Loading...
03.12.24 Town Council Meeting Presentation Work SessionWelcome to the March 12, 2024, Prosper Town Council Work Session Call to Order/Roll Call Executive Session Section 551.087 – To discuss and consider economic development incentives and all matters incident and related thereto. Section 551.072 – To discuss and consider purchase, exchange, lease or value of real property for municipal purposes and all matters incident and related thereto. Section 551.074 – To discuss and consider personnel matters and all matters incident and related thereto. Section 551.071 – Consultation with the Town Attorney to discuss legal issues associated with any agenda item. Section 551.071 – To consult with the Town Attorney regarding Chapter 42 of the Texas Local Government Code and Extraterritorial Jurisdiction land use and development issues, and all matters incident and related thereto. Section 551.074 - To discuss and consider personnel matters, including the annual evaluation of the Town Manager, Town Attorney and the Municipal Judge, and all matters incident and related thereto. The Town Council will reconvene after Executive Session. Reconvene into Work Session Agenda Item 1. Discussion regarding the Upper Trinity Regional Water District (UTRWD) Doe Branch Water Reclamation Plant expansion. (CE) Expansion of the Doe Branch Water Reclamation Plant Little Elm, Texas Current Capacity – 4 MGD Permitted to 20 MGD Doe Branch Water Reclamation Plant (WRP) Projects Included in Agreement •Doe Branch Plant Expansion to 8 MGD •Estimated Cost $209,892,554 •Prosper share $104,946,277 •Doe Branch Interceptor Line •Estimated Cost $30,000,000 •Prosper share $15,000,000 Doe Branch WRP Flows & Trends 0 2 4 6 8 10 12 N-16A-17S-17F-18J-18D-18M-19O-19M-20A-20J-21J-21N-21A-22S-22F-23J-23D-23M-24O-24M-25A-25J-26J-26N-26A-27S-27F-28J-28D-28M-29O-29M-30A-30J-31Flow (mgd)Permitted Plant Capacity Phase 3 Operational TCEQ Notice of Violation issued for flow exceeding capacity Doe Branch WRP - - Prosper Flows Phase 2 Operational (Nov. 2021) Phase 3 Preliminary Engineering Started (Sept. 2022) Final Design Contract Awarded (Feb. 2023) CMAR Selected (June 2023) Doe Branch WRP expansion budget estimates Description Conceptual Estimate (8.0 mgd) CMAR 30% (8.0 mgd) CMAR 30% Phase 3A (8.0 mgd phased) CMAR 30% Phase 3B (8.0 mgd phased) AACE Estimate Class 4 3 3 3 Direct costs $ 74,524,302 $ 136,284,270 $ 105,651,332 $ 44,050,577 Indirect costs $ 72,237,174 $ 50,162,138 $ 38,887,075 $ 16,213,691 Estimated construction cost $ 146,761,476 $ 186,446,408 $ 144,538,407 $ 60,264,268 Engineering & PM -$23,446,146 $30,949,584 Total Cost (8.0 MGD)-$209,892,554 $235,752,259 Notes: 1)OPCC is before design and without plans and specs 2)Based on 30% design plans Key factors impacting project cost •Higher waste load - - Flow is not the only factor. •Building new facilities next to existing. Not modifying existing. •Engineer’s estimates differ from CMAR cost estimates. •Construction costs continue to escalate Conceptual Estimate 30% CMAR Estimate •Based on historical Information •Lags approximately 8-12 months from current conditions •Industry indexes (averages) •Based on general concepts -- not detailed design •Current market conditions •Estimates based on active projects and recent bids •Real time local escalation •Based on detailed design -- 30% Design Drawings Wastewater Treatment Construction Costs Project Estimate or Award Date Construction Cost ($) Design/ Expansion capacity (mgd, AADF) Unit construction cost ($ / gallon) Comments Bids The Colony Stewart Creek WWTP Expansion Ph. 1 + 2A 2015 2020 $30,329,266 ($17,797,000 +$12,532,226) 0.9 $ 33.70 Expand from 3.6 mgd to 4.5 mgd and new dewatering facility in phases NTMWD Sister Grove WWRF 2020 $368,192,252 16 $ 23.01 CMAR including fees, EBPR process similar to DB Celina Legacy Hills WRF 2023 $33,051,795 0.95 $ 34.79 SBR does not have clarifiers Estimates Hutto WWTP 2023 $143,654,226 6 $ 23.94 90% CMAR cost model UTRWD Doe Branch WRF Ph. 3 2023 $186,446,408 8 $ 23.31 CMAR 30% including fees, New plant with dewatering UTRWD Doe Branch WRF Ph. 3A 2023 $144,538,407 4 $ 36.13 Similar outcome as the Colony, overall cost increases Current Financing Plan •Approximately $6.1M transferred •Plant Expansion - Issue $55M in CO’s over next two years •Doe Branch Interceptor - Issue $7.4M in CO’s over next two years •Remainder based on final costs •Will work with UTRWD on financing options •Projections/Impact Fee Study completed by the end of the year. •Amended Agreement – 26 March 2024 •Recommend subscribing to 3.125 MGD (Total 4.125 MGD) •3 MGD Additional Capacity •.125 MGD Existing Capacity •1 MGD Unsubscribed Capacity Adjourn