Loading...
08-058 - RTOWN OF PROSPER, TEXAS RESOLUTION NO. 08-058 A RESOLUTION OF THE TOWN COUNCIL OF THE TOWN OF PROSPER, TEXAS, HEREBY AUTHORIZING THE TOWN MANAGER OF THE TOWN OF PROSPER, TEXAS, TO EXECUTE AN INTERLOCAL DEVELOPMENT AGREEMENT REGARDING THE REIMBURSEMENT OF VARIOUS CONSTRUCTION COSTS TO THE PROSPER INDEPENDENT SCHOOL DISTRICT (PISD) FOR THE DEVELOPMENT OF THE PROSPER HIGH SCHOOL, BY AND BETWEEN THE PISD AND THE TOWN OF PROSPER. NOW, THEREFORE, BE IT RESOLVED BY THE TOWN COUNCIL OF THE TOWN OF PROSPER, TEXAS: SECTION 1: The Town Manager of the Town of Prosper, Texas, is hereby authorized to execute, on behalf of the Town Council of the Town of Prosper, Texas, an Interlocal Development Agreement regarding the reimbursement of various construction costs to the Prosper Independent School District (PISD) for the development of the Prosper High School, by and between the PISD and the Town of Prosper, as hereto attached. SECTION 2: This Resolution shall take effect immediately upon its passage. RESOLVED THIS THE 22" d day of July, 2008. harles 14iswanger, Mayor ATTEST TO: f% Denton, Town Secretary b5 0� 05 s ld 7-6 : - i ow m or= P05f6R- I I I I II IIII I I011100 w 3(P� 1' r''' 0 03:35:12 R1 AG 1/ 23 ff,t�—Pa, -Tyc 1 l6J, rDG� INTERLOCAL DEVELOPMENT AGREEMENT This Interlocal Development Agreement ("Agreement") is made and entered into this �-2- day of S k t- `e , 2008, by and between the Town of Prosper, Texas, a municipal corporation organized under the laws of the State of Texas ("Town"), with the authorization of its governing body, and the Prosper Independent School District, a political subdivision of the State of Texas ("PISD"), with the authorization of its governing body (collectively referred to as the "Parries"). WHEREAS, the PISD executed a Professional Services Agreement with PBK to complete design, bid package preparation and construction documents for the Prosper High School, located at the southeast corner of Frontier Parkway and the Burlington Northern Santa Fe Railroad (BNSF), and upon completion of design solicit bids and construct the Improvements. WHEREAS, the Parties recognize the public interest of jointly developing the design and construction of the Improvements as set forth herein; and WHEREAS, pursuant to the authority of the Interlocal Cooperation Act, Town and PISD are political subdivisions of the State of Texas having the authority to contract and agree to perform governmental functions and services; and WHEREAS, the Parties acknowledge that they have the authority to enter into this Agreement and to perform the obligations of each governmental entity pursuant to this Agreement; and WHEREAS, the Parties further acknowledge that §791.026 and §791.028 of the Interlocal Cooperation Act specifically authorizes local governments to contract with one another to pay jointly all or part of the costs of water, wastewater and roadway projects; and WHEREAS, the Parties have investigated and determined that Projects A and B are water and wastewater projects as contemplated by §791.026 of the Interlocal Cooperation Act; and WHEREAS, the Parties have investigated and determined that Project C is a roadway project as contemplated by §791.028 of the Interlocal Cooperation Act; and WHEREAS, because this Agreement involves and constitutes the exercise of a governmental function or services by Town and/or PISD, the Parties further acknowledge and agree that this Agreement is intended to be enforceable to the maximum extent authorized by the Interlocal Cooperation Act. NOW, THEREFORE, for and in consideration of the mutual covenants and agreements contained herein, the parties hereto agree as follows: 1. Descriptions and/or Depictions of the Water Line Improvements. The Water Line Improvements are individually and collectively referred to herein as "Project A" and consist of the following components described below and as depicted on Exhibit "A": Interlocal Agreement — Town and PISD Page 1 Prosper High school — 301 East Coleman 522859.v2 a. Construction of approximately 2,000' of 16" water line along Coleman Road from south of the Prosper High School, located at the southeast corner of Frontier Parkway and the Burlington Northern Santa Fe Railroad (BNSF), to the southwest corner of the Prosper High School. b. Construction of approximately 4,000' of 16" water line from the southwest corner of the Prosper High School to the northeast corner of the Prosper High School. C. Construction of approximately 2,800' of 16" water line from the northeast corner of the Prosper High School along Frontier Parkway to Preston Road (SH 289). 2. Descriptions and/or Depictions of the Sewer Line Improvements. The Sanitary Sewer Line Improvements are individually and collectively referred to herein as "Project B" and consist of the following components described below and as depicted on Exhibit `B": a. Construction of approximately 700' of sanitary sewer line along Coleman Road from south of the Prosper High School, located at the southeast corner of Frontier Parkway and the Burlington Northern Santa Fe Railroad (BNSF), to the southwest corner of the Prosper High School. b. Construction of approximately 3,200' of sanitary sewer line from the southwest corner of the Prosper High School to the north side of the Prosper High School. C. Construction of approximately 1,000' of sanitary sewer line from the north side of the Prosper High School to the northeast corner of the Prosper High School. 3. Descriptions .and/or Depictions of the Roadway Improvements. The Roadway Improvements are individually and- collectively referred to herein as "Project C" and consist of the construction of two lanes (2) of East Coleman Road adjacent to the Prosper High School, located at the southeast corner of Frontier Parkway and the Burlington Northern Santa Fe Railroad (BNSF), including concrete curb and gutter streets with underground drainage, as depicted on Exhibit "C". 4. Pro iect Estimated Construction Costs. The estimated construction costs associated with the Projects are as follows: • Project A: Water Line Improvements = $573,743 • Project B: Sanitary Sewer Line Improvements = $279,563 • Project C: Roadway Improvements = $1,840,749 Interlocal Agreement —Town and PISD Page 2 Prosper High School — 301 East Coleman 522859.v2 5. Parties' Prorata Share of Project Construction Costs. The Parties' prorata share of the Project Estimated Construction Costs as depicted on Exhibits "D" and "B" are summarized as follows: e Project A: Water Line Improvement = $573,743 In accordance with the Town of Prosper's Capital Improvement Plan, the size of the water line necessary to facilitate the Prosper High School and surrounding developments is greater than the size of a water line necessary to only serve the Prosper High School. Therefore the Town's pro-rata share of the Project Estimated Construction Costs is calculated as the difference between the total cost of Project A and the cost of a water line necessary to only serve the Prosper High School. Additional detail is provided in Exhibit "D" and is summarized below: o PISD (Items 2 and 4) _ $190,956 (Prorata Share of Project A = 33%) o Town (Difference) _ $382,787 (Prorata Share of Project A = 67%) G Project B: Sanitary Sewer Line Improvements = $279,563 In accordance with the Town of Prosper's Capital Improvement Plan, the size of the sanitary sewer line necessary to facilitate the Prosper High School and surrounding developments is greater than the size of a sanitary sewer line necessary to only serve the Prosper High School. Therefore the Town's pro-rata share of the Project Estimated Construction Costs is calculated as the difference between the total cost of Project B and the cost of a sanitary sewer line necessary to only serve the Prosper High School. Additional detail is provided in Exhibit "D" and is summarized below: o PISD (Items 7 and 9) _ $84,514 (Prorata Share of Project B = 30%) o Town (Difference) _ $195,049 (Prorata Share of Project B = 70%) • Project C: Roadway Improvements = $1,840,749 In accordance with the Town of Prosper's Thoroughfare Plan and the Traffic Impact Analysis provided by the PISD, the construction of a portion of East Coleman Road is necessary to facilitate the Prosper High School. Included in this project is the necessary underground storm drainage system to serve the Prosper High School and surrounding developments. Therefore the Town's pro-rata share of the Project Estimated Construction Costs is calculated as the difference between the total cost of the underground storm drainage system in Project C and the cost of the capacity in the underground storm drainage system necessary to only serve the Prosper High School. Additional detail is provided in Exhibit "E" and is summarized below: o PISD (Road - Drainage) _ $1,025,319 (Prorata Share of Project C =100%) o PISD (Drainage) _ $318,718 (Prorata Share of Project C = 73%) o Town (Oversize Drainage) _ $496,712 (Prorata Share of Project C = 27%) Interlocal Agreement — Town and PISD Page 3 Prosper High School — 301 East Coleman 522859.v2 TOTAL COST OF PROJECTS A-C: _ $2,694,055 PISD: = $1,619,507 (Prorata Share of Project = 60%) Town: = $1,074,548 (Prorata Share of Project = 40%) 6. Costs Paid by Parties. To facilitate the timely design and construction of the Projects, the PISD will fund 100% of the design costs for the Projects with no prorata share reimbursement from the Town. The Project Estimated Construction Costs as depicted in Exhibit "D" and "B" are to be funded by the PISD and the anticipated reimbursement by the Town for the Town's prorata share based on the Project Estimated Construction Costs is provided below. Prior to any payment by the Town, the PISD will provide Actual Construction Costs to the Town for verification. The Town will reimburse the PISD for the prorata share of the Actual Construction Costs based on the same methodology utilized to calculate the Project Estimated Construction Costs. a. Project A ($382,787): With the development of the adjacent properties within the service area boundary as depicted in Exhibit "F", water impact fees will be collected by the Town. As these impact fees are collected, the Town will reimburse the PISD semi-annually (April and October) the fees collected until the Town's prorata share of Project A is paid in full. b. Project B $195,049): Within thirty (30) business days of receiving the PISD's completion of the Project and Final Acceptance of the Prosper High School Addition Project, the Town will tender funds equal to the Town's prorata share of the Project Estimated Construction Costs for Project B. c. Proiect C ($496,712): With the development of the adjacent properties within the service area boundary as depicted in Exhibit "F", roadway impact fees will be collected by the Town. As these impact fees are collected, the Town will reimburse the PISD semi-annually (April and October) the fees collected until the Town's prorata share of Project C is paid in full. d. Prior to the final acceptance of the Prosper High School Addition Project, the PISD shall tender to the Town any remaining funds for fees required by Town Ordinances including but not limited to inspection fees and escrow fees for future improvements to facilitate the Prosper High School. 7. Term of Agreement. This Agreement shall become effective on the date set forth below and shall terminate upon Town's final acceptance of the entire Project and the payment of all monies in accordance with this Agreement. 8. Sovereign Immunity. Neither Party has waived its sovereign immunity by entering into and performing its obligations under this Agreement. 9. Assignment. Neither Party hereto shall transfer or assign any of its rights hereunder to a third Party. Interlocal Agreement — Town and PISD Page 4 Prosper High School — 301 East Coleman 522859.v2 10. Notice. Any notice required or permitted under this Agreement shall be given in writing and may be served by depositing same in the United States Mail, addressed to the party to be notified, postage pre -paid and registered or certified with return receipt requested, or by delivering the same in person to such party via a hand -delivery service, Federal Express or any courier service that provides a return receipt showing the date of actual delivery of same to the addressee thereof. Notice given in accordance herewith shall be effective upon receipt at the address of the addressee. For purposes of notice, the addresses of the parties shall be as follows: If to Town, addressed to it at: Town of Prosper ATTN: Town Manager 121 West Broadway P. O. Box 307 Prosper, Texas 75078 Telephone: (972) 346-2640 Facsimile: (972) 346-2111 If to Prosper Independent School District, addressed to it at: Prosper Independent School District Attn: Superintendent P. O. Box 100 Prosper, Texas 75078 Telephone: 972-3 46-3 316 Facsimile: 972-3 46-9247 11. Cumulative Remedies. All rights and remedies of Parties under this Article shall be cumulative, and none shall exclude any other right or remedy provided by law, or by any other provisions of the Agreement. All such rights and remedies may be exercised and enforced concurrently and whenever, and as often, as occasion for their exercise arises. 12. Waiver of Breach. A waiver by either Party of a breach of the Agreement by the other Party does not constitute a continuing waiver or a waiver of any subsequent breach of the Agreement. 13. Savings/Severability. In case any one or more of the provisions contained in this Agreement shall for any reason be held to be invalid, illegal or unenforceable in any respect, such invalidity, illegality or unenforceability shall not affect any other provision thereof, and this Agreement shall be construed as if such invalid, illegal or unenforceable provision had never been contained herein. 14. Binding Effect. This Agreement shall be binding upon and inure to the benefit of the parties hereto and their respective heirs, executors, administrators, legal representatives, successors and assigns, as allowed. 15. No Third Party Beneficiaries. Nothing in this Agreement shall be construed to Interlocal Agreement — Town and PISD Page 5 Prosper High School — 301 East Coleman 522859.v2 create any right in any third party not a signatory to this Agreement, and the Parties do not intend to create any third party beneficiaries by entering into this Agreement. 16. Incorporation of Recitals. The representations, covenants and recitations set forth in the foregoing recitals of this Agreement are true and correct and are hereby incorporated into the body of this Agreement and adopted as findings of the Parties. 17. Entire Agreement. This Agreement contains the entire agreement of the Parties with respect to the matters contained herein and may not be modified or terminated except upon the provisions hereof or by the mutual written agreement of the parties hereto. 18. Venue. This Agreement shall be construed in accordance with the laws of the State of Texas and shall be performable in Collin County, Texas. 19. Consideration. This Agreement is executed by the Parties hereto without coercion or duress and for substantial consideration, the sufficiency of which is forever confessed. 20. Counterparts. This Agreement may be executed in a number of identical counterparts, each of which shall be deemed an original for all purposes. A facsimile signature will also be deemed to constitute an original if properly executed. 21. Authority to Execute. The individuals executing this Agreement on behalf of the respective parties below represent to each other and to others that all appropriate and necessary action has been taken to authorize the individual who is executing this Agreement to do so for and on behalf of the party for which his or her signature appears, that there are no other parties or entities required to execute this Agreement in order for the same to be an authorized and binding agreement on the party for whom the individual is signing this Agreement and that each individual affixing his or her signature hereto is authorized to do so, and such authorization is valid and effective on the date hereof. The Parties agree that the performance by the Parties under this Agreement is authorized by Section 212.071, et. seq. of the Texas Local Government Code. 22. Representations. Each signatory represents this Agreement has been read by the party for which this Agreement is executed and that such party has had an opportunity to confer with its counsel. 23. Miscellaneous Drafting Provisions. This Agreement shall be deemed drafted equally by all Parties hereto. The language of all parts of this Agreement shall be construed as a whole according to its fair meaning, and any presumption or principle that the language herein is to be construed against any party shall not apply. Headings in this Agreement are for the convenience of the parties and are not intended to be used in construing this document. 24. Force Maieure. Neither Town nor PISD shall be required to perform any term, condition, or covenant in the Agreement so long as performance is delayed or prevented by force majeure, which means acts of God, strikes, lockouts, material or labor restrictions by any governmental authority, civil riots, floods, and any other cause not reasonably within the control Interlocal Agreement — Town and PISD Page 6 Prosper High School — 301 East Coleman 522859.v2 of the Town or PISD and which by the exercise of due diligence by the Town or PISD is unable, wholly or in part, to prevent or overcome. IN WITNESS WHEREOF, the parties have executed this Agreement and caused this Agreement to be effective on the latest date as reflected by the signatures below. TOWN OF P SP , TEXAS By: Mike Land, I own. Manager Date: Z3 02 i D"Town Secretary enton, TRMC INDEPENDENT SCHOOL..DISTRICT $y: �Dxe3Watkins, Superintendent Date: 9 - S = op Interlocal Agreement — Town and PISD Page 7 Prosper High School — 301 East Coleman 522859.v2 EXHIIB IT A DESCRIPTION ANDIOR DEPICT'I®N OF WATER LINE IMPR0VEIIIENTS [ 1 page attached] Interlocal Agreement — Town and PISD Page 8 Prosper High School — 30l East Coleman EXHIBIT A t 7S;TA. ERt1NE 8+28 ...... .. .............. I EXHIBIT Aa = Sta.0+00 N Sta.20+24 EXHIBIT Ab = Sta.20+24 N Sta.61+11 EXHIBIT Ac = Sta.61+11 Sta.89+26 PROSPER HIGH SCHOOL ADDITION 16" Water Line EXHIBIT R DESCRIPTION ANDIOR DEPICTION OF SANITARY SEVER LINE IMPR0 VEVIENTS [ 1 page attached] Interlocal Agreement — Town and PISD Page 10 Prosper High School — 301 East Coleman EXHIBIT B A. CoUty CCUMT --Jtob uNv sullm AssMc7 so 10, Ell MY X P41 9 02: PIUM . . E ... ..... It . ....... ... .... ..... ... .... .. ......... ...... . . . ... ........ ........ ... . ... ...... ...... ... . . ... . .... .... .. EXHIBIT Ba = Sta.o+oo , Sta.6+57 EXHIBIT Bb = Sta.6+57 , Sta-39+02 EXHIBIT Bc = Sta-39+02 — Sta.48+44 PROSPER HIGH SCHOOL ADDITION Sanitary Sewer (Line A) EXHIBIT C DESCRIPTION ANDIOYid DEPICTION OF R®ADWAYIMPR0VEMENTS [ 2 pages attached] Interlocal Agreement — Town and PISD Page 12 Prosper High School — 301 East Coleman EXHIBIT 0 PROSPER HIGH SCHOOL ADDITION Coleman Road Paving & Drainage 1 of 2 Q EXHIBIT C s. PROSPER HIGH SCHOOL ADDITION Coleman Road Paving & Drainage 2of2 EXHIBIT D PROJECT ESTIMATED CONSTRUCTION COSTS (WATER LINE AND SANITARY SEWER IMPROVEMENTS) [ 3 pages attached] Interlocal Agreement — Town and PISD Page 15 Prosper High School — 301 East Coleman Prosper High School City Infrastructure Vs. School Needs Project Aa: Project Estimated Construction Cost - water line sized per Town's CIP j Item # Description Quantity Unit Unit Price Total 1 16" PVC Water 2024 LF $34.60 $70,030.00 16" Gate Valve 2 EA $3,217.00 $6,434.00 16" x 12" Tee 1 EA $1,539.00 $1,539.00 16" x 8" Tee 1 EA $1,322.00 $1,322.00 16" X 6" Tee 2 EA $1,227.00 $2,554.00 16" x 12" Reducer 1 , EA $718.00 $718.00 Connect to Existing 1 EA $1,739.00 $1,739.00 16" Bend 2 EA $912.00 $1,824.00 Item 1 Total $86,160.00 Project Aa: Construction Cost of adequate sized water line to serve P1SD Item # Description Quantity Unit Unit Price Total 2 12" PVC Water 2024 LF $23.80 $48,171.00 12" Gate Valve 2 EA $1,732.00 $3,464.00 12" x 12" Tee 1 EA $855.00 $855.00 12" x 8" Tee 1 EA $695.00 $695.00 12" x 6" Tee 2 EA $684.00 $1,368.00 Connect to Existing 1 EA $1,739.00 $1,739.00 12" Bend 2 EA $479.00 $958.00 Item 2 Total $57,250.00 Project Ab: Project Estimated Construction Cost - water line sized per Town's CIP Item # Description Quantity Unit Unit Price Total 3 16" PVC Water 4087 LF $34.60 $141,410.00 16" Gate Valve 13 EA $3,217.00 $41,821.00 16" Tee 1 EA $1,938.00 $1,938.00 16" x 12" Tee 5 EA $1,539.00 $7,695.00 16" x 8" Tee 1 EA $1,322.00 $1,322.00 16" X 6" Tee 9 EA $2,554.00 $11,493.00 16" x 4" Tee 1 EA $1,436.00 $1,436.00 16" Bend 2 EA $912.00 $1,824.00 16" Plug 1 EA $650.00 $650.00 Item 3 Total $209,589.00 d, Project Ab: Construction Cost of adequate sized water line to serve PISD Item # Description Quantity Unit Unit Price Total 4 12" PVC Water 4087 LF $23.80 $97,271.00 12" Gate Valve 13 EA $1,732.00 $22,516.00 12" Tee 1 EA $855.00 $855.00 12" x 12" Tee 5 EA $855.00 $4,275.00 12" x 8" Tee 1 EA $695.00 $695.00 12" x 6" Tee 9 EA $684.00 $6,156.00 12" x 4" Tee 1 EA $661.00 $661.00 12" Bend 2 EA $479.00 $958.00 12" Plug 1 / EA $319.00 $319.00 Item 4 Total $133,706.00 24" Dry Bore & Steel Casing 12" C900 DR18 6" C900 DR14 24" Steel Casing by Open Cut Remove & Reinstall 16" Water Line 16" Butterfly Valve & Box 12" Gate Valve & Box 6" Gate Valve & Box Connect to Existing Stubout Standard Fire Hydrant 16"x6"Tee Cut -in 12" x 12" Tee 16" Bend 16" Vertical Bend 16" x 12" Tee 16" x 12" Reducer 16" x 16" Tee 16" Plug 12" Plug City Required Maintenance Bond Traffic Control Trench Safety Layout Water stubs for future connections 143 LF $328.90 $47,032.70 10 LF $27.50 $275.00 60 LF $20.10 $1,206.00 140 LF $99.30 $13,902.00 55 LF $19.40 $1,067.00 4 EA $3,217.00 $12,868.00 4 EA $1,789.00 $7,156.00 6 EA $735.00 $4,410.00 1 EA $584.00 $584.00 6 EA $2,217.00 $13,302.00 6 EA $1,277.00 $7,662.00 1 EA $1,542.00 $1,542.00 2 EA $912.00 $1,824.00 3 EA $1,340.00 $4,020.00 1 EA $1,596.00 $1,596.00 1 EA $718.00 $718.00 1 EA $1,984.00 $1,984.00 1 EA $673.00 $673.00 1 EA $353.00 $353.00 1 EA $713.00 $713.00 1 LS $1,710.00 $1,710.00 3090 LF $0.10 $309.00 1 LS $3,420.00 $3,420.00 1 LS $28,475.00 $28,475.00 Item 5 Total $277,994.20 Project Ba: Project Estimated Construction Cost - sanitary line sized per Town's CIP j Item # Description Quantity Unit Unit Price Total 6 24" PVC Sewer 580 LF $52.60 $30,160.00 21" PVC Sewer 77 LF $44.30 $3,411.00 5' Manhole 3 EA $4,929.00 $14,787.00 Item 6 Total $48,358.00 Project 13a: construction Cost of adequate sized sanitary sewer line to serve PISD Item # Description Quantity Unit Unit Price Total 7 8" PVC Sewer 657 LF $15.60 $10,249.00 4' Manhole 3 EA $2,627.00 $7,881.00 Item 7 Total $18,130.00 Project Bb: Project Estimated Construction Cost - sanitary line sized per Town's CIP Item # Description Quantity Unit Unit Price Total 8 21" PVC Sewer 3245 LF $44.30 $143,754.00 5' Manhole 6 EA $4,929.00 $29,674.00 Item 8 Total $173,328.00 sewer line to serve PISD 4' Manhole 6 EA $2,627.00 $15,762.00 Item 9 Total $66,384.00 Project Bc: Project Estimated Construction Cost - sanitary line sized per Town's CIP Item # Description Quantity Unit Unit Price Total 10 21" PVC Sewer 942 LF $44.30 $41,731.00 5' Manhole 3 EA $4,929.00 $14,787.00 Trench safety 942 LF $0.10 $94.20 Layout 1 LS $1,265.00 $1,265.00 Item 10 Total $67,877.20 e PROJE CT ESTIMATED CONSTRUCTION UCTION COSTS (ROAD TEA Y IMPR0 VE1dlENT ) [ 1 pages attached] lnterlocal Agreement — Town and PTSD Page 19 Prosper High School — 301 East Coleman V ,�� 9' O \V N OF L 1 6116Rk<o Sgwte 6hd,Suite 32S-Py., 12141"Is 77034 Ph- 4214)619.1733 Fix i2161619.1837 I I I West Alain SBeM -Allen, Texas 73013 � Ph 1972) 339.1733 M.- 19721310.1.13 PR. OEI� ; .' - EXHIBIT E Coleman Street Costs P, New Pros er Hi h School Item # item Descrf lion Unit Cost/ Unit Qf Total Item Cost Cost Basis PISD Qty I PISD Cost Town Offsite Qty Town Offsite Cost Coleman Street Construction Cost (Business SH 289 to East Line PISD) 1 Total Construction Cost $ 1,840,749.00 S 1,344,036.72 $ 496,712.28 73.02% 26.98% Storm Drainage (Shared Cost - PISD Site Drainage to System vs. Offslte Drainage to System) 1 48" Class III RCP Storm Drain LF $ 100.30 129 $ 12.938.70 Actual 117 $ 11,735.10 12 $ 1,203.60 2 30" Class III RCP Storm Drain LF $ 46.30 16 $ 740.80 Actual 16 $ 740.80 0 $ - 3 21" Class III RCP Storm Drain LF $ 32.00 332 $ 10,624.00 Actual 332 $ 10,624.00 0 $ 4 4'x3' RCB Storm Drain LF $ 109.30 133 $ 14.536.90 Actual 133 $ 14,536.90 0 $ 5 5'x4' RCB Storm Drain LF $ 146.40 462 $ 67,636.80 Shared (31.8%) 146.916 $ 21,508.50 315.084 $ 46,128.30 6 6'x4' RCB Storm Drain LF $ 183.20 1450 $ 265.640.00 Shared (31.8%) 461.1 $ 84,473.52 988.9 $ 181,166.48 7 9'x4' RCB Storm Drain LF $ 281.10 542 $ 152,356.20 Shared (31.8%) 172.356 $ 48,449.27 369.644 $ 103,905.93 8 2-15'x4' RCB Storm Drain LF $ 498.80 428 $ 213,486.40 Shared (36.6%) 156.648 $ 78,136.02 271.352 $ 135,350.38 9 12' Recessed Curb Inlet EA $ 2,912.00 1 $ 2,912.00 Actual 1 $ 2,912.00 0 $ 10 10' Recessed Curb inlet EA $ 2,632.00 5 $ 13,160.00 Actual 5 $ 13,160.00 0 $ - 11 8' Overtiow Recessed Curb Inlet EA $ 2,352.00 2 $ 4,704.00 Actual 2 $ 4.704.00 0 $ - 12 Stage I Inlet Protection EA $ 168.00 11 $ 1,848.00 Actual 10 $ 1,680.00 1 $ 16B.00 13 Junction Box (20'x10') EA $ 15,120.00 1 $ 15,120.00 Shared (36.6%) 0.366 $ 5,533.92 0.634 $ 9,586.08 14 TxDOT PW Headwall on 2-8'x4'RCB EA $ 13,160.00 1 $ 13,160.00 Shared (36.60%) 0.366 $ 4,816.56 0.634 $ 8,343.44 15 5' Type Y Inlet EA $ 3,668.00 3 $ 11,004.00 Actual 2 $ 7,336.00 1 $ 3,668.00 16 Grouted Rock Riprap EA $ 67.00 160 $ 10,720.00 Shared (36.6%) 58.56 $ 3,923.52 101.44 $ 6,796.48 17 Trench Safety EA $ 0.20 3492 $ 698.40 Actual 1519 $ 303.60 1973 $ 394.60 18 Layout LF $ 4,144.00 1 $ 4,144.00 Actual 1 $ 4.144.00 0 $ - Total Storm Drainage $ 815,430.20 $ 313,717.92 $ 496,712.28 39.09% 60.91 % SERVIICEAREA BOUNDARY [ 1 pages attached] Interlocal Agreement — Town and PISD Page 21 Prosper High School — 301 East Coleman 1 U . .. .. .... .. z ;; j �d EVENIRcsuR.oR :.... �� ' h _CAKE-TR.(f4LR . �Ct7t'cTOAK•Tt1 J moo`• oloof 00, - �.. P v p osperTratt C' a CI �b .y V mwl ;w jf 5 FrontiorParkway y I ~x cl .:?E. .�..1}•w«r ..�- POaT.OAK CT prosper i 7.7 'O o ra 1.9 U) I�IRCL'EJ TR •...... ...... ....•... -. or:�ACI(iAbpGE•YR. • ' _ G ( NA•DR� p w t iM ROM-CT� ai L1RIAtl'bR— DCUOt£•fl•TRL—yj.�-� �- •• ProsperTraii A ANTE{ •., O .. •,TAa.,E•ROCKDR •. + ' . CKANDGER �. rrIaIC IIELLE I