)335-9900TBPE FIRM # 20COLLEYVILLE, TX.760345000 THOMPSON TERRACEPLANNERSSURVEYORSENGINEERSLS
15
LS
5’ LANDSCAPE SETBACKLS
LS
5’ LANDSCAPE SETBACK
LSLS
8
LS11
FH
EXIST.25’ FRONT BUILDING SETBACK
LS
924’ FIRE LANE’MH
EX
S00 26’ 04"E 263.53’FH
EXIST.
FH
EXIST.
S8933’56"W 184.66’N 00 26’ 04" W 263.53’LS
5’ LANDSCAPE SETBACK24’ FIRE LANE’
INST.NO. 20080516000596170
10’ STREET EASEMENT
S8933’56"W 184.66’
LS
30 LANDSCAPE AND PEDESTRIAN EASEMENT
LS
SEATING
OUTDOOR
200 SQ. FT.
FF EL 755.60
2,000 SQ. FT.
HEIGHT 25’-6"
SPACE (RETAIL)
STORY FUTURE TENANT
PROPOSED ONE
FF EL 755.60
1,700 SQ. FT.
HEIGHT 25’-6"
SPACE (RESTAURANT)
STORY FUTURE TENANT
PROPOSED ONE
SEATING
OUTDOOR
200 SQ. FT.
BOARD
ORDER
FF EL 755.60
1,600 SQ. FT.
HEIGHT 25’-6"
W/ DRIVE THROUGH
STORY RESTAURANT
PROPOSED ONE
WALK-IN COOLER
MURPHY EXPRESS
PANDA EXPRESS
INST. NO. 20060622000859300
20’ WATER EASEMENT
VOL. 313, PG. 321, L.R.C.C.T.
VOL. 313, PG. 318, L.R.C.C.T.l. C. W!LUAMSON SURVEY, ABSTRACT NO. 947
HARRISON JAMISON SURVEY, ABSTRACT NO. 480
BFR
S
MH
TEL
SD
WWW W
TYP.TYP.
TYP.TYP.TYP.TYP.TYP.
9 ’
7 ’ 9’8 ’10’18’24’18’9 ’ 9 ’9 ’2’R 3’
R 5’
R 3’
R 10’
R 5’
R 3’
R 3’
R 10’
R 3’R 3’
R 3’
R 3’
R 3’
R 10’R 5’
R 10’
TYP.
9 ’
CONNECTION
PROP. FDC
MANEUVERING AREA
UNOBSTRUCTED
APPROACH & 35’
50’ UNOBSTRUCTED
MATCH EXISTING
CONC. SIDEWALK
BEGIN PROPOSED
MATCH EXISTING
CONC. SIDEWALK
END PROPOSED
TO MATCH BUILDING
BRICKS & STONE FINISH
ENCLOSURE CMU WALLS W/
PROPOSED DUMPSTER
UTILIZE EXIST. 1 - 1" IRRIGATION METER
" WATER SERVICE METER2
13 - 1
EX. 10’ X 10’ WATER EASEMENT
R 3’
R 3’
R 30’R 30’R 15’R 10’R 10’R
3
0’R 30’R 10’R 20’
R 10’R 10’
R 50’
R 40’R 40’R 20’
R 30’
CONC. SIDEWALK
PROPOSED 6’
OUTSIDE OF VEHICLE OVERHANG
HEADLIGHT SCREENING IS REQUIRED
R 30’
489’ TO COIT ROAD
APPROXIMATELY
320’’ TO ISLAND NOSE
APPROXIMATELY
396’’ TO ISLAND NOSE
APPROXIMATELY
24’13.9’TOWN OF PROSPER SITE PLAN NOTES
1. NO 100 YEAR FLOODPLAIN EXISTS ON THE SITE.
6. NO TREES EXIST ON SITE.
7. DETENTION FOR THIS SITE IS PROVIDED ON BLOCK B, LOT 1.
8. IF OUTSIDE DISPLAY IS NEEDED OR REQUIRED AN SUP IS REQUIRED.
Site Plan
SITE SUMMARY TABLE
GENERAL SITE DATA
ZONING
PROPOSED USE
LOT AREA
TOTAL BUILDING AREA (SQUARE FEET)
LOT COVERAGE
TOTAL LANDSCAPE AREA PROVIDED
FLOOR AREA RATIO
OPEN SPACE REQUIRED
OPEN SPACE PROVIDED
INTERIOR LANDSCAPE REQUIRED
INTERIOR LANDSCAPE PROVIDED
PARKING
REQUIRED PARKING RATIO
REQUIRED PARKING
PROVIDED PARKING
HANDICAP PARKING REQUIRED
HANDICAP PARKING PROVIDED
LOT 5, BLOCK B
1.117 Acres or 48,676 SF
Zoned Commercial COR PD-2
2. ALL DIMENSIONS ARE SHOWN TO FACE OF CURB UNLESS OTHERWISE NOTED
3. FIRE LANES SHALL BE A MINIMUM OF 24’ IN WIDTH WITH A 30’ TURNING RADIUS.
STANDARDS.
4. FDCS SHALL BE PROVIDED IN ACCORDANCE WITH THE TOWN OF PROSPER
WITH TOWN STANDARDS.
5. TREES SHALL NOT BE LOCATED WITHIN PUBLIC EASEMENTS IN ACCORDANCE
VICINITY MAP
NOT TO SCALE
PROSPER, TEXAS
SITE
9. HVAC IS ROOF MOUNTED.
TYPE
DOMESTIC
IRRIGATION
SIZE
1.5"
1"
NO.
3
1
SAN. SEW.
6"
N/A
COMMERCIAL COR PD-2
69.26%
7% (3,407.3 SF)
15 S.F. / 1 PARKING SPACE = 675 S.F.
1,946 S.F.
43 SPACES
2 SPACES
2 SPACES
RETAIL & RESTAURANT W/ DRIVE THRU
(10,324 SF) 21.21 %
WATER METER SCHEDULE
BUILDING HEIGHT (1 STORY)
1 SP./ 200 SF OUTSIDE SEATING
1 SP./ 250 SF RETAIL
1 SP./ 100 SF RESTAURANT &
10.89 %
25’-6" - 1 STORY
GENERAL NOTES
Date Prepared: August 27, 2020
PROSPER COMMONS
BLOCK B, LOT 5 10’10’2’2’10’10’18’1
5
’
13’32’16.7’12’12’25.8’16’
7.33 % (3,567 SF)
PROSPER COMMONS
48,676 SF
5,300 SF
1)DUMPSTERS AND TRASH COMPACTORS SHALL BE SCREENED IN ACCORDANCE WITH THE ZONING ORDINANCE.
2)OPEN STORAGE, WHERE PERMITTED, SHALL BE SCREENED IN ACCORDANCE WITH THE ZONING ORDINANCE.
3)OUTDOOR LIGHTING SHALL COMPLY WITH THE LIGHTING AND GLARE STANDARDS CONTAINED WITHIN THE ZONING ORDINANCE
4)LANDSCAPING SHALL CONFORM TO LANDSCAPE PLANS APPROVED BY THE TOWN.
5)ALL ELEVATIONS SHALL COMPLY WITH THE STANDARDS CONTAINED WITHIN THE ZONING ORDINANCE.
6)BUILDINGS OF 5,000 SQUARE FEET OR GREATER SHALL BE 100% FIRE SPRINKLED. ALTERNATIVE FIRE PROTECTION MEASURES
7)FIRE LANES SHALL BE DESIGNED AND CONSTRUCTED PER TOWN STANDARDS OR AS DIRECTED BY THE FIRE DEPARTMENT.
8)TWO POINTS OF ACCESS SHALL BE MAINTAINED FOR THE PROPERTY AT ALL TIMES.
9)SPEED BUMPS/HUMPS ARE NOT PERMITTED WITHIN A FIRE LANE.
10)HANDICAPPED PARKING AREAS AND BUILDING ACCESSIBILITY SHALL CONFORM TO THE AMERICANS WITH DISABILITIES ACT (ADA)
11)ALL SIGNAGE IS SUBJECT TO BUILDING OFFICIAL APPROVAL.
12)ALL FENCES AND RETAINING WALLS SHALL BE SHOWN ON THE SITE PLAN AND ARE SUBJECT TO BUILDING OFFICIAL APPROVAL.
13)ALL EXTERIOR BUILDING MATERIALS ARE SUBJECT TO BUILDING OFFICIAL APPROVAL AND SHALL CONFORM TO THE APPROVED
14)SIDEWALKS OF NOT LESS THAN SIX (6) FEET IN WIDTH ALONG THOROUGHFARES AND COLLECTORS AND FIVE (5) FEET IN WIDTH
15)APPROVAL OF THE SITE PLAN IS NOT FINAL UNTIL ALL ENGINEERING PLANS ARE APPROVED BY THE ENGINEERING SERVICES
16)SITE PLAN APPROVAL IS REQUIRED PRIOR TO GRADING RELEASE.
17)ALL NEW ELECTRICAL LINES SHALL BE INSTALLED AND/OR RELOCATED UNDERGROUND.
18)ALL MECHANICAL EQUIPMENT SHALL BE SCREENED FROM PUBLIC VIEW IN ACCORDANCE WITH THE ZONING ORDINANCE.
19)ALL LANDSCAPE EASEMENTS MUST BE EXCLUSIVE OF ANY OTHER TYPE OF EASEMENT.
20)IMPACT FEES WILL BE ASSESSED IN ACCORDANCE WITH THE LAND USE CLASSIFICATION(S) IDENTIFIED ON THE SITE DATA
21)THE APPROVAL OF A SITE PLAN SHALL BE EFFECTIVE FOR A PERIOD OF EIGHTEEN (18) MONTHS FROM THE DATE OF APPROVAL
DEPARTMENT.
FA˙ADE PLAN.
AND WITH THE REQUIREMENTS OF THE CURRENT, ADOPTED BUILDING CODE.
ALONG RESIDENTIAL STREETS, AND BARRIER FREE RAMPS AT ALL CURB CROSSINGS SHALL BE PROVIDED PER TOWN STANDARDS.
SUMMARY TABLE; HOWEVER, CHANGES TO THE PROPOSED LAND USE AT THE TIME OF CO AND/OR FINISH-OUT PERMIT MAY
RESULT IN ADDITIONAL IMPACT FEES AND/OR PARKING REQUIREMENTS.
APPROVAL OF ENGINEERING PLANS AND BUILDING PERMITS. IF THE ENGINEERING PLANS AND BUILDING PERMITS ARE NOT
BY THE PLANNING & ZONING COMMISSION, AT THE END OF WHICH TIME THE APPLICANT MUST HAVE SUBMITTED AND RECEIVED
APPROVED, THE SITE PLAN APPROVAL, TOGETHER WITH ANY PRELIMINARY SITE PLAN FOR THE PROPERTY, IS NULL AND VOID.
AND SUBDIVISION ORDINANCE.
MAY BE APPROVED BY THE FIRE DEPARTMENT.
EXIST RETAIL / RESTAURANT
ZONED: COMMERCIAL COR PD-2
P.R.C.C.T.
VOL. 20, PG. 126
PROSPER COMMONS
BLOCK B, LOT 12
EXIST RETAIL / RESTAURANT
ZONED: COMMERCIAL COR PD-2
P.R.C.C.T.
VOL. 20, PG. 126
PROSPER COMMONS
BLOCK B, LOT 11
EXIST GAS STATION
ZONED: COMMERCIAL COR PD-2
P.R.C.C.T.
VOL. 2020, PG. 303
PROSPER COMMONS
BLOCK B, LOT 6
EXIST RESTAURANT
ZONED: COMMERCIAL COR PD-2
P.R.C.C.T.
VOL. 2020, PG. 170
PROSPER COMMONS
BLOCK B, LOT 4
19.1’44.8’53’16’OWNER:
EMAIL: Scottrodgers@duwestrealty.com
PHONE: (214) 366-0009
CONTACT: MR. DAVID S. FOGEL
DALLAS, TX, 75209
4303 W LOVERS LANE
3EIGHTY COIT PARTNERS LP
DEVELOPER
EMAIL: PPATEL@DELRAYDONUTS.COM
PHONE: (561) 789-0736
CONTACT: MR. PARTH PATEL
FRISCO, TX, 75033
7271 SWITCHGRASS ROAD
SHREEJI DONUT REALTY, INC
43 SPACES
CASE # - D20-0075
DUNKIN’13.5’13.5’3’
INLET
EX. SD
INLET
EX. SD
5’ INLET
PROP. SD
INLET
EX. SD
INLET
EX. SD
INLET
EX. SD
7’
5’20.67’152’76’FH
EXIST.
W.E.
10’x10’
12’ ACCESS, FIRE LANE &
DRAINAGE &UTILITY EASEMENT
P.R.C.C.T.
VOL. 2020, PG. 126
O.P.R.C.C.T.
C.C.C.I. NO. 2018-922
26.5’ UTILITY EASEMENT
12’ ACCESS, FIRE LANE &
UTILITY EASEMENT
P.R.C.C.T.
VOL. 2020, PG. 303
O.P.R.C.C.T.
C.C.C.I. NO. 20200513000696000
UTILITY EASEMENT
12’ ACCESS, FIRE LANE &
P.R.C.C.T.
VOL. 2020, PG. 303
10’x10’ W.E.
P.R.C.C.T.
INST. NUM. 2018-922
10’ X 10’ W.E.
P.R.C.C.T.
INST. NUM. 2018-922
10’ X 10’ W.E.
PER THIS PLAT
10’x10’ W.E.
30’ LANDSCAPE & PEDESTRIAN EASEMENT
P.R.C.C.T.
VOL. 2020, PG. 303
INST. NO. 20060622000859300
20’ WATER EASEMENT
INST.NO. 20080516000596170
10’ STREET EASEMENT
30’ LANDSCAPE & PEDESTRIAN EASEMENT
P.R.C.C.T.
VOL. 2020, PG. 170
INST.NO. 20080516000596170
10’ STREET EASEMENT
(UNIVERSITY DRIVE)
U.S. HIGHWAY 380
50’24’24’18’
200100_Site_Layout.dgn 9/10/2020 12:16:37 PM
1 OF 1
Page 155
Item 11.
U.S. HIGHWAY 380(Variable Width Public Right-of-Way)(Variable Width Public Right-of-Way)960 30 0 60 120Page 156Item 11.
113015 0 30 60Page 157Item 11.
U.S. HIGHWAY 380(Variable Width Public Right-of-Way)(Variable Width Public Right-of-Way)1030 15 0 30 60Page 158Item 11.
E FIRST STREET
CONCRETE ROADWAY HAYS ROADCONCRETE ROADWAYTBM #2
PK NAIL
Z=785.24'
S
SR30'R30'R30'R3
0
'R3
0
'R30'24'18'18'20'5.5'20'24'18'5.5'5.5'
18'24'18'
18'24'18'
18'24'18'
18'24'18'
5.5'
18'24'18'
11.65'5.5'
18'9'9'11.65'
5.5'
18'24'18'9'9'9'9'9'9'9'9'9'
9'9'9'
9'9'9'9'9'9'9'9'9'9'9'9'9'9'30'8'
8'
9'9'9'
FF 781.00
FF 785.30
FF 782.25
FF 782.00
FF 782.65
FF 785.00
FF 783.65
FF 784.30
FF 784.30 FF 784.75
FF 789.15
FF 788.75
BUILDING #5
4,752 SF
BUILDING #6
4,752 SF
BUILDING #4
4,752 SF
BUILDING #3
4,752 SF
BUILDING #7
4,752 SF
BUILDING #9
4,752 SF
BUILDING #8
4,752 SF
BUILDING #10
4,752 SF BUILDING #11
4,752 SF
BUILDING #12
4,752 SF
BUILDING #1
4,752 SF
BUILDING #2
4,752 SF
EX MONUMENT SIGN 12'10.82'
30.05' ROW
DEDICATION
15 LANDSCAPE EASMENT
25' LANDSCAPEEASEMENTDOM. METER
IRR. METERR30'R30'R54'
5' LANDSCAPE
SETBACK 5' LANDSCAPESETBACK5.5'
5.5'
R
3
'R30'R
3
0
'R30'6.5'WATER
ESMT
WATER
ESMT
WATER
ESMT
FHYD
FHYD
FHYD
WATER
ESMT
FHYD
WATER
ESMT
FHYD
WATER
ESMT
FHYD
WATER
ESMT
8' HIKE AND
BIKE TRAIL
8' HIKE AND
BIKE TRAIL
PROP RET WALL
MAX HEIGHT 6'
PROP RET WALL
MAX HEIGHT 6'
ADA RAMP
ADA RAMP
ADA RAMP
15' WATER
EASEMENT
EX FHYD
AC UNIT
(TYP)
AC UNIT
(TYP)
AC UNIT
(TYP)
PROP RET WALL
W/ 42" HANDRAIL
PROP RET WALL
W/ 42" HANDRAIL
20' DRAINAGE &GRADING EASEMENT5' DRAIANGE
EASEMENT
5' DRAIANGE
EASEMENT 10'10'16'14'10'10'10'10'10'10'10'10'10'10'6'5.5'7.5'109.61'109.2'11.65'27.89'24.16'
11.58'11.58'27'10'16.89'10'5.5'
10'27'5.5'
7'16.89'10'10.65'19.39'19.31'18.91'20.08'44.94'44.78'33.5'
33.1'
33.02'20'20'19.07'
18.99'
18.58'
18.5'20'10'18.1'
5.5'
7'
5.5'
7'
5.5'10'11.58'11.58'27.89'STREET
ESMT
PED.
ESMT
PEDESTRIAN
ACCESS
EASEMENT
5'99.09'
99.25'
21.98'
97.72'
98.13'
22.49'
22.94'
98.65'
100.39'
100.56'
43.42'
43.59'
60' ROW
98.23'
7'
24'
4'
24'
R
3
0
'
R30'DATENo.REVISIONBYDATE:
SHEET
File No.
09/22/2020
CHECKED:MAM
DRAWN:LRR
DESIGN:LRRPROSPER TOWN CENTERNEC 1ST STREET & S PRESTON ROADPROSPER, TEXAS301 S. COLEMAN, SUITE 40PHONE: 817.281.0572PROSPER, TX 75078 WWW.CLAYMOOREENG.COMTEXAS REGISTRATION #14199
2020-071
PRELIMINARY
CLAYMOORE ENGINEERING
COUNTY SURVEY:ABSTRACT NO.
COLLIN
CITY:STATE:
PROSPER TEXAS
LEGAL DESCRIPTION:
APPLICANT:
CLAYMOORE ENGINEERING, INC.
1903 CENTRAL DRIVE, SUITE #406
BEDFORD, TX 76021
PH: 817.281.0572
SURVEYOR:
EAGLE SURVEYING, LLC
210 SOUTH ELM STREET, SUITE #104
DENTON, TX 76201
PH: 940.222.3009
CONTACT NAME: MATT MOORE
CONTACT NAME: MATTHEW RAABE
LOT 1, BLOCK A PROSPER TOWN CENTER I, L.P.
SHB PROSPER
SITE PLAN
CASE #: D20-0074
DEVELOPER:
SHB DEVELOPMENT
PO BOX 175
SHREVEPORT, LA 71161
PH: 314.423.6111 CONTACT NAME: LINO ANDREANI
COLLIN CO SCHOOL LAND
SURVEY 147
ACCORDING TO MAP NO. 48085C0235J, DATED JUNE 2, 2009 OF THE NATIONAL
FLOOD INSURANCE PROGRAM MAP, FLOOD INSURANCE RATE MAP OF COLLIN
COUNTY, TEXAS, FEDERAL EMERGENCY MANAGEMENT AGENCY, FEDERAL
INSURANCE ADMINISTRATION, THIS PROPERTY IS WITHIN ZONE "X", (AREAS
DETERMINED TO BE OUTSIDE OF THE 0.2% ANNUAL CHANCE FLOODPLAIN). IF
THIS SITE IS NOT WITHIN AN IDENTIFIED SPECIAL FLOOD HAZARD AREA, THIS
FLOOD STATEMENT DOES NOT IMPLY THAT THE PROPERTY AND/OR THE
STRUCTURES THEREON WILL BE FREE FROM FLOODING OR FLOOD DAMAGE.
ON RARE OCCASIONS, GREATER FLOODS CAN AND WILL OCCUR AND FLOOD
HEIGHTS MAY BE INCREASED BY MAN-MADE OR NATURAL CAUSES. THIS FLOOD
STATEMENT SHALL NOT CREATE LIABILITY ON THE PART OF THE SURVEYOR.
FLOODPLAIN NOTE SITE PLANSP-1
NOTES:
1.ALL DIMENSIONS ARE TO FACE OF CURB
UNLESS OTHERWISE NOTED.
2.REFER TO ARCHITECTURAL PLANS FOR
BUILDING DIMENSIONS AND EXACT DOOR
LOCATIONS.
0
GRAPHIC SCALE
1 inch = ft.
40 40 80
40
20
VICINITY MAP
N.T.S.
SITE
BENCHMARKS
1.CAPPED IRON ROD SET APPROXIMATELY 96'
SOUTH AND 58' EAST OF SOUTHEASTERN
PROPERTY CORNER. ELEV: 783.78
2.PK NAIL FOUND APPROXIMATELY 44' NORTH
AND 20' EAST OF NORTHEASTERN
PROPERTY CORNER. ELEV: 785,24
LEGEND
FIRE LANE PER TOWN OF PROSPER
STANDARDS
CONCRETE PER TOWN OF PROSPER
STANDARDS
PROPOSED CONCRETE SIDEWALK, SEE
DETAIL SHEET C-20
PROPOSED PUBLIC SIDEWALK PER TOWN
STANDARDS
PROPOSED CONCRETE CURB AND GUTTER
PARKING COUNT
PROPOSED FIRE LANE STRIPPING
SITE DATA SUMMARY
LOT ZONING PROPOSED USE LOT SIZE
(ACRES)LOT SIZE (SQ. FT.)TOTAL BLDG.
AREA (SQ. FT.)
BLDG HGT.
(FT)
LOT COVERAGE FLOOR AREA
RATIO PARKING HANDICAP SP.TOTAL
IMPERVIOUS (SQ
FT)
LANDSCAPING OPEN SPACE
REQ.PROV.REQ.PROV.REQ. RATIO REQ.PROV.REQ.PROV.REQ. (15 SF PER PARKING SPACE)PROV.REQ. (7% NET SITE AREA), SQ FT PROV.
LOT 1, BLOCK A C
PD-7 OFFICE 5.45 237,747 57,024 1 STORY
20 FT 40% MAX 24.0%0.4:1
MAX 0.24 1/350 SF 163 229 7 13 155,156 65%3,425 85,760 17,893 19,499
TOWN OF PROSPER SITE PLAN GENERAL NOTES:
1.DUMPSTERS AND TRASH COMPACTORS SHALL BE SCREENED IN ACCORDANCE
WITH THE ZONING ORDINANCE.
2.OPEN STORAGE, WHERE PERMITTED, SHALL BE SCREENED IN ACCORDANCE WITH
THE ZONING ORDINANCE.
3.OUTDOOR LIGHTING SHALL COMPLY WITH THE LIGHTING AND GLARE STANDARDS
CONTAINED WITHIN THE ZONING ORDINANCE AND SUBDIVISION ORDINANCE.
4.LANDSCAPING SHALL CONFORM TO LANDSCAPE PLANS APPROVED BY THE TOWN.
5.ALL ELEVATIONS SHALL COMPLY WITH THE STANDARDS CONTAINED WITHIN THE
ZONING ORDINANCE.
6.BUILDINGS OF 5,000 SQUARE FEET OR GREATER SHALL BE 100% FIRE SPRINKLED.
ALTERNATIVE FIRE PROTECTION MEASURES MAY BE APPROVED BY THE FIRE
DEPARTMENT.
7.FIRE LANES SHALL BE DESIGNED AND CONSTRUCTED PER TOWN STANDARDS OR
AS DIRECTED BY THE FIRE DEPARTMENT.
8.TWO POINTS OF ACCESS SHALL BE MAINTAINED FOR THE PROPERTY AT ALL
TIMES.
9.SPEED BUMPS/HUMPS ARE NOT PERMITTED WITHIN A FIRE LANE.
10.HANDICAPPED PARKING AREAS AND BUILDING ACCESSIBILITY SHALL CONFORM
TO THE AMERICANS WITH DISABILITIES ACT (ADA) AND WITH THE REQUIREMENTS
OF THE CURRENT, ADOPTED BUILDING CODE.
11.ALL SIGNAGE IS SUBJECT TO BUILDING OFFICIAL APPROVAL.
12.ALL FENCES AND RETAINING WALLS SHALL BE SHOWN ON THE SITE PLAN AND
ARE SUBJECT TO BUILDING OFFICIAL APPROVAL.
13.ALL EXTERIOR BUILDING MATERIALS ARE SUBJECT TO BUILDING OFFICIAL
APPROVAL AND SHALL CONFORM TO THE APPROVED FAÇADE PLAN.
14.SIDEWALKS OF NOT LESS THAN SIX (6’) FEET IN WIDTH ALONG THOROUGHFARES
AND COLLECTORS AND FIVE (5’) IN WIDTH ALONG RESIDENTIAL STREETS, AND
BARRIER FREE RAMPS AT ALL CURB CROSSINGS SHALL BE PROVIDED PER TOWN
STANDARDS.
15.APPROVAL OF THE SITE PLAN IS NOT FINAL UNTIL ALL ENGINEERING PLANS ARE
APPROVED BY THE ENGINEERING DEPARTMENT.
16.SITE PLAN APPROVAL IS REQUIRED PRIOR TO GRADING RELEASE.
17.ALL NEW ELECTRICAL LINES SHALL BE INSTALLED AND/OR RELOCATED
UNDERGROUND.
18.ALL MECHANICAL EQUIPMENT SHALL BE SCREENED FROM PUBLIC VIEW IN
ACCORDANCE WITH THE ZONING ORDINANCE.
19.ALL LANDSCAPE EASEMENTS MUST BE EXCLUSIVE OF ANY OTHER TYPE OF
EASEMENT.
20.IMPACT FEES WILL BE ASSESSED IN ACCORDANCE WITH THE LAND USE
CLASSIFICATION(S) IDENTIFIED ON THE SITE DATA SUMMARY TABLE; HOWEVER,
CHANGES TO THE PROPOSED LAND USE AT THE TIME CO AND/OR FINISH-OUT
PERMIT MAY RESULT IN ADDITIONAL IMPACT FEES AND/OR PARKING
REQUIREMENTS.
21.ALL DIMENSIONS ARE TO FACE OF CURB UNLESS OTHERWISE NOTED.
22.THE APPROVAL OF A SITE PLAN SHALL BE EFFECTIVE FOR A PERIOD OF EIGHTEEN
(18) MONTHS FROM THE DATE OF APPROVAL BY THE PLANNING & ZONING
COMMISSION, AT THE END OF WHICH TIME THE APPLICANT MUST HAVE
SUBMITTED AND RECEIVED APPROVAL OF ENGINEERING PLANS AND BUILDING
PERMITS. IF THE ENGINEERING PLANS AND BUILDING PERMITS ARE NOT
APPROVED, THE SITE PLAN APPROVAL, TOGETHER WITH ANY PRELIMINARY SITE
PLAN FOR THE PROPERTY, IS NULL AND VOID.
Page 159
Item 11.
Page 1 of 2
To: Mayor and Town Council
From: Hulon T. Webb, Jr., Director of Engineering Services
Through: Harlan Jefferson, Town Manager
Rebecca Zook, Executive Director of Development and Infrastructure Services
Re: Town Council Meeting – October 13, 2020
Agenda Item:
Consider and act upon awarding Bid No. 2021-03-B to Mario Sinacola & Sons Excavating, Inc.,
related to construction services for the Cook Lane Phase I project; and authorizing the Town
Manager to execute a construction agreement for same.
Description of Agenda Item:
On September 16, 2020, ten (10) bids were received for the project. The project includes the
extension of 2,300 linear feet of Cook Lane (37’ wide concrete) from the Public Safety Facility site
to First Street. The project also includes the installation of a water line and underground drainage
system for the roadway with a substantial drainage culvert system under the road at the creek
crossing near the Public Safety Facility.
The project was advertised using the A+B Bidding alternative procurement method to allow the
Town to award the project to the contractor that offers the best value, taking into consideration the
number of days bid. The number of days bid is multiplied by the value of a calendar day as listed
below, and added to each bidder’s base bid:
Amount of Contract ($) Value of a Calendar Day($)
$1,500,000 to $1,999,999.99 $500 per day
$2,000,000 to $2,999,999.99 $1,000 per day
$3,000,000 to $3,999,999.99 $1,500 per day
$4,000,000.00 or more $2,000 per day
The base bid included the installation of four (4) 12’ x 4’ precast concrete drainage culverts under
Cook Lane at the creek crossing and during the bidding process, a contractor requested an
alternate bid be included in the bid to allow the use of five (5) 10’ x 4’ cast in place concrete
drainage culverts instead of the four (4) 12’ x 4’ precast drainage culverts. The verified bid totals
ranged between $1,771,314.50 and $3,367,236.10 for the base bid, and $1,741,064.50 and
$3,345,786.10 for the alternate bid. The Engineer's Estimate was $2,362,161.25 for the base bid.
The proposed final completion times ranged from 150 calendar days to 360 calendar days.
Prosper is a place where everyone matters.
ENGINEERING
SERVICES
Page 160
Item 12.
Page 2 of 2
After taking into consideration cost and time, Mario Sinacola & Sons Excavating, Inc, submitted
the lowest bid of $1,741,064.50 (with alternate bid), with a final completion of 150 calendar days.
Mario Sinacola & Sons Excavating, Inc., recently completed the construction of Fishtrap Road
from Teel Parkway to Stuber Elementary School project, successfully constructed the Safety Way
(E-W Collector) project in front of the Public Safety Facility, and is now working on the construction
of the Prosper Trail (Coit Road – Custer Road) project. Staff checked the references provided
and received positive feedback.
Budget Impact:
The cost for the construction is $1,741,064.50 (with alternate bid). The FY 2020-2021 Capital
Improvement Program includes $2,705,391.62 ($2,385,995.50 in Street Account, and
$319,396.12 in Water Account) for the construction of the Cook Lane Phase I project. Of the
available funding for the project, $1,536,050.00 of the $2,385,995.50 to be allocated from the
Street Account, and $205,014.50 of the $319,396.12 to be allocated from the Water Account. The
funding sources are Account No. 750-6610-10-00-1708-ST and 760-6610-10-00-1708-WA.
The construction budget for the Cook Lane Phase I and Phase II projects is $3,900,000 (includes
$400,000 from the Water Account). The available funding for the Cook Lane Phase I project
discussed above, includes the reduction of the construction costs allocated to the recently
completed Cook Lane Phase II project. Based on the combined construction costs for the two
phases, the overall project is $964,327.12 under budget.
Legal Obligations and Review:
Terrence Welch of Brown & Hofmeister, L.L.P., has approved the standard construction
agreement as to form and legality.
Attached Documents:
1. Location Map
2. Bid Tabulation Summary
3. Construction Agreement
Town Staff Recommendation:
Town staff recommends that the Town Council award Bid No. 2021-03-B to Mario Sinacola & Sons
Excavating, Inc., related to construction services for the Cook Lane Phase I project, and authorize
the Town Manager to execute a construction agreement for same.
Proposed Motion:
I move to award Bid No. 2021-03-B to Mario Sinacola & Sons Excavating, Inc., related to
construction services for the Cook Lane Phase I project, and authorize the Town Manager to
execute a construction agreement for same.
Page 161
Item 12.
Cook Lane Phase 1 Improvements
Safety Way
Public Works Yard
First Street
Public Safety Building Cook Ln Page 162
Item 12.
Solicitation Number
Solicitation Title
Close Date
Responding Supplier Base Bid (A)Time Value (B)Total Value
Mario Sinacola & Sons Excavating, Inc.1,771,314.50$ 75,000.00$ 1,846,314.50$
Pavecon Public Works, LP 1,947,432.84$ 87,500.00$ 2,034,932.84$
DDM Construction Corporation 2,086,220.00$ 240,000.00$ 2,326,220.00$
Reliable Paving, Inc 1,989,341.30$ 105,000.00$ 2,094,341.30$
Tiseo Paving Co.2,143,911.50$ 180,000.00$ 2,323,911.50$
McMahon Contracting LP 2,230,221.31$ 240,000.00$ 2,470,221.31$
GRod Construction, LLC 2,364,071.50$ 270,000.00$ 2,634,071.50$
Accelerated Critical Path, Inc.2,417,200.00$ 190,000.00$ 2,607,200.00$
HQS Construction 2,687,840.00$ 290,000.00$ 2,977,840.00$
Joe Funk Construction, Inc 3,367,236.10$ 360,000.00$ 3,727,236.10$
Responding Supplier Alternate Bid (A)Time Value (B)Total Value
Mario Sinacola & Sons Excavating, Inc.1,741,064.50$ 75,000.00$ 1,816,064.50$
Pavecon Public Works, LP No Bid No Bid No Bid
DDM Construction Corporation 2,055,970.00$ 240,000.00$ 2,295,970.00$
Reliable Paving, Inc 2,063,921.30$ 210,000.00$ 2,273,921.30$
Tiseo Paving Co.2,116,961.50$ 180,000.00$ 2,296,961.50$
McMahon Contracting LP 2,199,729.31$ 240,000.00$ 2,439,729.31$
GRod Construction, LLC 2,364,071.50$ 270,000.00$ 2,634,071.50$
Accelerated Critical Path, Inc.2,413,900.00$ 190,000.00$ 2,603,900.00$
HQS Construction 2,764,840.00$ 290,000.00$ 3,054,840.00$
Joe Funk Construction, Inc 3,345,786.10$ 360,000.00$ 3,705,786.10$
TOWN OF PROSPER
BID TABULATION SUMMARY
Bid No. 2021-03-B
Cook Lane Phase 1
9/16/2020 2:00PM
Attachment 2
Page 163
Item 12.
BID NO: 2021-03-B
COOK LANE PHASE 1
1
CONTRACT DOCUMENTS AND SPECIFICATIONS
FOR
COOK LANE PHASE 1
BID NO. 2021-03-B
TOWN OF PROSPER
COLLIN COUNTY, TEXAS
TOWN OFFICIALS
Ray Smith, Mayor
Curry Vogelsang, Jr., Mayor Pro-Tem
Jason Dixon, Deputy Mayor Pro-Tem
Marcus E. Ray, Place 1
Craig Andres, Place 2
Meigs Miller, Place 4
Jeff Hodges, Place 5
Harlan Jefferson, Town Manager
Attachment 3
Page 164
Item 12.
BID NO: 2021-03-B
COOK LANE PHASE 1
2
TABLE OF CONTENTS
TABLE OF CONTENTS .................................................................................................. 2
LEGAL NOTICE .............................................................................................................. 3
INSTRUCTIONS TO BIDDERS ...................................................................................... 4
SAMPLE CONSTRUCTION AGREEMENT .................................................................... 6
PERFORMANCE BOND ............................................................................................... 19
PAYMENT BOND.......................................................................................................... 22
MAINTENANCE BOND ................................................................................................. 25
SPECIAL CONDITIONS ................................................................................................ 28
TECHNICAL SPECIFICATIONS ................................................................................... 30
Attachment 3
Page 165
Item 12.
BID NO: 2021-03-B
COOK LANE PHASE 1
3
LEGAL NOTICE
The Town of Prosper is accepting competitive sealed bids for BID NO. 2021-03-B COOK LANE PHASE 1.
Bids will be accepted online through IonWave.net, the Town’s e-procurement system, or in hard copy in the
Purchasing Office located in the 3rd Floor Finance Suite of Town Hall, 250 W. First St., Prosper, Texas 75078
until 2:00 P.M. on, Monday, September 14,2020. Any bids received after this time will not be accepted, and
will be returned unopened. The bid opening will be held online on Monday, September 14, 2020 @ 2:30
P.M. To participate in the bid opening, please use the following:
Join Zoom Meeting: https://us02web.zoom.us/j/82081692651
Meeting ID: 820 8169 2651
Dial-in any of these numbers: +1 929 436 2866, +1 312 626 6799, +1 669 900 6833, +1 253 215 8782,
+1 301 715 8592 or +1 346 248 7799
The Project consists of furnishing all labor, equipment and materials (except as otherwise specified), and
performing all work necessary for the construction of Grading, Paving, Drainage, and Utility Improvements
for Cook Lane Phase 1.
Each bid submitted shall be accompanied by a cashier's check in the amount of 5% of the maximum amount
bid, payable without recourse to the Town of Prosper, or a Bid Bond in the same amount from a reliable
surety company as a guarantee that, if awarded the contract, the successful Contractor will execute a
Construction Agreement with the Town, including all required bonds and other documents.
The successful Contractor shall furnish a Performance Bond in the amount of 115% of the contract amount,
and a Payment Bond in the amount of 100% of the contract amount, as well as evidence of all required
insurance coverage within ten (10) calendar days of notice of award. The successful Contractor shall also
furnish a Maintenance Bond in the amount of 100% of the contract amount covering defects of material and
workmanship for two calendar years following the Town's approval and acceptance of the construction. An
approved surety company, licensed in the State of Texas, shall issue all bonds in accordance with Texas
law.
Copies of Plans, Specifications, and Contract Documents may be examined at Town of Prosper
Engineering Department, 250 W. First Street, Prosper, Texas, 75078, Phone: (972) 569-1198 without
charge. These documents may be acquired from that office for the non-refundable purchase price of $50.00
per set, payable to the Town of Prosper. Copies of Plans, Specifications, and Contract Documents may also
be downloaded free of charge from Current Bidding Opportunities, at the following link:
http://www.prospertx.gov/business/bid-opportunities/.
Questions and requests for clarifications in regards to this bid should be submitted in writing through
IonWave.net, the Town’s e-procurement system, or emailed directly to January Cook, CPPO, CPPB,
Purchasing Manager, at jcook@prospertx.gov. The deadline for receipt of questions and requests for
clarifications is 12:00 P.M. on Wednesday, September 9, 2020. After that day and time, no further questions
or requests for clarifications will be accepted or answered by the Engineer or Town.
Attachment 3
Page 166
Item 12.
BID NO: 2021-03-B
COOK LANE PHASE 1
4
INSTRUCTIONS TO BIDDERS
1. Submittal Deadline: Bids will be accepted until 2:00 P.M. on Monday, September 14, 2020.
2. Submittal Location: Bids will be accepted online through IonWave.net, the Town’s e-procurement system,
or in hard copy in the Purchasing Office located in the 3rd Floor Finance Suite of Town Hall, 250 W. First
St., Prosper, Texas 75078.
3. Electronic Submittal Requirements: If submitting bid through IonWave.net, Bidder shall complete all
requested information and submit all required documents.
4. Hard Copy Submittal Requirements: If submitting bid in hard copy, Bidder shall submit one (1) original
and one (1) copy of their bid in a sealed envelope clearly marked with their name and BID NO.
2021-03-B Cook Lane Phase 1. Bidder shall complete all requested information and submit all required
documents.
5. Bid Opening: The bid opening will be held online on Monday, September 14,2020 @ 2:30 P.M. To
participate in the bid opening, please use the following:
Join Zoom Meeting: https://us02web.zoom.us/j/82081692651
Meeting ID: 820 8169 2651
Dial-in any of these numbers: +1 929 436 2866, +1 312 626 6799, +1 669 900 6833, +1 253 215 8782,
+1 301 715 8592, +1 346 248 7799
6. Bid Documents: Copies of Plans, Specifications, and Contract Documents may be examined without
charge at the following location:
Town of Prosper Engineering Department
250 W. First Street
Prosper, TX 75078
Phone: 972-569-1198
or
Download free of charge from Current Bidding Opportunities, at the following link:
http://www.prospertx.gov/business/bid-opportunities/.
7. Questions and Requests for Clarification: Questions and requests for clarifications in regards to this bid
should be submitted in writing through IonWave.net, the Town’s e-procurement system, or emailed
directly to January Cook, CPPO, CPPB, Purchasing Manager, at jcook@prospertx.gov. The deadline for
receipt of questions and requests for clarifications is 12:00 P.M. on Wednesday, September 9, 2020.
After that day and time, no further questions or requests for clarifications will be accepted or answered
by the Engineer or Town.
8. Addenda: If it becomes necessary to provide additional information to potential Bidders, the Town of
Prosper will issue an addendum containing the necessary information.
9. Pre-Bid Meeting: A pre-bid meeting will be held for this project online at 11:00 A.M., Thursday,
September 3, 2020. Attendance is optional. To participate in the bid opening, please use the following:
Attachment 3
Page 167
Item 12.
BID NO: 2021-03-B
COOK LANE PHASE 1
5
Join Zoom Meeting: https://us02web.zoom.us/j/86069377992
Meeting ID: 820 8169 2651
Dial-in any of these numbers: +1 929 436 2866, +1 312 626 6799, +1 669 900 6833, +1 253 215 8782,
+1 301 715 8592, +1 346 248 7799
10. Site Visit: N/A
Attachment 3
Page 168
Item 12.
BID NO: 2021-03-B
COOK LANE PHASE 1
6
CONSTRUCTION AGREEMENT
THE STATE OF TEXAS )
) KNOW ALL MEN BY THESE PRESENTS:
COUNTY OF COLLIN )
This Construction Agreement (the "Agreement") is made by and between Mario Sinacola & Sons
Excavating, Inc., a company authorized to do business in Texas, (the "Contractor") and the Town of
Prosper, Texas, a municipal corporation (the "Owner"). For and in consideration of the payment,
agreements and conditions hereinafter mentioned, and under the conditions expressed in the bonds herein,
Contractor hereby agrees to complete the construction of improvements described as follows:
BID NO. 2021-03-B
COOK LANE PHASE 1
(BASE BID EXCLUDING LINE ITEM 18, AND ALTERNATE LINE ITEM 52)
in the Town of Prosper, Texas, and all extra work in connection therewith, under the terms as stated in the
terms of this Contract, including all Contract Documents incorporated herein; and at his, her or their own
proper cost and expense to furnish all superintendence, labor, insurance, equipment, tools and other
accessories and services necessary to complete the said construction in accordance with all the Contract
Documents, incorporated herein as if written word for word, and in accordance with the Plans, which include
all maps, plats, blueprints, and other drawings and printed or written explanatory manner therefore, and the
Specifications as prepared by Town of Prosper or its consultant hereinafter called Engineer, who has been
identified by the endorsement of the Contractor's written bid, the General Conditions of this Contract, the
Special Conditions of this Contract, the payment, performance, and maintenance bonds hereto attached; all
of which are made a part hereof and collectively evidence and constitute the entire Contract.
A. Contract Documents and Order of Precedence
The Contract Documents shall consist of the following documents:
1. this Construction Agreement;
2. properly authorized change orders;
3. the Special Conditions of this Contract;
4. the General Conditions of this Contract;
5. the Technical Specifications & Construction Drawings of this Contract;
6. the OWNER's Standard Construction Details;
7. the OWNER's Standard Construction Specifications;
8. the OWNER’s written notice to proceed to the CONTRACTOR;
9. the Contractor’s Cost Bid;
10. any listed and numbered addenda;
11. the Performance, Payment, and Maintenance Bonds; and,
12. any other bid materials distributed by the Owner that relate to the Project.
These Contract Documents are incorporated by reference into this Construction Agreement as if set
out here in their entirety. The Contract Documents are intended to be complementary; what is called for by
one document shall be as binding as if called for by all Contract Documents. It is specifically provided,
Attachment 3
Page 169
Item 12.
BID NO: 2021-03-B
COOK LANE PHASE 1
7
however, that in the event of any inconsistency in the Contract Documents, the inconsistency shall be
resolved by giving precedence to the Contract Documents in the order in which they are listed herein above.
If, however, there exists a conflict or inconsistency between the Technical Specifications and the Construction
Drawings it shall be the Contractor’s obligation to seek clarification as to which requirements or provisions
control before undertaking any work on that component of the project. Should the Contractor fail or refuse
to seek a clarification of such conflicting or inconsistent requirements or provisions prior to any work on that
component of the project, the Contractor shall be solely responsible for the costs and expenses - including
additional time - necessary to cure, repair and/or correct that component of the project.
B. Total of Payments Due Contractor
For performance of the Work in accordance with the Contract Documents, the Owner shall pay the
Contractor in current funds an amount not to exceed One Million Seven Hundred Forty-One Thousand
Sixty-Four Dollars and Fifty Cents ($1,741,064.50). This amount is subject to adjustment by change order
in accordance with the Contract Documents.
C. Dates to Start and Complete Work
Contractor shall begin work within ten (10) calendar days after receiving a written Notice to Proceed
or written Work Order from the Owner. All Work required under the Contract Documents shall be substantially
completed within 130 calendar days after the date of the Notice to Proceed for the base bid. Within 20
additional calendar days after Substantial Completion, all outstanding issues shall be addressed and ready
for final payment.
Under this Construction Agreement, all references to “day” are to be considered “calendar days”
unless noted otherwise.
D. CONTRACTOR'S INDEMNITY TO THE OWNER AND OTHERS
CONTRACTOR DOES HEREBY AGREE TO WAIVE ALL CLAIMS, RELEASE, INDEMNIFY,
DEFEND AND HOLD HARMLESS THE TOWN OF PROSPER (OWNER) TOGETHER WITH ITS MAYOR
AND TOWN COUNCIL AND ALL OF ITS OFFICIALS, OFFICERS, AGENTS AND EMPLOYEES, IN BOTH
THEIR PUBLIC AND PRIVATE CAPACITIES, FROM AND AGAINST ANY AND ALL CITATIONS, CLAIMS, COSTS, DAMAGES, DEMANDS, EXPENSES, FINES, JUDGMENTS, LIABILITY, LOSSES, PENALTIES,
SUITS OR CAUSES OF ACTION OF EVERY KIND INCLUDING ALL EXPENSES OF LITIGATION AND/OR
SETTLEMENT, COURT COSTS AND ATTORNEY FEES WHICH MAY ARISE BY REASON OF INJURY TO
OR DEATH OF ANY PERSON OR FOR LOSS OF, DAMAGE TO, OR LOSS OF USE OF ANY PROPERTY
OCCASIONED BY ERROR, OMISSION, OR NEGLIGENT ACT OF CONTRACTOR, ITS
SUBCONTRACTORS, ANY OFFICERS, AGENTS OR EMPLOYEES OF CONTRACTOR OR ANY
SUBCONTRACTORS, INVITEES, AND ANY OTHER THIRD PARTIES OR PERSONS FOR WHOM OR
WHICH CONTRACTOR IS LEGALLY RESPONSIBLE, IN ANY WAY ARISING OUT OF, RELATING TO, RESULTING FROM, OR IN CONNECTION WITH THE PERFORMANCE OF THIS CONTRACT, AND
CONTRACTOR WILL AT HIS OR HER OWN COST AND EXPENSE DEFEND AND PROTECT TOWN OF
PROSPER (OWNER) FROM ANY AND ALL SUCH CLAIMS AND DEMANDS.
CONTRACTOR DOES HEREBY AGREE TO WAIVE ALL CLAIMS, RELEASE, INDEMNIFY,
DEFEND AND HOLD HARMLESS TOWN OF PROSPER (OWNER) TOGETHER WITH ITS MAYOR AND
Attachment 3
Page 170
Item 12.
BID NO: 2021-03-B
COOK LANE PHASE 1
8
TOWN COUNCIL AND ALL OF ITS OFFICIALS, OFFICERS, AGENTS, AND EMPLOYEES, FROM AND AGAINST ANY AND ALL CITATIONS, CLAIMS, COSTS, DAMAGES, DEMANDS, EXPENSES, FINES,
JUDGMENTS, LIABILITY, LOSSES, PENALTIES, SUITS OR CAUSES OF ACTION OF EVERY KIND
INCLUDING ALL EXPENSES OF LITIGATION AND/OR SETTLEMENT, COURT COSTS AND ATTORNEYS
FEES FOR INJURY OR DEATH OF ANY PERSON OR FOR LOSS OF, DAMAGES TO, OR LOSS OF USE
OF ANY PROPERTY, ARISING OUT OF OR IN CONNECTION WITH THE PERFORMANCE OF THIS
CONTRACT. SUCH INDEMNITY SHALL APPLY WHETHER THE CITATIONS, CLAIMS, COSTS,
DAMAGES, DEMANDS, EXPENSES, FINES, JUDGMENTS, LIABILITY, LOSSES, PENALTIES, SUITS OR
CAUSES OF ACTION ARISE IN WHOLE OR IN PART FROM THE NEGLIGENCE OF THE TOWN OF PROSPER (OWNER), ITS MAYOR AND TOWN COUNCIL, OFFICERS, OFFICIALS, AGENTS OR
EMPLOYEES. IT IS THE EXPRESS INTENTION OF THE PARTIES HERETO THAT THE INDEMNITY
PROVIDED FOR IN THIS PARAGRAPH IS INDEMNITY BY CONTRACTOR TO INDEMNIFY AND PROTECT
TOWN OF PROSPER (OWNER) FROM THE CONSEQUENCES OF TOWN OF PROSPER’S (OWNER'S)
OWN NEGLIGENCE, WHETHER THAT NEGLIGENCE IS A SOLE OR CONCURRING CAUSE OF THE
INJURY, DEATH OR DAMAGE.
IN ANY AND ALL CLAIMS AGAINST ANY PARTY INDEMNIFIED HEREUNDER BY ANY EMPLOYEE OF THE CONTRACTOR, ANY SUB-CONTRACTOR, ANYONE DIRECTLY OR INDIRECTLY
EMPLOYED BY ANY OF THEM OR ANYONE FOR WHOSE ACTS ANY OF THEM MAY BE LIABLE, THE
INDEMNIFICATION OBLIGATION HEREIN PROVIDED SHALL NOT BE LIMITED IN ANY WAY BY ANY
LIMITATION ON THE AMOUNT OR TYPE OF DAMAGES, COMPENSATION OR BENEFITS PAYABLE BY
OR FOR THE CONTRACTOR OR ANY SUB-CONTRACTOR UNDER WORKMEN'S COMPENSATION OR
OTHER EMPLOYEE BENEFIT ACTS.
INDEMNIFIED ITEMS SHALL INCLUDE ATTORNEYS' FEES AND COSTS, COURT COSTS, AND SETTLEMENT COSTS. INDEMNIFIED ITEMS SHALL ALSO INCLUDE ANY EXPENSES, INCLUDING
ATTORNEYS' FEES AND EXPENSES, INCURRED BY AN INDEMNIFIED INDIVIDUAL OR ENTITY IN
ATTEMPTING TO ENFORCE THIS INDEMNITY.
In its sole discretion, the Owner shall have the right to approve counsel to be retained by Contractor
in fulfilling its obligation to defend and indemnify the Owner. Contractor shall retain approved counsel for the
Owner within seven (7) business days after receiving written notice from the Owner that it is invoking its right
to indemnification under this Construction Agreement. If Contractor does not retain counsel for the Owner
within the required time, then the Owner shall have the right to retain counsel and the Contractor shall pay
these attorneys' fees and expenses.
The Owner retains the right to provide and pay for any or all costs of defending indemnified items,
but it shall not be required to do so. To the extent that Owner elects to provide and pay for any such
costs, Contractor shall indemnify and reimburse Owner for such costs.
(Please note that this “broad-form” indemnification clause is not prohibited by Chapter 151 of the Texas
Insurance Code as it falls within one of the exclusions contained in Section 151.105 of the Texas
Insurance Code.)
Attachment 3
Page 171
Item 12.
BID NO: 2021-03-B
COOK LANE PHASE 1
9
E. Insurance Requirements
Contractor shall procure and maintain for the duration of the contract, insurance against claims for
injuries to persons or damages to property which may arise from or in connection with the
performance of the work hereunder by the vendor, his agents, representatives, employees or
subcontractors. The cost of such insurance shall be included in the contractor’s bid. A certificate of
insurance meeting all requirements and provisions outlined herein shall be provided to the Town
prior to any services being performed or rendered. Renewal certificates shall also be supplied upon
expiration. Certificates holder shall be listed as follows, with the project/contract number referenced:
Town of Prosper
Attn: Purchasing Manager
P.O. Box 307
Prosper, Texas 75078
re: BID No. 2021-03-B
Cook Lane Phase 1
1. Minimum Scope of Insurance
Coverage shall be at least as broad as:
a. ISO Form Number GL 00 01 (or similar form) covering Comprehensive General
Liability. “Occurrence” form only, “claims made” forms are unacceptable.
b. Workers’ Compensation insurance as required by the Labor Code of the State of
Texas, including Employers’ Liability Insurance.
c. Automobile Liability as required by the State of Texas, covering all owned, hired, or
non-owned vehicles. Automobile Liability is only required if vehicle(s) will be used
under this contract.
2. Minimum Limits of Insurance
Contractor shall maintain throughout contract limits not less than:
a. Commercial General Liability: $1,000,000 per occurrence / $2,000,000 in the
aggregate for third party bodily injury, personal injury and property damage. Policy
will include coverage for:
1) Premises / Operations
2) Broad Form Contractual Liability
3) Products and Completed Operations
Attachment 3
Page 172
Item 12.
BID NO: 2021-03-B
COOK LANE PHASE 1
10
4) Personal Injury
5) Broad Form Property Damage
6) Explosion Collapse and Underground (XCU) Coverage.
b. Workers’ Compensation and Employer’s Liability: Workers’ Compensation limits as
required by the Labor Code of the State of Texas and Statutory Employer’s Liability
minimum limits of $100,000 per injury, $300,000 per occurrence, and $100,000 per
occupational disease.
c. Automobile Liability: $1,000,000 Combined Single Limit. Limits can only be reduced
if approved by the Town. Automobile liability shall apply to all owned, hired and non-
owned autos.
d. Builders’ Risk Insurance: Completed value form, insurance carried must be equal to
the completed value of the structure. Town shall be listed as Loss Payee.
e. $1,000,000 Umbrella Liability Limit that follows form over underlying Automobile
Liability, General Liability, and Employers Liability coverages.
3. Deductible and Self-Insured Retentions
Any deductible or self-insured retentions in excess of $10,000 must be declared to and
approved by the Town.
4. Other Insurance Provisions
The policies are to contain, or be endorsed to contain the following provisions:
a. General Liability and Automobile Liability Coverage
1) The Town, its officers, officials, employees, boards and commissions and
volunteers are to be added as “Additional Insured’s” relative to liability
arising out of activities performed by or on behalf of the contractor, products
and completed operations of the contractor, premises owned, occupied or
used by the contractor. The coverage shall contain no special limitations on
the scope of protection afforded to the Town, its officers, officials,
employees or volunteers.
2) The contractor’s insurance coverage shall be primary insurance in respects
to the Town, its officers, officials, employees and volunteers. Any insurance
or self- insurance maintained by the Town, its officers, officials, employees
or volunteers shall be in excess of the contractor’s insurance and shall not
contribute with it.
Attachment 3
Page 173
Item 12.
BID NO: 2021-03-B
COOK LANE PHASE 1
11
3) Any failure to comply with reporting provisions of the policy shall not affect
coverage provided to the Town, its officers, officials, employees, boards
and commissions or volunteers.
4) The contractor’s insurance shall apply separately to each insured against
whom the claim is made or suit is brought, except to the limits of the
insured’s limits of liability.
b. Workers’ Compensation and Employer’s Liability Coverage
The insurer shall agree to waive all rights of subrogation against the Town, its
officers, officials, employees and volunteers for losses arising from work performed
by the contractor for the Town.
c. All Coverages
Each insurance policy required by this clause shall be endorsed to state that
coverage shall not be suspended, voided, canceled or non-renewed by either party,
reduced in coverage or in limits except after 30 days written notice to the Town for
all occurrences, except 10 days written notice to the Town for non-payment.
5. Acceptability of Insurers
The Town prefers that Insurance be placed with insurers with an A.M. Best’s rating of no
less than A- VI, or better.
6. Verification of Coverage
Contractor shall provide the Town with certificates of insurance indicating coverage’s
required. The certificates are to be signed by a person authorized by that insurer to bind
coverage on its behalf. Certificates of Insurance similar to the ACORD Form are acceptable.
Town will not accept Memorandums of Insurance or Binders as proof of insurance.
The Town reserves the right to require complete, certified copies of all required insurance
policies at any time.
F. Performance, Payment and Maintenance Bonds
The Contractor shall procure and pay for a Performance Bond applicable to the work in the amount
of one hundred fifteen percent (115%) of the total proposed price, and a Payment Bond applicable to the
work in the amount of one hundred percent (100%) of the total proposed price. The Contractor shall also
procure and pay for a Maintenance Bond applicable to the work in the amount of one hundred percent (100%)
of the total proposed price. The period of the Maintenance Bond shall be two years from the date of
acceptance of all work done under the contract, to cover the guarantee as set forth in this
Construction Agreement. The performance, payment and maintenance bonds shall be issued in the form
attached to this Construction Agreement as Exhibits B, C and D. Other performance, payment and
maintenance bond forms shall not be accepted. Among other things, these bonds shall apply to any work
performed during the two-year warranty period after acceptance as described in this Construction Agreement.
Attachment 3
Page 174
Item 12.
BID NO: 2021-03-B
COOK LANE PHASE 1
12
The performance, payment and maintenance bonds shall be issued by a corporate surety,
acceptable to and approved by the Town, authorized to do business in the State of Texas, pursuant to
Chapter 2253 of the Texas Government Code. Further, the Contractor shall supply capital and surplus
information concerning the surety and reinsurance information concerning the performance, payment and
maintenance bonds upon Town request. In addition to the foregoing requirements, if the amount of the bond
exceeds One Hundred Thousand Dollars ($100,000) the bond must be issued by a surety that is qualified as
a surety on obligations permitted or required under federal law as indicated by publication of the surety’s
name in the current U.S. Treasury Department Circular 570. In the alternative, an otherwise acceptable
surety company (not qualified on federal obligations) that is authorized and admitted to write surety bonds in
Texas must obtain reinsurance on any amounts in excess of One Hundred Thousand Dollars ($100,000)
from a reinsurer that is authorized and admitted as a reinsurer in Texas who also qualifies as a surety or
reinsurer on federal obligations as indicated by publication of the surety’s or reinsurer’s name in the current
U.S. Treasury Department Circular 570.
G. Progress Payments and Retainage
As it completes portions of the Work, the Contractor may request progress payments from the Owner.
Progress payments shall be made by the Owner based on the Owner's estimate of the value of the Work
properly completed by the Contractor since the time the last progress payment was made. The "estimate of
the value of the work properly completed" shall include the net invoice value of acceptable, non-perishable
materials actually delivered to and currently at the job site only if the Contractor provides to the Owner
satisfactory evidence that material suppliers have been paid for these materials.
No progress payment shall be due to the Contractor until the Contractor furnishes to the Owner:
1. copies of documents reasonably necessary to aid the Owner in preparing an estimate of the
value of Work properly completed;
2. full or partial releases of liens, including releases from subcontractors providing materials or
delivery services relating to the Work, in a form acceptable to the Owner releasing all liens
or claims relating to goods and services provided up to the date of the most recent previous
progress payment;
3. an updated and current schedule clearly detailing the project’s critical path elements; and
4. any other documents required under the Contract Documents.
Progress payments shall not be made more frequently than once every thirty (30) calendar days
unless the Owner determines that more frequent payments are appropriate. Further, progress payments are
to be based on estimates and these estimates are subject to correction through the adjustment of subsequent
progress payments and the final payment to Contractor. If the Owner determines after final payment that it
has overpaid the Contractor, then Contractor agrees to pay to the Owner the overpayment amount specified
by the Owner within thirty (30) calendar days after it receives written demand from the Owner.
The fact that the Owner makes a progress payment shall not be deemed to be an admission by the
Owner concerning the quantity, quality or sufficiency of the Contractor's work. Progress payments shall not
Attachment 3
Page 175
Item 12.
BID NO: 2021-03-B
COOK LANE PHASE 1
13
be deemed to be acceptance of the Work nor shall a progress payment release the Contractor from any of
its responsibilities under the Contract Documents.
After determining the amount of a progress payment to be made to the Contractor, the Owner shall
withhold a percentage of the progress payment as retainage. The amount of retainage withheld from each
progress payment shall be set at five percent (5%). Retainage shall be withheld and may be paid to:
1. ensure proper completion of the Work. The Owner may use retained funds to pay
replacement or substitute contractors to complete unfinished or defective work;
2. ensure timely completion of the Work. The Owner may use retained funds to pay liquidated
damages; and
3. provide an additional source of funds to pay claims for which the Owner is entitled to
indemnification from Contractor under the Contract Documents.
Retained funds shall be held by the Owner in accounts that shall not bear interest. Retainage not
otherwise withheld in accordance with the Contract Documents shall be returned to the Contractor as part of
the final payment.
H. Withholding Payments to Contractor
The Owner may withhold payment of some or all of any progress or final payment that would
otherwise be due if the Owner determines, in its discretion, that the Work has not been performed in
accordance with the Contract Documents. The Owner may use these funds to pay replacement or substitute
contractors to complete unfinished or defective Work.
The Owner may withhold payment of some or all of any progress or final payment that would
otherwise be due if the Owner determines, in its discretion, that it is necessary and proper to provide an
additional source of funds to pay claims for which the Owner is entitled to indemnification from Contractor
under the Contract Documents.
Amounts withheld under this section shall be in addition to any retainage.
I. Acceptance of the Work
When the Work is completed, the Contractor shall request that the Owner perform a final inspection.
The Owner shall inspect the Work. If the Owner determines that the Work has been completed in accordance
with the Contract Documents, it shall issue a written notice of acceptance of the Work. If the Owner
determines that the Work has not been completed in accordance with the Contract Documents, then it shall
provide the Contractor with a verbal or written list of items to be completed before another final inspection
shall be scheduled.
It is specifically provided that Work shall be deemed accepted on the date specified in the Owner's
written notice of acceptance of the Work. The Work shall not be deemed to be accepted based on
"substantial completion" of the Work, use or occupancy of the Work, or for any reason other than the Owner's
Attachment 3
Page 176
Item 12.
BID NO: 2021-03-B
COOK LANE PHASE 1
14
written Notice of Acceptance. Further, the issuance of a certificate of occupancy for all or any part of the
Work shall not constitute a Notice of Acceptance for that Work.
In its discretion, the Owner may issue a Notice of Acceptance covering only a portion of the Work.
In this event, the notice shall state specifically what portion of the Work is accepted.
J. Acceptance of Erosion Control Measures
When the erosion control measures have been completed, the Contractor shall request that the
Owner perform a final inspection. The Owner shall inspect the Work. If the Owner determines that the Work
has been completed in accordance with the Contract Documents and per TPDES General Construction
Permit, it shall issue a written Notice of Acceptance of the Work. If the Owner determines that the Work has
not been completed in accordance with the Contract Documents or TPDES General Construction Permit,
then it shall provide the Contractor with a verbal or written list of items to be completed before another final
inspection shall be scheduled.
K. Final Payment
After all Work required under the Contract Documents has been completed, inspected, and
accepted, the Town shall calculate the final payment amount promptly after necessary measurements and
computations are made. The final payment amount shall be calculated to:
1. include the estimate of the value of Work properly completed since the date of the most
recent previous progress payment;
2. correct prior progress payments; and
3. include retainage or other amounts previously withheld that are to be returned to Contractor,
if any.
Final payment to the Contractor shall not be due until the Contractor provides original full releases
of liens from the Contractor and its subcontractors, or other evidence satisfactory to the Owner to show that
all sums due for labor, services, and materials furnished for or used in connection with the Work have been
paid or shall be paid with the final payment. To ensure this result, Contractor consents to the issuance of the
final payment in the form of joint checks made payable to Contractor and others. The Owner may, but is not
obligated to issue final payment using joint checks.
Final payment to the Contractor shall not be due until the Contractor has supplied to the Owner
original copies of all documents that the Owner determines are reasonably necessary to ensure both that the
final payment amount is properly calculated and that the Owner has satisfied its obligation to administer the
Construction Agreement in accordance with applicable law. The following documents shall, at a minimum,
be required to be submitted prior to final payment being due: redline as-built construction plans; consent of
surety to final payment; public infrastructure inventory; affidavit of value for public infrastructure; and, final
change order(s). “Redline as-built construction plans” shall include, but are not limited to markups for change
orders, field revisions, and quantity overruns as applicable. The list of documents contained in this provision
is not an exhaustive and exclusive list for every project performed pursuant to these Contract Documents
Attachment 3
Page 177
Item 12.
BID NO: 2021-03-B
COOK LANE PHASE 1
15
and Contractor shall provide such other and further documents as may be requested and required by the
Owner to close out a particular project.
Subject to the requirements of the Contract Documents, the Owner shall pay the Final Payment
within thirty (30) calendar days after the date specified in the Notice of Acceptance. This provision shall apply
only after all Work called for by the Contract Documents has been accepted.
L. Contractor’s Warranty
For a two-year period after the date specified in a written notice of acceptance of Work, Contractor
shall provide and pay for all labor and materials that the Owner determines are necessary to correct all
defects in the Work arising because of defective materials or workmanship supplied or provided by Contractor
or any subcontractor. This shall also include areas of vegetation that did meet TPDES General Construction
Permit during final close out but have since become noncompliant.
Forty-five (45) to sixty (60) calendar days before the end of the two-year warranty period, the Owner
may make a warranty inspection of the Work. The Owner shall notify the Contractor of the date and time of
this inspection so that a Contractor representative may be present. After the warranty inspection, and before
the end of the two-year warranty period, the Owner shall mail to the Contractor a written notice that specifies
the defects in the Work that are to be corrected.
The Contractor shall begin the remedial work within ten (10) calendar days after receiving the written
notice from the Town. If the Contractor does not begin the remedial work timely or prosecute it diligently,
then the Owner may pay for necessary labor and materials to effect repairs and these expenses shall be paid
by the Contractor, the performance bond surety, or both.
If the Owner determines that a hazard exists because of defective materials and workmanship, then
the Owner may take steps to alleviate the hazard, including making repairs. These steps may be taken
without prior notice either to the Contractor or its surety. Expenses incurred by the Owner to alleviate the
hazard shall be paid by the Contractor, the performance bond surety, or both.
Any Work performed by or for the Contractor to fulfill its warranty obligations shall be performed in
accordance with the Contract Documents. By way of example only, this is to ensure that Work performed
during the warranty period is performed with required insurance and the performance and payment bonds
still in effect.
Work performed during the two-year warranty period shall itself be subject to a one-year warranty.
This warranty shall be the same as described in this section.
The Owner may make as many warranty inspections as it deems appropriate.
Attachment 3
Page 178
Item 12.
BID NO: 2021-03-B
COOK LANE PHASE 1
16
M. Compliance with Laws
The Contractor shall be responsible for ensuring that it and any subcontractors performing any
portion of the Work required under the Contract Documents comply with all applicable federal, state, county,
and municipal laws, regulations, and rules that relate in any way to the performance and completion of the
Work. This provision applies whether or not a legal requirement is described or referred to in the Contract
Documents.
Ancillary/Integral Professional Services: In selecting an architect, engineer, land surveyor, or other
professional to provide professional services, if any, that are required by the Contract Documents, Contractor
shall not do so on the basis of competitive bids but shall make such selection on the basis of demonstrated
competence and qualifications to perform the services in the manner provided by Section 2254.004 of the
Texas Government Code and shall so certify to the Town the Contractor's agreement to comply with this
provision with Contractor's bid.
N. “Anti-Israel Boycott” Provision
In accordance with Chapter 2270, Texas Government Code, a Texas governmental entity may not
enter into a contract with a company for the provision of goods or services unless the contract contains a
written verification from the company that it: (1) does not boycott Israel; and (2) will not boycott Israel during
the term of the contract. Chapter 2270 does not apply to a (1) a company that is a sole proprietorship; (2) a
company that has fewer than ten (10) full-time employees; or (3) a contract that has a value of less than One
Hundred Thousand Dollars ($100,000.00). Unless the company is not subject to Chapter 2270 for the
reasons stated herein, the signatory executing this Agreement on behalf of the company verifies by its
signature to this Contract that the company does not boycott Israel and will not boycott Israel during the term
of this Contract.
O. Other Items
The Contractor shall sign the Construction Agreement, and deliver signed performance, payment
and maintenance bonds and proper insurance policy endorsements (and/or other evidence of coverage)
within ten (10) calendar days after the Owner makes available to the Contractor copies of the Contract
Documents for signature. Six (6) copies of the Contract Documents shall be signed by an authorized
representative of the Contractor and returned to the Town.
The Construction Agreement "effective date" shall be the date on which the Town Council acts to
approve the award of the Contract for the Work to Contractor. It is expressly provided, however, that the
Town Council delegates the authority to the Town Manager or his designee to rescind the Contract award to
Contractor at any time before the Owner delivers to the Contractor a copy of this Construction Agreement
that bears the signature of the Town Manager and Town Secretary or their authorized designees. The
purpose of this provision is to ensure:
1. that Contractor timely delivers to the Owner all bonds and insurance documents; and
2. that the Owner retains the discretion not to proceed if the Town Manager or his designee
determines that information indicates that the Contractor was not the lowest responsible
Attachment 3
Page 179
Item 12.
BID NO: 2021-03-B
COOK LANE PHASE 1
17
bidder or that the Contractor cannot perform all of its obligations under the Contract
Documents.
THE CONTRACTOR AGREES THAT IT SHALL HAVE NO CLAIM OR CAUSE OF ACTION OF
ANY KIND AGAINST OWNER, INCLUDING A CLAIM FOR BREACH OF CONTRACT, NOR SHALL THE
OWNER BE REQUIRED TO PERFORM UNDER THE CONTRACT DOCUMENTS, UNTIL THE DATE THE
OWNER DELIVERS TO THE CONTRACTOR A COPY OF THE CONSTRUCTION AGREEMENT
BEARING THE SIGNATURES JUST SPECIFIED.
The Contract Documents shall be construed and interpreted by applying Texas law. Exclusive venue
for any litigation concerning the Contract Documents shall be Collin County, Texas.
In the event of any disagreement or conflict concerning the interpretation of this Agreement, and
such disagreement cannot be resolved by the signatories hereto, the signatories agree to submit such
disagreement to non-binding mediation.
Although the Construction Agreement has been drafted by the Owner, should any portion of the
Construction Agreement be disputed, the Owner and Contractor agree that it shall not be construed more
favorably for either party.
The Contract Documents are binding upon the Owner and Contractor and shall insure to their benefit
and as well as that of their respective successors and assigns.
If Town Council approval is not required for the Construction Agreement under applicable law, then
the Construction Agreement "effective date" shall be the date on which the Town Manager and Town
Secretary or their designees have signed the Construction Agreement. If the Town Manager and Town
Secretary sign on different dates, then the later date shall be the effective date.
[Signatures continued on following page.]
Attachment 3
Page 180
Item 12.
BID NO: 2021-03-B
COOK LANE PHASE 1
18
MARIO SINACOLA & SONS EXCAVATING, INC.
TOWN OF PROSPER, TEXAS
By: By: HARLAN JEFFERSON
Title: Title: Town Manager
Date: Date:
Address: 10950 Research Rd.
Frisco, Texas 75033
Phone: (214) 387-3900
Email: sinacolaagtek@mariosinacola.com
Address: 250 W. First St.
P.O. Box 307
Prosper, Texas 75078
Phone: (972) 346-2640
Email: hjefferson@prospertx.gov
ATTEST:
MELISSA LEE
Town Secretary
Attachment 3
Page 181
Item 12.
BID NO: 2021-03-B
COOK LANE PHASE 1
19
PERFORMANCE BOND
STATE OF TEXAS ) )
COUNTY OF COLLIN )
KNOW ALL MEN BY THESE PRESENTS: That __________________ whose address is
__________________________________________________________________________, hereinafter called
Principal, and __________________________________________________________, a corporation organized and
existing under the laws of the State of ______________________________, and fully licensed to transact business in
the State of Texas, as Surety, are held and firmly bound unto the TOWN OF PROSPER, a home-rule municipal
corporation organized and existing under the laws of the State of Texas, hereinafter called “Beneficiary”, in the penal
sum of __________________ Dollars ($____________) plus fifteen percent (15%) of the stated penal sum as an
additional sum of money representing additional court expenses, attorneys’ fees, and liquidated damages arising out
of or connected with the below identified Contract in lawful money of the United States, to be paid in Collin County,
Texas, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators
and successors, jointly and severally, firmly by these presents. The penal sum of this Bond shall automatically be
increased by the amount of any Change Order or Supplemental Agreement, which increases the Contract price, but in
no event shall a Change Order or Supplemental Agreement, which reduces the Contract price, decrease the penal
sum of this Bond.
THE OBLIGATION TO PAY SAME is conditioned as follows: Whereas, the Principal entered into a certain
Contract with the Town of Prosper, the Beneficiary, dated on or about the 13th day of October, A.D. 2020 a copy of
which is attached hereto and made a part hereof, to furnish all materials, equipment, labor, supervision, and other
accessories necessary for the construction of:
BID NO. 2021-03-B
COOK LANE PHASE 1
(BASE BID EXCLUDING LINE ITEM 18, AND ALTERNATE LINE ITEM 52)
in the Town of Prosper, Texas, as more particularly described and designated in the above-referenced
contract such contract being incorporated herein and made a part hereof as fully and to the same extent
as if written herein word for word.
NOW, THEREFORE, if the Principal shall well, truly and faithfully perform and fulfill all of the undertakings,
covenants, terms, conditions and agreements of said Contract in accordance with the Plans, Specifications and
Contract Documents during the original term thereof and any extension thereof which may be granted by the
Beneficiary, with or without notice to the Surety, and during the life of any guaranty or warranty required under this
Contract, and shall also well and truly perform and fulfill all the undertakings, covenants, terms, conditions and
agreements of any and all duly authorized modifications of said Contract that may hereafter be made, notice of which
modifications to the Surety being hereby waived; and, if the Principal shall repair and/or replace all defects due to faulty
materials and workmanship that appear within a period of one (1) year from the date of final completion and final
acceptance of the Work by Owner; and, if the Principal shall fully indemnify and save harmless the Beneficiary from
and against all costs and damages which Beneficiary may suffer by reason of failure to so perform herein and shall
fully reimburse and repay Beneficiary all outlay and expense which the Beneficiary may incur in making good any
default or deficiency, then this obligation shall be void; otherwise, it shall remain in full force and effect.
PROVIDED FURTHER, that if any legal action were filed on this Bond, exclusive Venue shall lie in Collin
County, Texas.
Attachment 3
Page 182
Item 12.
BID NO: 2021-03-B
COOK LANE PHASE 1
20
AND PROVIDED FURTHER, that the said Surety, for value received, hereby stipulates and agrees that no
change, extension of time, alteration or addition to the terms of the Contract or to the Work to be performed thereunder
or the Plans, Specifications and Drawings, etc., accompanying the same shall in anywise affect its obligation on this
Bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the
Contract, or to the Work or to the Specifications.
This Bond is given pursuant to the provisions of Chapter 2253 of the Texas Government Code, and any other
applicable statutes of the State of Texas.
The undersigned and designated agent is hereby designated by the Surety herein as the Resident Agent in
Collin County or Dallas County to whom any requisite notices may be delivered and on whom service of process may
be had in matters arising out of such suretyship, as provided by Article 7.19-1 of the Insurance Code, Vernon’s
Annotated Civil Statutes of the State of Texas.
IN WITNESS WHEREOF, this instrument is executed in two copies, each one of which shall be deemed an
original, this, the ________ day of ________________, 20____.
ATTEST: PRINCIPAL:
___________________________________
Company Name
By: _________________________________ By: ________________________________
Signature Signature
____________________________________ ___________________________________
Typed/Printed Name Typed/Printed Name
____________________________________ ___________________________________
Title Title
____________________________________ ___________________________________
Address Address
____________________________________ ___________________________________
City State Zip City State Zip
___________________________________ ___________________________________
Phone Fax Phone Fax
[Signatures continued on following page.]
Attachment 3
Page 183
Item 12.
BID NO: 2021-03-B
COOK LANE PHASE 1
21
ATTEST: SURETY:
By: _________________________________ By: ________________________________
Signature Signature
____________________________________ ___________________________________
Printed Name Printed Name
____________________________________ ___________________________________
Title Title
____________________________________ ___________________________________
Address Address
____________________________________ ___________________________________
City State Zip City State Zip
___________________________________ ___________________________________
Phone Fax Phone Fax
The Resident Agent of the Surety in Collin County or Dallas County, Texas, for delivery of notice and service of the
process is:
NAME:
STREET ADDRESS:
CITY, STATE, ZIP: NOTE: Date on Page 1 of Performance Bond must be same date as Contract. Date on Page 2 of Performance Bond
must be after date of Contract. If Resident Agent is not a corporation, give a person’s name.
Attachment 3
Page 184
Item 12.
BID NO: 2021-03-B
COOK LANE PHASE 1
22
PAYMENT BOND
STATE OF TEXAS ) )
COUNTY OF COLLIN )
KNOW ALL MEN BY THESE PRESENTS: That __________________ whose address is
____________________________________________________________________________, hereinafter called
Principal, and__________________________________________________________, a corporation organized and
existing under the laws of the State of ______________________________, and fully licensed to transact business in
the State of Texas, as Surety, are held and firmly bound unto the TOWN OF PROSPER, a home-rule municipal
corporation organized and existing under the laws of the State of Texas, hereinafter called “Owner”, and unto all
persons, firms, and corporations who may furnish materials for, or perform labor upon the building or improvements
hereinafter referred to in the penal sum of ___________________________________ DOLLARS
($_______________) (one hundred percent (100%) of the total bid price) in lawful money of the United States, to be
paid in Collin County, Texas, for the payment of which sum well and truly to be made, we bind ourselves, our heirs,
executors, administrators and successors, jointly and severally, firmly by these presents. The penal sum of this Bond
shall automatically be increased by the amount of any Change Order or Supplemental Agreement, which increases
the Contract price, but in no event shall a Change Order or Supplemental Agreement, which reduces the Contract
price, decrease the penal sum of this Bond.
THE OBLIGATION TO PAY SAME is conditioned as follows: Whereas, the Principal entered into a certain Contract
with the Town of Prosper, the Owner, dated on or about the 13th day of October, A.D. 2020, a copy of which is
attached hereto and made a part hereof, to furnish all materials, equipment, labor, supervision, and other
accessories necessary for the construction of:
BID NO. 2021-03-B
COOK LANE PHASE 1
(BASE BID EXCLUDING LINE ITEM 18, AND ALTERNATE LINE ITEM 52)
NOW THEREFORE, if the Principal shall well, truly and faithfully perform its duties and make prompt payment
to all persons, firms, subcontractors, corporations and claimants supplying labor and/or material in the prosecution of
the Work provided for in the above-referenced Contract and any and all duly authorized modifications of said Contract
that may hereafter be made, notice of which modification to the Surety is hereby expressly waived, then this obligation
shall be void; otherwise it shall remain in full force and effect.
PROVIDED FURTHER, that if any legal action were filed on this Bond, exclusive venue shall lie in Collin
County, Texas.
AND PROVIDED FURTHER, that the said Surety, for value received, hereby stipulates and agrees that no
change, extension of time, alteration or addition to the terms of the Contract, or to the Work performed thereunder, or
the Plans, Specifications, Drawings, etc., accompanying the same, shall in anywise affect its obligation on this Bond,
and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the
Contract, or to the Work to be performed thereunder.
This Bond is given pursuant to the provisions of Chapter 2253 of the Texas Government Code, and any other
applicable statutes of the State of Texas.
The undersigned and designated agent is hereby designated by the Surety herein as the Resident Agent in
Collin County or Dallas County to whom any requisite notices may be delivered and on whom service of process may
Attachment 3
Page 185
Item 12.
BID NO: 2021-03-B
COOK LANE PHASE 1
23
be had in matters arising out of such suretyship, as provided by Article 7.19-1 of the Insurance Code, Vernon’s
Annotated Civil Statutes of the State of Texas.
IN WITNESS WHEREOF, this instrument is executed in two copies, each one of which shall be deemed an original,
this, the _______ day of _________________, 20___.
ATTEST: PRINCIPAL:
___________________________________
Company Name
By: _________________________________ By: ________________________________
Signature Signature
____________________________________ ___________________________________
Typed/Printed Name Typed/Printed Name
____________________________________ ___________________________________
Title Title
____________________________________ ___________________________________
Address Address
____________________________________ ___________________________________
City State Zip City State Zip
___________________________________ ___________________________________
Phone Fax Phone Fax
[Signatures continued on following page.]
Attachment 3
Page 186
Item 12.
BID NO: 2021-03-B
COOK LANE PHASE 1
24
ATTEST: SURETY:
By: _________________________________ By: ________________________________
Signature Signature
____________________________________ ___________________________________
Printed Name Printed Name
____________________________________ ___________________________________
Title Title
____________________________________ ___________________________________
Address Address
____________________________________ ___________________________________
City State Zip City State Zip
___________________________________ ___________________________________
Phone Fax Phone Fax
The Resident Agent of the Surety in Collin County or Dallas County, Texas, for delivery of notice and service of the
process is:
NAME:
STREET ADDRESS:
CITY, STATE, ZIP:
NOTE: Date on Page 1 of Performance Bond must be same date as Contract. Date on Page 2 of Performance Bond
must be after date of Contract. If Resident Agent is not a corporation, give a person’s name.
Attachment 3
Page 187
Item 12.
BID NO: 2021-03-B
COOK LANE PHASE 1
25
MAINTENANCE BOND
STATE OF TEXAS ) )
COUNTY OF COLLIN )
KNOW ALL MEN BY THESE PRESENTS: That _______________________________ whose address
is________________________________________________, hereinafter referred to as “Principal,” and
___________________________________, a corporate surety/sureties organized under the laws of the State of
____________ and fully licensed to transact business in the State of Texas, as Surety, hereinafter referred to as
“Surety” (whether one or more), are held and firmly bound unto the TOWN OF PROSPER, a Texas municipal
corporation, hereinafter referred to as “Owner,” in the penal sum of ___________________________________
DOLLARS ($_______________) (one hundred percent (100%) of the total bid price), in lawful money of the United
States to be paid to Owner, its successors and assigns, for the payment of which sum well and truly to be made, we
bind ourselves, our successors, heirs, executors, administrators and successors and assigns, jointly and severally; and
firmly by these presents, the condition of this obligation is such that:
WHEREAS, Principal entered into a certain written Contract with the Town of Prosper, dated on or about the 13th day of October, 2020, to furnish all permits, licenses, bonds, insurance, products, materials, equipment, labor, supervision, and other accessories necessary for the construction of:
BID NO. 2021-03-B
COOK LANE PHASE 1 (BASE BID EXCLUDING LINE ITEM 18, AND ALTERNATE LINE ITEM 52)
in the Town of Prosper, Texas, as more particularly described and designated in the above-referenced contract, such
contract being incorporated herein and made a part hereof as fully and to the same extent as if written herein word for
word:
WHEREAS, in said Contract, the Principal binds itself to use first class materials and workmanship and of
such kind and quality that for a period of two (2) years from the completion and final acceptance of the improvements
by Owner the said improvements shall require no repairs, the necessity for which shall be occasioned by defects in
workmanship or materials and during the period of two (2) years following the date of final acceptance of the Work by
Owner, Principal binds itself to repair or reconstruct said improvements in whole or in part at any time within said period
of time from the date of such notice as the Town Manager or his designee shall determine to be necessary for the
preservation of the public health, safety or welfare. If Principal does not repair or reconstruct the improvements within
the time period designated, Owner shall be entitled to have said repairs made and charge Principal and/or Surety the
cost of same under the terms of this Maintenance Bond.
NOW, THEREFORE, if Principal will maintain and keep in good repair the Work herein contracted to be done
and performed for a period of two (2) years from the date of final acceptance and do and perform all necessary work
and repair any defective condition (it being understood that the purpose of this section is to cover all defective conditions
arising by reason of defective materials, work or labor performed by Principal) then this obligation shall be void;
otherwise it shall remain in full force and effect and Owner shall have and recover from Principal and its Surety damages
in the premises as provided in the Plans and Specifications and Contract.
PROVIDED, however, that Principal hereby holds harmless and indemnifies Owner from and against
any claim or liability for personal injury or property damage caused by and occurring during the performance of said maintenance and repair operation.
Attachment 3
Page 188
Item 12.
BID NO: 2021-03-B
COOK LANE PHASE 1
26
PROVIDED, further, that if any legal action be filed on this Bond, exclusive venue shall lie in Collin County,
Texas.
AND PROVIDED FURTHER, Surety, for value received, hereby stipulates and agrees that no change,
extension of time, alteration or addition to the terms of the Contract or to the Work performed thereunder, or the Plans,
Specifications, Drawings, etc. accompanying same shall in any way affect its obligation on this Bond; and it does hereby
waive notice of any such change, extension of time, alteration or addition to the terms of the Contract or to the Work to
be performed thereunder.
The undersigned and designated agent is hereby designated by Surety as the resident agent in either Collin
or Dallas Counties to whom all requisite notice may be delivered and on whom service of process may be had in
matters arising out of this suretyship.
IN WITNESS WHEREOF, this instrument is executed in two copies, each one of which shall be deemed an original,
on this the _____ day of ____________, 20____.
ATTEST: PRINCIPAL:
___________________________________
Company Name
By: _________________________________ By: ________________________________
Signature Signature
____________________________________ ___________________________________
Typed/Printed Name Typed/Printed Name
____________________________________ ___________________________________
Title Title
____________________________________ ___________________________________
Address Address
____________________________________ ___________________________________
City State Zip City State Zip
___________________________________ ___________________________________
Phone Fax Phone Fax
[Signatures continued on following page.]
Attachment 3
Page 189
Item 12.
BID NO: 2021-03-B
COOK LANE PHASE 1
27
ATTEST: SURETY:
By: _________________________________ By: ________________________________
Signature Signature
____________________________________ ___________________________________
Printed Name Printed Name
____________________________________ ___________________________________
Title Title
____________________________________ ___________________________________
Address Address
____________________________________ ___________________________________
City State Zip City State Zip
___________________________________ ___________________________________
Phone Fax Phone Fax
Attachment 3
Page 190
Item 12.
BID NO: 2021-03-B
COOK LANE PHASE 1
28
SPECIAL CONDITIONS
SC.01 PURPOSE: The Special Conditions contained herein set forth conditions or requirements particular to this
Contract: BID NO. 2021-03-B COOK LANE PHASE 1
The Special Conditions supplement the General Conditions and the Standard Specifications and take
precedence over any conditions or requirements of the General Conditions and the Standard Specifications
with which they are in conflict.
SC.02 DEFINITIONS: The following words and expressions, or pronouns used in their place, shall wherever they
appear in this Contract, be construed as follows, unless a different meaning is clear from the context:
• ENGINEER: The Engineer of Record as shown on the Construction Drawings:
Roadway Plans: Jake Bennett, P.E. – Garver
Water Plans: Daniel Heischman, P.E. – Town of Prosper
SC.03 MINIMUM STANDARDS OF RESPONSBILITY: A prospective vendor must affirmatively demonstrate
responsibility. The Town of Prosper may request representation and other information sufficient to determine
respondent’s ability to meet the minimum standards, including but not limited to:
A. Have adequate financial resources, or the ability to obtain such resources as required;
B. Have a satisfactory record of performance on a minimum of three (3) completed projects of similar scope,
quantities, and cost, within the past five (5) years;
C. Ability to comply with the required or proposed delivery schedule;
D. Have a satisfactory record of integrity and ethics; and
E. Be otherwise qualified and eligible to receive an award.
SC.04 BID AWARD: The award shall be based on the lowest responsive and responsible bidder taking into
consideration the number of days bid to complete the project.
A. For the purpose of award, each bid submitted shall consist of:
1. Base Bid (A) = The correct summation of the products and the quantities shown in the bid proposal,
multiplied by the bid unit prices.
2. Time Bid (B) = (CD x Daily Value). The product of the total number of calendar days (CD) provided
by the Contractor to complete the project and the daily value established in SC.04 B.
3. Total Bid = Base Bid (A) + Time Bid (B). The lowest Total Bid will be determined by the Town as the
lowest sum of the Base Bid (A) + the Time Bid (B).
Note: The dollar value of the Time Bid (B) will be used for evaluation purposes only, and will not be
included in the contract award. However, the successful Contractor will be responsible for
completing construction within the number of calendar days bid.
B. Contractor will enter the number of days to complete the project in the appropriate section of the
Bid Attributes. The Town will calculate the Time Bid using the number of days bid by Contractor, and
the corresponding value of a calendar day indicated in the matrix below, based on total of Contractor’s
Base Bid (A). The Town reserves the right to set a maximum value to the total number of days.
Attachment 3
Page 191
Item 12.
BID NO: 2021-03-B
COOK LANE PHASE 1
29
Amount of Contract ($) Value of a Calendar Day ($)
$1,500,000 to $1,999,999.99 $500 per day
$2,000,000 to $2,999,999.99 $1,000 per day
$3,000,000 to $3,999,999.99 $1,500 per day
More than $4,000,000.00 $2,000 per day
SC.05 SUBMITTALS: In order for your bid to be considered responsive, the following information should be
submitted:
A. Respond to all Bid Items listed for this project.
B. Respond to all Bid Attributes listed for this project.
C. Submit Bid Guarantee (Bid Bond or Cashier’s Check)
D. Complete and submit the Completed Projects and References Worksheet.
E. Submit resumes for key personnel that will be assigned to the project (executive and management team,
as well as on-site project manager).
F. Submit a copy of an actual project schedule used during construction.
SC.06 SUBMISSION OR DELIVERY OF BID: Bids for the construction services specified will be received online,
or in hard copy. The date/time stamp located in the Purchasing Office serves as the official time clock. Late
Submissions will not be considered. Submissions received after the stated deadline shall be refused and
returned unopened. The Town of Prosper is not responsible for issues encountered with methods of delivery.
A. Online Submission
Bids may be submitted online through IonWave.net, the Town’s e-procurement system. Please
ensure that you provide all required information, including attachments. Any additional response
attachments must be uploaded and included with your submission in order to be considered.
B. Mailed/Delivered Submission
Bids must be submitted with the BID number and the respondent’s name and address clearly
indicated on the front of the envelope. Please submit one (1) unbound original and one (1) copy of
your bid, in a sealed envelope or package to the address listed below:
Delivery Address:
Town of Prosper
Attn: Purchasing Manager
250 W. First St.
3rd Floor Finance Suite
Prosper, Texas 75078
Mailing Address (US Postal Service Only):
Town of Prosper
Attn: Purchasing Manager
P.O. Box 307
Prosper, Texas 75078
Attachment 3
Page 192
Item 12.
BID NO: 2021-03-B
COOK LANE PHASE 1
30
TECHNICAL SPECIFICATIONS
TS.01 Bidders are specifically directed to become thoroughly familiar with the following standard
specifications, in order of precedence, that shall apply to this project unless otherwise noted in the Bidding
Documents:
1. Town of Prosper Standards
2. The North Central Texas Council of Governments’ (NCTCOG) Standard Specifications for Public
Works Construction, Fifth Edition, dated November 2017.
3. Texas Department of Transportation (TXDOT) Standard Specifications for Construction and
Maintenance of Highways, Streets, and Bridges, dated November 2014.
Please reference the Construction Plans for all other technical specifications
Attachment 3
Page 193
Item 12.
BID NO: 2021-03-B
COOK LANE PHASE 1
31
Attachment 3
Page 194
Item 12.
2021-03-B Addendum 3
Mario Sinacola & Sons Excavating, Inc.
Supplier Response
Event Information
Number:2021-03-B Addendum 3
Title:Cook Lane Phase 1
Type:Request for Bids
Issue Date:8/24/2020
Deadline:9/16/2020 02:00 PM (CT)
Notes:ENGINEER'S ESTIMATE: $2,362,161
The Town of Prosper is accepting competitive sealed bids for BID
NO. 2021-03-B COOK LANE PHASE 1. Bids will be accepted
online through IonWave.net, the Town’s e-procurement system, or in
hard copy in the Purchasing Office located in the 3rd Floor Finance
Suite of Town Hall, 250 W. First St., Prosper, Texas 75078 until 2:00
P.M. on, Monday, September 14,2020. Any bids received after this
time will not be accepted, and will be returned unopened. The bid
opening will be held online on Monday, September 14, 2020 @
2:30 P.M.
The Project consists of furnishing all labor, equipment and materials (except as
otherwise specified), and performing all work necessary for the construction of Grading,
Paving, Drainage, and Utility Improvements for Cook Lane Phase 1.
Each bid submitted shall be accompanied by a cashier's check in the amount of 5% of
the maximum amount bid, payable without recourse to the Town of Prosper, or a Bid
Bond in the same amount from a reliable surety company as a guarantee that, if
awarded the contract, the successful Contractor will execute a Construction Agreement
Page 1 of 12 pages Vendor: Mario Sinacola & Sons Excavating, Inc.2021-03-B Addendum 3
Attachment 3
Page 195
Item 12.
with the Town, including all required bonds and other documents.
The successful Contractor shall furnish a Performance Bond in the amount of 115% of
the contract amount, and a Payment Bond in the amount of 100% of the contract amount,
as well as evidence of all required insurance coverage within ten (10) calendar days of
notice of award. The successful Contractor shall also furnish a Maintenance Bond in the
amount of 100% of the contract amount covering defects of material and workmanship
for two calendar years following the Town's approval and acceptance of the construction.
An approved surety company, licensed in the State of Texas, shall issue all bonds in
accordance with Texas law.
Copies of Plans, Specifications, and Contract Documents may be examined at Town of
Prosper Engineering Department, 250 W. First Street, Prosper, Texas, 75078, Phone:
(972) 569-1198 without charge. These documents may be acquired from that office for
the non-refundable purchase price of $50.00 per set, payable to the Town of Prosper.
Copies of Plans, Specifications, and Contract Documents may also be downloaded free
of charge from Current Bidding Opportunities, at the following link:
http://www.prospertx.gov/business/bid-opportunities/.
Questions and requests for clarifications in regards to this bid should be submitted in
writing through IonWave.net, the Town’s e-procurement system, or emailed directly to
January Cook, CPPO, CPPB, Purchasing Manager, at jcook@prospertx.gov. The
deadline for receipt of questions and requests for clarifications is 12:00 P.M. on
Wednesday, September 9, 2020. After that day and time, no further questions or
requests for clarifications will be accepted or answered by the Engineer or Town.
If you are downloading plans, please complete and submit the Planholder Registration
Form in order to be placed on the official Planholder List.
Contact Information
Contact:January Cook Purchasing Manager
Address:Purchasing Office
Town Hall
3rd Floor
250 W. First St.
P.O. Box 307
Prosper, TX 75078
Phone:(972) 569-1018
Email:jcook@prospertx.gov
Page 2 of 12 pages Vendor: Mario Sinacola & Sons Excavating, Inc.2021-03-B Addendum 3
Attachment 3
Page 196
Item 12.
Mario Sinacola & Sons Excavating, Inc. Information
Address:10950 Research Road
Frisco, TX 75033
Phone:(214) 387-3900
Fax:(214) 387-3940
Toll Free:(214) 387-3900
Email:sinacolaagtek@mariosinacola.com
By submitting your response, you certify that you are authorized to represent and bind your company.
Harlan Jones HJones@MarioSinacola.Com
Signature Email
Submitted at 9/16/2020 1:03:05 PM
Requested Attachments
Bid Bond 2020.09.16 - Executed Bid Bond Cook Lane.pdf
Completed Projects and References Worksheet 2020.09.14 - CIP References Worksheet.pdf
Resumes for Key Personnel 2020.09.14 - Resumes for Key Personnel.pdf
Submit resumes for key personnel that will be assigned to the project (executive and management team,
as well as on-site project manager).
Project Schedule Previous Project Schedule.pdf
Submit a sample/copy of an actual project schedule previously used during construction for a similar project.
Conflict of Interest Questionnaire 2020.09.14 - Conflict of Interest (HJ).pdf
Only if applicable
Out of State Contractor Compliance Form 2020.09.16 - Out_of_State_Contractor_Compliance_(HJ).pdf
Only if applicable
Response Attachments
2020.09.16 - List of Subcontractors.pdf
Subcontractors and Suppliers
Bid Attributes
1 Bid Proposal Condition No. 1
The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an agreement with Owner in the
form included in the Contract Documents to perform and furnish all Work as specified or indicated in the Contract
Documents for the Contract Price and within the Contract Time indicated in this Bid and in accordance with the
other terms and conditions of the Contract Documents.
I Agree
Page 3 of 12 pages Vendor: Mario Sinacola & Sons Excavating, Inc.2021-03-B Addendum 3
Attachment 3
Page 197
Item 12.
2 Bid Proposal Condition No. 2
Bidder accepts all of the terms and conditions of the Advertisement or Invitation to Bid and Instructions to Bidders,
including without limitation those terms and conditions dealing with the disposition of Bid guaranty. This Bid will
remain subject to acceptance for 90 calendar days after the day of opening Bids. Bidder will sign and submit the
Agreement with the Bonds and other documents required by the Contract Documents within ten (10) calendar days
after the date of Owner's Notice of Award.
I Agree
3 Bid Proposal Condition No. 3
The right is reserved, as the interest of the Owner may require, to reject any and all Bids and to waive any
informality in the Bids received.
I Agree
4 Bid Proposal Condition No. 4
Bidder has familiarized itself with the nature and extent of the Contract Documents, Work, site, locality, and all local
conditions and Laws and Regulations that in any manner may affect cost, progress, performance or furnishing of
the Work.
I Agree
5 Bid Proposal Condition No. 5
Bidder has obtained and carefully studied (or assumes responsibility for obtaining and carefully studying) all such
examinations, investigations, explorations, tests and studies that pertain to the subsurface or physical conditions at
the site or which otherwise may affect the cost, progress, performance or furnishing of the Work as Bidder
considers necessary for the performance or furnishing of the Work at the Contract Price, within the Contract Time
and in accordance with the other terms and conditions of the Contract Documents, and no additional examinations,
investigations, explorations, tests, reports or similar information or data are or will be required by Bidder for such
purposes.
I Agree
6 Bid Proposal Condition No. 6
Bidder has reviewed and checked all information and data shown or indicated on the Contract Documents with
respect to existing Underground Facilities at or contiguous to the site and assumes responsibility for the accurate
location of said Underground Facilities. No additional examinations, investigations, explorations, tests, reports or
similar information or data in respect of said Underground Facilities are or will be required by the Bidder in order to
perform and furnish the Work at the Contract Price, within the Contract Time and in accordance with the other terms
and conditions of the Contract Documents.
I Agree
7 Bid Proposal Condition No. 7
Bidder has correlated the results of all such observations, examinations, investigations, explorations, tests, reports
and studies with the terms and conditions of the Contract Documents.
I Agree
8 Bid Proposal Condition No. 8
Bidder has given Engineer written notice of all conflicts, errors or discrepancies that it has discovered, if any, in the
Contract Documents and the written resolution thereof by Engineer is acceptable to Bidder.
I Agree
Page 4 of 12 pages Vendor: Mario Sinacola & Sons Excavating, Inc.2021-03-B Addendum 3
Attachment 3
Page 198
Item 12.
9 Bid Proposal Condition No. 9
This Bid is genuine and not made in the interest of or on behalf of any undisclosed person, firm or corporation and
is not submitted in conformity with any agreement or rules of any group, association, organization or corporation;
Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid; Bidder has
not solicited or induced any person, firm or corporation to refrain from submitting a Bid; and Bidder has not sought
by collusion to obtain for itself any advantage over any other Bidder or over Owner.
I Agree
1
0
Bid Proposal Condition No. 10
Bidder will substantially complete the Work for the price(s) shown in the schedule of bid items and within the
number of calendar days bid based on date of Notice to Proceed.
I Agree
1
1
Bid Proposal Condition No. 11
Bidder hereby agrees to commence work within ten (10) days after the date written notice to proceed shall have
been given to him, and to substantially complete the work within the number of calendar days bid as part of this
Proposal. Within 30 additional calendar days after Substantial Completion, all outstanding issues shall be
addressed and ready for final payment. All such time restrictions are subject to such extensions of time as are
provided by the General Provisions and Special Conditions.
I Agree
1
2
Bid Proposal Condition No. 12
Bidder agrees that the implementation of the Owner’s right to delete any portion of the improvements shall not be
considered as waiving or invalidating any conditions or provisions of the contract or bonds. Bidder shall perform
the Work as altered and no allowances shall be made for anticipated profits.
I Agree
1
3
Bid Proposal Condition No. 13
Since the Work on this Project is being performed for a governmental body and function, the Owner will issue to the
Contractor a certificate of exemption for payment for the State Sales TAX on materials incorporated into this Project
if requested.
I Agree
1
4
Bid Proposal Condition No. 14
In the event of the award of a contract, vendor will furnish a Performance Bond for 115% of the contract amount,
and a Payment Bond for 100% of the contract amount, to secure proper compliance with the terms and provisions
of the contract with sureties offered by surety company named in the space provided,to insure and guarantee the
work until final completion and acceptance, and to guarantee payment of all lawful claims for labor performed and
materials furnished in the fulfillment of the contract. In addition, the undersigned will furnish a Maintenance
Bond for 100% of the contract amount covering defects of material and workmanship for two calendar
years following the Owner's approval and acceptance of the construction.
I Agree
1
5
Bid Proposal Condition No. 15
The work, proposed to be done, shall be accepted when fully completed in accordance with the plans and
specifications, to the satisfaction of the Engineer and the Owner.
I Agree
Page 5 of 12 pages Vendor: Mario Sinacola & Sons Excavating, Inc.2021-03-B Addendum 3
Attachment 3
Page 199
Item 12.
1
6
Bid Proposal Condition No. 16
The vendor submitting this Bid certifies that the bid prices contained in this Bid have been carefully checked and
are submitted as correct and final.
I Agree
1
7
Base Bid
Cost of Materials
$760000.00
1
8
Base Bid
Cost of Labor, Profit, etc.
$1162564.50
1
9
Addendum No. 1
Bidder has examined copies of all the Contract Documents and of the following Addenda (if issued)
Acknowledged
2
0
Addendum No. 2
Bidder has examined copies of all the Contract Documents and of the following Addenda (if issued)
Acknowledged
2
1
Addendum No. 3
Bidder has examined copies of all the Contract Documents and of the following Addenda (if issued)
Acknowledged
2
2
Addendum No. 4
Bidder has examined copies of all the Contract Documents and of the following Addenda (if issued)
No response
2
3
Addendum No. 5
Bidder has examined copies of all the Contract Documents and of the following Addenda (if issued)
No response
2
4
Subcontractor 1 - Name
Each Bidder shall include a list of proposed subcontractors, the type of work to be completed by each such
subcontractor and the approximate percentage of contract labor to be completed by each subcontractor. If
complete listing of subcontracts totals more than five, please attach such additional pages as may be
required. Owner reserves the right to accept or reject any subcontracts and/or amount subcontracted that it deems
to be objectionable.
See attached
2
5
Subcontractor 1 - Type of Work
No response
2
6
Subcontractor 1 - % of Work
No response
Page 6 of 12 pages Vendor: Mario Sinacola & Sons Excavating, Inc.2021-03-B Addendum 3
Attachment 3
Page 200
Item 12.
2
7
Subcontractor 2 - Name
No response
2
8
Subcontractor 2 - Type of Work
No response
2
9
Subcontractor 2 - % of Work
No response
3
0
Subcontractor 3 - Name
No response
3
1
Subcontractor 3 - Type of Work
No response
3
2
Subcontractor 3 - % of Work
No response
3
3
Subcontractor 4 - Name
No response
3
4
Subcontractor 4 - Type of Work
Concrete Storm Structure
3
5
Subcontractor 4 - % of Work
No response
3
6
Subcontractor 5 - Name
No response
3
7
Subcontractor 5 - Type of Work
No response
3
8
Subcontractor 5 - % of Work
No response
3
9
Supplier 1 - Name
Each Bidder shall include a list of proposed suppliers of major materials and equipment to be furnished and
installed in connection with this Bid. If complete listing of suppliers totals more than five, please attach such
additional pages as may be required.
See Attached
4
0
Supplier 1 - Type of Material/Equipment
No response
4
1
Supplier 2 - Name
No response
Page 7 of 12 pages Vendor: Mario Sinacola & Sons Excavating, Inc.2021-03-B Addendum 3
Attachment 3
Page 201
Item 12.
4
2
Supplier 2 - Type of Material/Equipment
No response
4
3
Supplier 3 - Name
No response
4
4
Supplier 3 - Type of Material/Equipment
No response
4
5
Supplier 4 - Name
No response
4
6
Supplier 4 - Type of Material/Equipment
No response
4
7
Supplier 5 - Name
No response
4
8
Supplier 5 - Type of Material/Equipment
No response
4
9
Project Timeline: Substantial Completion
Provide number of days to reach substantial completion of all construction
130
5
0
Project Timeline: Final Completion
Provide number of additional days after Substantial Completion to reach final completion of all construction
20
Bid Lines
1 MOBILIZATION (5%)
Quantity:1 UOM:LS Unit Price:$95,000.00 Total:$95,000.00
2 VIDEOTAPE PROJECT AREA
Quantity:1 UOM:LS Unit Price:$1,000.00 Total:$1,000.00
3 BARRICADES & TRAFFIC CONTROL
Quantity:1 UOM:LS Unit Price:$5,500.00 Total:$5,500.00
4 IMPLEMENTATION OF STORM WATER POLLUTION PREVENTION PLAN (2%)
Quantity:1 UOM:LS Unit Price:$1,500.00 Total:$1,500.00
5 PREPARING ROW
Quantity:3.8 UOM:AC Unit Price:$4,500.00 Total:$17,100.00
Page 8 of 12 pages Vendor: Mario Sinacola & Sons Excavating, Inc.2021-03-B Addendum 3
Attachment 3
Page 202
Item 12.
6 UNCLASSIFIED EXCAVATION
Quantity:10800 UOM:CY Unit Price:$4.00 Total:$43,200.00
7 EMBANKMENT (PLAN QUANTITY)
Quantity:6000 UOM:CY Unit Price:$1.00 Total:$6,000.00
8 ADJUST EXIST SSMH TO FINAL GRADE (INCL VENTABLE LID)
Quantity:1 UOM:EA Unit Price:$2,000.00 Total:$2,000.00
9 LIME TREAT SUBGRADE (8 inch)
Quantity:10440 UOM:SY Unit Price:$4.00 Total:$41,760.00
1
0
LIME TREAT SUBGRADE (6 inch) - DRIVEWAY
Quantity:160 UOM:SY Unit Price:$4.00 Total:$640.00
1
1
HYDRATED LIME (8%)
Quantity:290 UOM:TON Unit Price:$170.00 Total:$49,300.00
1
2
7 inch REINF. CONCRETE PAVEMENT
Quantity:9480 UOM:SY Unit Price:$45.00 Total:$426,600.00
1
3
6 inch INTEGRAL CONCRETE CURB
Quantity:4570 UOM:LF Unit Price:$1.00 Total:$4,570.00
1
4
DRIVEWAY PAVING (6 inch CONC, 3500 PSI, #4 BARS ON 24 inch OCEW) incl. 6 inch MONO CURB
Quantity:140 UOM:SY Unit Price:$80.00 Total:$11,200.00
1
5
CONSTRUCT ASPHALT DRIVE (2 inch HMAC TY D W/ 6 inch FLEX BASE TY D GR 1-2)
Quantity:260 UOM:SY Unit Price:$90.00 Total:$23,400.00
1
6
WINGWALL (PW - 1) (HW=10 FT)
Quantity:2 UOM:EA Unit Price:$52,000.00 Total:$104,000.00
1
7
RAIL (TY PR11) (PAINTED PROSPER BROWN)
Quantity:240 UOM:LF Unit Price:$100.00 Total:$24,000.00
1
8
INSTALL 4-12 ft X 4 ft MBC INCL CONNECTIONS
Quantity:220 UOM:LF Unit Price:$825.00 Total:$181,500.00
1
9
RIPRAP (STONE COMMON) (DRY) (18 inch)
Quantity:700 UOM:CY Unit Price:$116.00 Total:$81,200.00
2
0
SET (TY I)(S= 5 FT)(HW= 6 FT)(3:1) (P)
Quantity:2 UOM:EA Unit Price:$18,750.00 Total:$37,500.00
2
1
INSTALL 2-5 ft X 4ft MBC INCL CONNECTIONS
Quantity:270 UOM:LF Unit Price:$360.00 Total:$97,200.00
Page 9 of 12 pages Vendor: Mario Sinacola & Sons Excavating, Inc.2021-03-B Addendum 3
Attachment 3
Page 203
Item 12.
2
2
CONSTRUCT 5 ft RECESSED INLET
Quantity:10 UOM:EA Unit Price:$3,900.00 Total:$39,000.00
2
3
INSTALL 18 inch RCP INCL CONNECTIONS
Quantity:860 UOM:LF Unit Price:$60.00 Total:$51,600.00
2
4
INSTALL 21 inch RCP INCL CONNECTIONS
Quantity:290 UOM:LF Unit Price:$62.00 Total:$17,980.00
2
5
INSTALL 24 inch RCP INCL CONNECTIONS
Quantity:70 UOM:LF Unit Price:$67.00 Total:$4,690.00
2
6
INSTALL 36 inch RCP INCL CONNECTIONS
Quantity:60 UOM:LF Unit Price:$127.00 Total:$7,620.00
2
7
INSTALL 42 inch RCP INCL CONNECTIONS
Quantity:530 UOM:LF Unit Price:$153.00 Total:$81,090.00
2
8
TRENCH PROTECTION (Storm Drain)
Quantity:1800 UOM:LF Unit Price:$1.00 Total:$1,800.00
2
9
STORM DRAIN MH (4 ftX4 ft)
Quantity:1 UOM:EA Unit Price:$5,825.00 Total:$5,825.00
3
0
STORM DRAIN MH (5 ftX5 ft)
Quantity:1 UOM:EA Unit Price:$6,400.00 Total:$6,400.00
3
1
WYE INLET (4 ftX4 ft) (INCL 4 inch CONC APRON)
Quantity:1 UOM:EA Unit Price:$4,725.00 Total:$4,725.00
3
2
DEWATERING
Quantity:1 UOM:AL Unit Price:$10,000.00 Total:$10,000.00
3
3
INSTALL PROPOSED SIGN
Quantity:6 UOM:EA Unit Price:$500.00 Total:$3,000.00
3
4
24 inch WHITE THERMOPLASTIC STRIPE (INCL PREP & SEAL)
Quantity:20 UOM:LF Unit Price:$30.00 Total:$600.00
3
5
BLOCK SODDING
Quantity:5930 UOM:SY Unit Price:$3.00 Total:$17,790.00
3
6
VEGETATIVE WATERING
Quantity:780 UOM:MG Unit Price:$10.00 Total:$7,800.00
3
7
INLET PROTECTION DEVICES
Quantity:11 UOM:EA Unit Price:$145.00 Total:$1,595.00
Page 10 of 12 pages Vendor: Mario Sinacola & Sons Excavating, Inc.2021-03-B Addendum 3
Attachment 3
Page 204
Item 12.
3
8
ROCK FILTER DAM (TY 2) - (INSTALL/MAINTAIN/REMOVE)
Quantity:210 UOM:LF Unit Price:$30.00 Total:$6,300.00
3
9
SILT FENCE - (INSTALL/MAINTAIN/REMOVE)
Quantity:6760 UOM:LF Unit Price:$1.75 Total:$11,830.00
4
0
CONSTRUCTION ENTRANCE - (INSTALL/MAINTAIN/REMOVE)
Quantity:2 UOM:EA Unit Price:$2,500.00 Total:$5,000.00
4
1
HYDRO-MULCH
Quantity:12900 UOM:SY Unit Price:$0.65 Total:$8,385.00
4
2
12 inch PVC DR-18
Quantity:2470 UOM:LF Unit Price:$52.85 Total:$130,539.50
4
3
6 inch GATE VALVE
Quantity:5 UOM:EA Unit Price:$1,025.00 Total:$5,125.00
4
4
12 inch GATE VALVE
Quantity:8 UOM:EA Unit Price:$2,275.00 Total:$18,200.00
4
5
FIRE HYDRANT ASSEMBLY FURNISH AND INSTALL
Quantity:5 UOM:EA Unit Price:$5,000.00 Total:$25,000.00
4
6
DUCTILE IRON FITTINGS
Quantity:3.5 UOM:TON Unit Price:$500.00 Total:$1,750.00
4
7
CONCRETE ENCASEMENT 2000 PSI FURNISH AND INSTALL
Quantity:60 UOM:LF Unit Price:$60.00 Total:$3,600.00
4
8
CONNECT TO EXISTING 12 INCH WATER
Quantity:2 UOM:LS Unit Price:$3,850.00 Total:$7,700.00
4
9
TRENCH SAFETY (WATER LINE)
Quantity:2270 UOM:LF Unit Price:$5.00 Total:$11,350.00
5
0
WATER TESTING
Quantity:1 UOM:LS Unit Price:$1,750.00 Total:$1,750.00
5
1
CIP PROJECT SIGN
Quantity:1 UOM:EA Unit Price:$1,500.00 Total:$1,500.00
5
2
10 ft x 4 ft CIP culvert, complete in place (alternate to Bid Item 18)
Quantity:275 UOM:LF Unit Price:$550.00 Total:$151,250.00
5
3
42 Inch CMP
Quantity:160 UOM:LF Unit Price:$110.00 Total:$17,600.00
Page 11 of 12 pages Vendor: Mario Sinacola & Sons Excavating, Inc.2021-03-B Addendum 3
Attachment 3
Page 205
Item 12.
Response Total: $1,922,564.50
Page 12 of 12 pages Vendor: Mario Sinacola & Sons Excavating, Inc.2021-03-B Addendum 3
Attachment 3
Page 206
Item 12.
Attachment 3
Page 207
Item 12.
Attachment 3
Page 208
Item 12.
Attachment 3
Page 209
Item 12.
Attachment 3
Page 210
Item 12.