03.04.2025 Bond Election Committee Meeting PresentationMarch 4, 2025, 2025 Bond Election Committee Meeting Infrastructure Hulon T. Webb, Jr., P.E. Director of Engineering Services Coit Road (US 380 - Frontier Parkway) Design: 2 lanes to be designed to expand the current 4 lanes to the ultmate 6-lane divided roadway.1,200,000$ Legacy Drive (US 380 - Frontier Parkway) Design: 2 lanes to be designed to expand the current 4 lanes to the ultmate 6-lane divided roadway.1,000,000$ Teel Parkway (US 380 - Parvin Road) Design: 2 lanes to be designed to expand the current 4 lanes to the ultmate 6-lane divided roadway.1,000,000$ SUBTOTAL DESIGN 3,200,000.00$ Traffic Signals Design & Construction: 10 traffic signals at $600,000/each 6,000,000$ SUBTOTAL TRAFFIC SIGNALS 9,200,000.00$ Street Lights Coit Road (Lakewood - Frontier)3,000,000$ Street Lights First Street (Gee - DNT)5,000,000$ Street Lights First Street (DNT - Coleman)1,500,000$ Street Lights First Street (Craig - Custer)5,000,000$ Street Lights Prosper Trail (DNT - Custer)7,500,000$ Street Lights Teel Parkway (US 380 - Parvin)4,500,000$ Street Lights Legacy Drive (US 380 - Parvin)4,500,000$ SUBTOTAL STREET LIGHTS 31,000,000.00$ PRIORITY ID ROADWAY DESCRIPTION COST* 1 Legacy Drive (Prosper Trail - Parvin) Reimbursement to PISD: 2 lanes of ultimate 6-lane divided roadway with concrete, curb and underground drainage from Prosper Trail to Parvin Road. Includes oversize participation of 16" water line. 10,000,000$ 2 Coleman Road (First - Gorgeous) ROW & Construction: 2-lane ultimate divided roadway and on-street parking with concrete, curb and underground drainage from First Street to Gorgeous.9,000,000$ 3 Gee Road (US 380 - FM 1385) Construction: Denton County Bond Project for ultimate 6-lane divided roadway with concrete, curb and underground drainage from US 380 to east of proposed intersection of FM 1385. 20,000,000$ 4 Teel Parkway (First - Freeman) ROW & Construction: 2 lanes on west side of divided roadway with concrete, curb and underground drainage from First Street to Freeman Road to complete 4 lanes. Teel Parkway to be a 6-lane ultimate divided roadway. 9,500,000$ 5 First Street (Craig - Coleman) Construction: 3-lane undivided roadway with concrete, curb and underground drainage from Craig Street to Coleman Road. Includes 8' trail on south side. 10,500,000$ 6 Prosper Trail (Legacy - DNT) Construction: 2 lanes on north side of divided roadway with concrete, curb and underground drainage from Legacy Road to Dallas North Tollway to complete 4 lanes 10,000,000$ 7 Legacy Drive (Star Trail - Legacy MS) Design, ROW & Construction: 2 lanes on west side of divided roadway with concrete, curb and underground drainage from Star Trail to Legacy Middle School to complete the 4 lanes. Legacy Drive to be a 6-lane divided roadway. 5,800,000$ 8 Prosper Trail (Teel - Legacy) Design, ROW & Construction: 2 lanes on north side of divided roadway with concrete, curb and underground drainage from east of Teel Parkway to Legacy Road to complete 4 lanes 12,000,000$ 9 Gorgeous (LIV - Coleman) ROW & Construction: 2 lanes concrete, curb and underground drainage from the LIV development to Coleman road to complete the connection with McKinley Drive.2,500,000$ 10 Broadway (Coleman - Preston) Design and Construction: 2-lane ultimate divided roadway and on-street parking with concrete, curb and underground drainage from Coleman Road to Preston Road.10,000,000$ 11 Business Park Drive (Lovers Lane/Godwin - First) Design, ROW & Construction: 2 lanes concrete, curb and underground drainage from Lovers Lane/Godwin Parkway to First Street.6,300,000$ 12 Teel Parkway (Prosper Trail - Parvin) Design, ROW & Construction: 2 lanes on west side of divided roadway with concrete, curb and underground drainage from Prosper Trail to Parvin Road to complete the 4 lanes. Teel Parkway to be a 6-lane ultimate divided roadway. 9,700,000$ 13 Frontier Parkway (Legacy - DNT) ROW & Construction: 2 lanes of sourth side of divided roadway with concrete, curb and underground drainage from Legacy Drive to Dallas North Tollway. 7,000,000$ 14 Parvin Road (FM1385 - Legacy Drive) ROW & Construction: Joint project with the City of Celina and possibly Denton County. 4 lane divided concrete, curb and underground drainage from FM 1385 to Legacy Drive. Parvin Road to be a 6-lane ultimate divided roadway. 25,000,000$ SUBTOTAL CONSTRUCTION 147,300,000.00$ Roundabout (La Cima/First Street)Design and Construction: 3 way intersection of (2) 4-lane minor thoroughfares 2,500,000$ Roundabout (Richland/Lakewood)Design and Construction: 4 way intersection of (2) collector roadways 2,500,000$ Roundabout (TBD) Possible location(s): Shawnee/Prosper Trail; Shawnee/First; Lovers Lane/Mahard; Lovers Lane/Business Park Drive; First/Mike Howard; Prosper Trail/Mike Howard 3,000,000$ SUBTOTAL ROUNDABOUT 8,000,000.00$ TOTAL PROPOSED 2025 - 2035 195,500,000$ ALTERNATE FUNDING: POTENTIAL REGIONAL FUNDING (50% PARTICIPATION): GEE ROAD 10,000,000$ POTENTIAL DEVELOPMENT AGREEMENTS 6,300,000$ POTENTIAL REGIONAL FUNDING (50% PARTICIPATION): PARVIN ROAD 12,500,000$ POTENTIAL ROADWAY IMPACT FEES 12,200,000$ TOTAL PROPOSED INFRASTRUCTURE BOND FUNDING 154,500,000$ FOR CONSIDERATION/DISCUSSION: REMOVE TOWN 50% PARTICIPATION FUNDING: PARVIN ROAD 12,500,000$ REMOVE PROJECT FUNDING 22,500,000$ DO NOT INCLUDE STREET LIGHTS 31,000,000$ REVISED TOTAL PROPOSED INFRASTRUCTURE BOND FUNDING 88,500,000$ ID ROADWAY DESCRIPTION COST* 1 Legacy Drive (Prosper Trail - Parvin) Reimbursement to PISD: 2 lanes of ultimate 6-lane divided roadway with concrete, curb and underground drainage from Prosper Trail to Parvin Road. Includes oversize participation of 16" water line. 10,000,000$ 2 Coleman Road (First - Gorgeous) ROW & Construction: 2-lane ultimate divided roadway and on-street parking with concrete, curb and underground drainage from First Street to Gorgeous.9,000,000$ 3 Gee Road (US 380 - FM 1385) Construction: Denton County Bond Project for ultimate 6-lane divided roadway with concrete, curb and underground drainage from US 380 to east of proposed intersection of FM 1385. (50% Funding Participation) 10,000,000$ 4 Teel Parkway (First - Freeman) ROW & Construction: 2 lanes on west side of divided roadway with concrete, curb and underground drainage from First Street to Freeman Road to complete 4 lanes. Teel Parkway to be a 6-lane ultimate divided roadway. 9,500,000$ 5 First Street (Craig - Coleman) Construction: 3-lane undivided roadway with concrete, curb and underground drainage from Craig Street to Coleman Road. Includes 8' trail on south side. 10,500,000$ 6 Prosper Trail (Legacy - DNT) Construction: 2 lanes on north side of divided roadway with concrete, curb and underground drainage from Legacy Road to Dallas North Tollway to complete 4 lanes 10,000,000$ 8 Prosper Trail (Teel - Legacy) Design, ROW & Construction: 2 lanes on north side of divided roadway with concrete, curb and underground drainage from east of Teel Parkway to Legacy Road to complete 4 lanes 12,000,000$ 9 Gorgeous (LIV - Coleman) ROW & Construction: 2 lanes concrete, curb and underground drainage from the LIV development to Coleman road to complete the connection with McKinley Drive.2,500,000$ 10 Broadway (Coleman - Preston) Design and Construction: 2-lane ultimate divided roadway and on-street parking with concrete, curb and underground drainage from Coleman Road to Preston Road.10,000,000$ SUBTOTAL CONSTRUCTION 83,500,000.00$ Roundabout (La Cima/First Street)Design and Construction: 3 way intersection of (2) 4-lane minor thoroughfares 2,500,000$ Roundabout (Richland/Lakewood)Design and Construction: 4 way intersection of (2) collector roadways 2,500,000$ SUBTOTAL ROUNDABOUT 5,000,000.00$ TOTAL PROPOSED 2025 - 2035 195,500,000$ ALTERNATE FUNDING:POTENTIAL REGIONAL FUNDING (50% PARTICIPATION): GEE ROAD 10,000,000$ POTENTIAL DEVELOPMENT AGREEMENTS 6,300,000$ POTENTIAL REGIONAL FUNDING (50% PARTICIPATION): PARVIN ROAD 12,500,000$ POTENTIAL ROADWAY IMPACT FEES 12,200,000$ TOTAL PROPOSED INFRASTRUCTURE BOND FUNDING 154,500,000$ FOR CONSIDERATION/DISCUSSION:REMOVE TOWN 50% PARTICIPATION FUNDING: PARVIN ROAD 12,500,000$ REMOVE PROJECT FUNDING 22,500,000$ DO NOT INCLUDE STREET LIGHTS 31,000,000$ REVISED TOTAL PROPOSED INFRASTRUCTURE BOND FUNDING 88,500,000$