Loading...
10-085 - R TOWN OF PROSPER, TEXAS RESOLUTION NO. 10-085 A RESOLUTION OF THE TOWN COUNCIL OF THE TOWN OF PROSPER, TEXAS, HEREBY AUTHORIZING THE TOWN MANAGER OF THE TOWN OF PROSPER, TEXAS, TO EXECUTE CHANGE ORDER AGREEMENT #1 FOR LANDSCAPE ARCHITECTURE SERVICES FOR THE COMMUNITY PARK IMPROVEMENTS, BETWEEN JACOBS ENGINEERING, INC. AND THE TOWN OF PROSPER. NOW, THEREFORE, BE IT RESOLVED BY THE TOWN COUNCIL OF THE TOWN OF PROSPER, TEXAS: SECTION 1: The Town Manager of the Town of Prosper, Texas, is hereby authorized to execute, on behalf of the Town Council of the Town of Prosper, Texas, a Change #1 One for Landscape Architecture Services for the Community Park improvements between Jacobs Engineering, Inc., and the Town of Prosper, as hereto attached. SECTION 2: This Resolution shall take effect immediately upon its passage. RESOLVED THIS THE 28th day of September, 2010. Ray Smith, Mayor ATTEST O ® ,,,,H •mama M-9tthew D. Denton, TRMC e a Town SecretaryF,_ ®®® ®�^ 61•&P®ems$® �� c � JACOBS" AMENDMENT TO PROFESSIONAL SERVICES AGREEMENT PROJECT Prosper Sports Complex— PROJECT NAME: Additional Services NUMBER: WUXU2400 Date: October 7, 2010 CLIENT: Town of Prosper Attn: Wade Harden Parks and Recreation Department ADDRESS: 407 E. First Street Prosper, Texas 75078 Owner hereby requests and authorizes Jacobs Engineering Group Inc. ("JEG") to perform the following additional Services: SCOPE: A. Jacobs Engineering, Inc. is requesting an additional service request to the Community Park design contract with the Town to provide professional design services for the Town's Community Park. The original contract was in the amount of$528,000.00, for the basic design services. The requested change order is$156,000.00.The original construction value prior to beginning design was estimated at $6,250,000.00 as provided by the town on November 5, 2008 and the actual construction value after bidding is $9,107,671.00. This total is in line with the cost estimate provided to the city prior to bidding. During the design process there were elements of the park that were added as requested by the Town. These elements are listed below with addition clarification. • Re-design center plaza circle east of playground (due to gas easement) due to gas line requirements, redesign of the circular open space between ball fields was required. (new during construction) • During construction, gas line owner requested that only 7'of fill is allowed over the gas line. We had to reduce fill by 3'-5'. • The design changes required modifications to drainage, stairs, grading, planting plans, irrigation plans, and structural design for flag pole supports. • This affected 2 grading sheets, 2 drainage sheets, 2 irrigation sheets, 2 detail sheets, and 2 electrical sheets. • Design of 6 soccer fields o Provided layout, grading, irrigation and planting plans for additional soccer fields on the SE portion of the site o This affected 6 grading sheets, 3 drainage sheets, 6 irrigation sheets, and 1 detail WUXU2400.PSA01 Page 1 of 3 sheets. • Design of 1 additional baseball field • Original MP called for a 4-plex design. • Due to restrictions of the gas line,we could not provide ball fields over gas line and had to split the complex to either side of the easement. This created a 5th field at the baseball field complex. • This required additional grading to all areas around complex, additional irrigation, planting, bleachers, additional room for playground. • This affected 6 grading sheets, 6 drainage sheets, 6 planting sheets, 6 irrigation sheets, 4 detail sheets, and 4 electrical sheets. • Design of Restroom/Concession Structure o With the addition of the soccer fields in the SE portion of the site,the program also included a need for a restroom/concession structure at the soccer area. o This added 8 architecture sheets, 1 structural sheet, 8 MEP sheets,2 planting,and 2 irrigation sheets. o Added additional structural design per cities request for baseball restroom/concession building. • Additional Irrigation Design o Miscellaneous irrigation calculations,for added irrigation zones, and improvements during construction. • Earth Sculpture Design (new during construction) o Provided grading plans for area SW portion of site for additional fill from site grading. • Re-design of site electrical • Needed to redesign electrical due to added soccer fields, and baseball fields • Provided power extra irrigation pumps, provide new building power, and additional lighting for extra baseball field • Change in electrical services requirements by ONCOR • Redesign feed location due to contractor wanting to do well design first. The request was to provide a design that would allow the contractor to obtain power sooner. • After 95%drawings town changed pedestrian fixtures which resulted in redoing all the calculations and layout of the pedestrian fixtures. • Additional design of RLK loop road lighting. Lump Sum Fee: $156,000.00 COMPENSATION to be on a basis of: A total lump sum amount of $156,000.00 The Additional Services described herein are to be performed pursuant to the original Agreement for Professional Services dated November 25, 2008 (the"Agreement'). The provisions in Section XIV of the original Agreement are not applicable to the additional Services described herein. WUXU2400.PSA01 Page 2 of 3 The Agreement and this amendment to the Agreement embody the entire agreement between the parties regarding the subject matter hereof. There are no oral understandings or agreements between the parties regarding the subject matter hereof. This amendment to the Agreement may only be amended by written agreement executed by all parties hereto. Any term not defined herein shall be deemed to have the meaning ascribed to it under the Agreement. Except as expressly amended hereby, all of the terms, provisions, covenants and conditions of the Agreement are hereby ratified and confirmed and shall continue in full force and effect. This Amendment may not be assigned by any party without the prior written consent of the parties hereto. Accepted for OWNER Accepted for JACOBS ENGINEERING GROUP INC. By: —, _ By: slit r t(c L Name: sa-.-J Q Name: Fred Lowrance Title: 0J7,0AJ 1*04 cl g5,e� Title: Principal Date: 2�C �l¢� Date: WUXU2400.PSA01 Page 3 of 3